BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
refugiaporter-blog · 8 years ago
Text
BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
lanceblog-us-blog · 8 years ago
Text
BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes made.     Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
my-lesliemeyers-blog · 8 years ago
Text
BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes made.     Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
denicewilt-blog · 8 years ago
Text
BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes made.     Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
earlenepark-blog · 8 years ago
Text
BUS 519 ASSIGNMENT 4 PROJECT PROGRESS – EQI IN SIWA
To Download tutorial Copy and Paste below Link into your Browser
https://www.essayblue.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 for any inquiry email us at  ( [email protected] )
 BUS 519 Assignment 4 Project Progress – EQI in SIWA
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
1.     The top-two (2) threats have occurred.
2.     The top opportunity has been realized.
3.     The project’s risk budget is already exhausted.
4.     The risk management schedule has been shortened by two (2) months.
Write a five to seven (5-7) page paper in which you:
1.     Analyze the impact of those events on the project.
2.     Determine if any mitigation activities are required and explain why.
3.     Determine if budget / schedule changes are necessary and explain why.
4.     Update the risk register and highlight the changes made. Provide the justification for the changes.
5.     Use at least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
Text
BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-assignment-4-project-progress-eqi-siwa/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes made.     Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
annenewton-blog · 8 years ago
Text
BUS 519 Project Risk Management Entire Course
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-project-risk-management-entire-course/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
Analyze how the Critical Success Factors (CSFs) apply     to the facts of the case study. Provide examples to support your analysis.
Determine the project benefits, organizational     readiness, and risk culture of the company in the case study. Provide     justification for your response.
Develop at least three (3) project risk recommendations     based on the analysis from criteria number 1 and 2 of this assignment.
Identify the initial categories of risk (RBS Level 1     and 2) that you see as being present in the case study using the Example     Risk Checklist (Figure A-2, Hillson & Simon text).
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk management     using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
Prepare the Scope and Objectives of the Risk Management     Process section of the Risk Management Plan based on the facts presented     in the case study.
Determine the project size, based on the facts     presented in the case study, and provide justification based on Figure     3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon     text).
Select the risk tools and techniques, and complete the     Risk Tools and Techniques section of the Risk Management Plan for both the     qualitative and quantitative aspects of the project. Provide a rationale     for the selection.
Develop the Risk Reviews and Reporting section of the     Risk Management Plan based on the project size previously determined.
Define the Probability and Impacts section of the Risk     Management Plan and justify the values assigned.
Define the Risk Thresholds section of the Risk     Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research issues     in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Figure B-8,     Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop     (Appendix B of the Hillson and Simon text). Include suggested time     intervals for each activity and justify why each agenda item is relevant     for this case.
Determine the top five (5) threats in a risk register     following Figure B-11, Sample Simplified Risk Register Format (Appendix B     of the Hillson and Simon text). Include information from the case for each     threat.
Justify the assignment of probability and impacts for     each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk     register following Figure B-11, Sample Simplified Risk Register Format     (Appendix B of the Hillson and Simon text). Include information from the     case for each opportunity.
Justify the assignment of probability and impacts for     each opportunity identified in criterion number 5 of this assignment.Â
Use at least two (2) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
refugiaporter-blog · 8 years ago
Text
BUS 519 Project Risk Management Entire Course
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-project-risk-management-entire-course/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
Analyze how the Critical Success Factors (CSFs) apply     to the facts of the case study. Provide examples to support your analysis.
Determine the project benefits, organizational     readiness, and risk culture of the company in the case study. Provide     justification for your response.
Develop at least three (3) project risk recommendations     based on the analysis from criteria number 1 and 2 of this assignment.
Identify the initial categories of risk (RBS Level 1     and 2) that you see as being present in the case study using the Example     Risk Checklist (Figure A-2, Hillson & Simon text).
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk management     using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
Prepare the Scope and Objectives of the Risk Management     Process section of the Risk Management Plan based on the facts presented     in the case study.
Determine the project size, based on the facts     presented in the case study, and provide justification based on Figure     3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon     text).
Select the risk tools and techniques, and complete the     Risk Tools and Techniques section of the Risk Management Plan for both the     qualitative and quantitative aspects of the project. Provide a rationale     for the selection.
Develop the Risk Reviews and Reporting section of the     Risk Management Plan based on the project size previously determined.
Define the Probability and Impacts section of the Risk     Management Plan and justify the values assigned.
Define the Risk Thresholds section of the Risk     Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research issues     in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Figure B-8,     Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop     (Appendix B of the Hillson and Simon text). Include suggested time     intervals for each activity and justify why each agenda item is relevant     for this case.
Determine the top five (5) threats in a risk register     following Figure B-11, Sample Simplified Risk Register Format (Appendix B     of the Hillson and Simon text). Include information from the case for each     threat.
Justify the assignment of probability and impacts for     each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk     register following Figure B-11, Sample Simplified Risk Register Format     (Appendix B of the Hillson and Simon text). Include information from the     case for each opportunity.
Justify the assignment of probability and impacts for     each opportunity identified in criterion number 5 of this assignment.Â
Use at least two (2) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
lanceblog-us-blog · 8 years ago
Text
BUS 519 Project Risk Management Entire Course
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-project-risk-management-entire-course/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
Analyze how the Critical Success Factors (CSFs) apply     to the facts of the case study. Provide examples to support your analysis.
Determine the project benefits, organizational     readiness, and risk culture of the company in the case study. Provide     justification for your response.
Develop at least three (3) project risk recommendations     based on the analysis from criteria number 1 and 2 of this assignment.
Identify the initial categories of risk (RBS Level 1     and 2) that you see as being present in the case study using the Example     Risk Checklist (Figure A-2, Hillson & Simon text).
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
Prepare the Scope and Objectives of the Risk Management     Process section of the Risk Management Plan based on the facts presented     in the case study.
Determine the project size, based on the facts     presented in the case study, and provide justification based on Figure     3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon     text).
Select the risk tools and techniques, and complete the     Risk Tools and Techniques section of the Risk Management Plan for both the     qualitative and quantitative aspects of the project. Provide a rationale     for the selection.
Develop the Risk Reviews and Reporting section of the     Risk Management Plan based on the project size previously determined.
Define the Probability and Impacts section of the Risk     Management Plan and justify the values assigned.
Define the Risk Thresholds section of the Risk     Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research issues     in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Figure B-8,     Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop     (Appendix B of the Hillson and Simon text). Include suggested time     intervals for each activity and justify why each agenda item is relevant     for this case.
Determine the top five (5) threats in a risk register     following Figure B-11, Sample Simplified Risk Register Format (Appendix B     of the Hillson and Simon text). Include information from the case for each     threat.
Justify the assignment of probability and impacts for     each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk     register following Figure B-11, Sample Simplified Risk Register Format     (Appendix B of the Hillson and Simon text). Include information from the     case for each opportunity.
Justify the assignment of probability and impacts for     each opportunity identified in criterion number 5 of this assignment.Â
Use at least two (2) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
my-lesliemeyers-blog · 8 years ago
Text
BUS 519 Project Risk Management Entire Course
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-project-risk-management-entire-course/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
Analyze how the Critical Success Factors (CSFs) apply     to the facts of the case study. Provide examples to support your analysis.
Determine the project benefits, organizational     readiness, and risk culture of the company in the case study. Provide     justification for your response.
Develop at least three (3) project risk recommendations     based on the analysis from criteria number 1 and 2 of this assignment.
Identify the initial categories of risk (RBS Level 1     and 2) that you see as being present in the case study using the Example     Risk Checklist (Figure A-2, Hillson & Simon text).
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
Prepare the Scope and Objectives of the Risk Management     Process section of the Risk Management Plan based on the facts presented     in the case study.
Determine the project size, based on the facts     presented in the case study, and provide justification based on Figure     3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon     text).
Select the risk tools and techniques, and complete the     Risk Tools and Techniques section of the Risk Management Plan for both the     qualitative and quantitative aspects of the project. Provide a rationale     for the selection.
Develop the Risk Reviews and Reporting section of the     Risk Management Plan based on the project size previously determined.
Define the Probability and Impacts section of the Risk     Management Plan and justify the values assigned.
Define the Risk Thresholds section of the Risk     Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research issues     in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Figure B-8,     Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop     (Appendix B of the Hillson and Simon text). Include suggested time     intervals for each activity and justify why each agenda item is relevant     for this case.
Determine the top five (5) threats in a risk register     following Figure B-11, Sample Simplified Risk Register Format (Appendix B     of the Hillson and Simon text). Include information from the case for each     threat.
Justify the assignment of probability and impacts for     each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk     register following Figure B-11, Sample Simplified Risk Register Format     (Appendix B of the Hillson and Simon text). Include information from the     case for each opportunity.
Justify the assignment of probability and impacts for     each opportunity identified in criterion number 5 of this assignment.Â
Use at least two (2) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
denicewilt-blog · 8 years ago
Text
BUS 519 Project Risk Management Entire Course
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-project-risk-management-entire-course/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
Analyze how the Critical Success Factors (CSFs) apply     to the facts of the case study. Provide examples to support your analysis.
Determine the project benefits, organizational     readiness, and risk culture of the company in the case study. Provide     justification for your response.
Develop at least three (3) project risk recommendations     based on the analysis from criteria number 1 and 2 of this assignment.
Identify the initial categories of risk (RBS Level 1     and 2) that you see as being present in the case study using the Example     Risk Checklist (Figure A-2, Hillson & Simon text).
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
Prepare the Scope and Objectives of the Risk Management     Process section of the Risk Management Plan based on the facts presented     in the case study.
Determine the project size, based on the facts     presented in the case study, and provide justification based on Figure     3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon     text).
Select the risk tools and techniques, and complete the     Risk Tools and Techniques section of the Risk Management Plan for both the     qualitative and quantitative aspects of the project. Provide a rationale     for the selection.
Develop the Risk Reviews and Reporting section of the     Risk Management Plan based on the project size previously determined.
Define the Probability and Impacts section of the Risk     Management Plan and justify the values assigned.
Define the Risk Thresholds section of the Risk     Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research issues     in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Figure B-8,     Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop     (Appendix B of the Hillson and Simon text). Include suggested time     intervals for each activity and justify why each agenda item is relevant     for this case.
Determine the top five (5) threats in a risk register     following Figure B-11, Sample Simplified Risk Register Format (Appendix B     of the Hillson and Simon text). Include information from the case for each     threat.
Justify the assignment of probability and impacts for     each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk     register following Figure B-11, Sample Simplified Risk Register Format     (Appendix B of the Hillson and Simon text). Include information from the     case for each opportunity.
Justify the assignment of probability and impacts for     each opportunity identified in criterion number 5 of this assignment.Â
Use at least two (2) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
earlenepark-blog · 8 years ago
Text
BUS 519 (PROJECT RISK MANAGEMENT) COMPLETE CLASS
To Download tutorial Copy and Paste below Link into your Browser
https://www.essayblue.com/downloads/bus-519-project-risk-management-complete-class/
 for any inquiry email us at  ( [email protected] )
 BUS 519 (Project Risk Management) Complete Class
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
1.     Analyze how the Critical Success Factors (CSFs) apply to the facts of the case study. Provide examples to support your analysis.
2.     Determine the project benefits, organizational readiness, and risk culture of the company in the case study. Provide justification for your response.
3.     Develop at least three (3) project risk recommendations based on the analysis from criteria number 1 and 2 of this assignment.
4.     Identify the initial categories of risk (RBS Level 1 and 2) that you see as being present in the case study using the Example Risk Checklist (Figure A-2, Hillson & Simon text).
5.     Use at least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
1.     Prepare the Scope and Objectives of the Risk Management Process section of the Risk Management Plan based on the facts presented in the case study.
2.     Determine the project size, based on the facts presented in the case study, and provide justification based on Figure 3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon text).
3.     Select the risk tools and techniques, and complete the Risk Tools and Techniques section of the Risk Management Plan for both the qualitative and quantitative aspects of the project. Provide a rationale for the selection.
4.     Develop the Risk Reviews and Reporting section of the Risk Management Plan based on the project size previously determined.
5.     Define the Probability and Impacts section of the Risk Management Plan and justify the values assigned.
6.     Define the Risk Thresholds section of the Risk Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
1.     Identify the required pre-workshop activities.
2.     Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.
3.     Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat.
4.     Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.
5.     Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity.
6.     Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment.Â
7.     Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
1.     The top-two (2) threats have occurred.
2.     The top opportunity has been realized.
3.     The project’s risk budget is already exhausted.
4.     The risk management schedule has been shortened by two (2) months.
Write a five to seven (5-7) page paper in which you:
1.     Analyze the impact of those events on the project.
2.     Determine if any mitigation activities are required and explain why.
3.     Determine if budget / schedule changes are necessary and explain why.
4.     Update the risk register and highlight the changes made. Provide the justification for the changes.
5.     Use at least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
  an>
0 notes
earlenepark-blog · 8 years ago
Text
BUS 519 (PROJECT RISK MANAGEMENT) COMPLETE ASSIGNMENT
To Download tutorial Copy and Paste below Link into your Browser
https://www.essayblue.com/downloads/bus-519-project-risk-management-complete-assignment/
 for any inquiry email us at  ( [email protected] )
 BUS 519 (Project Risk Management) Complete Assignment
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
1.     Analyze how the Critical Success Factors (CSFs) apply to the facts of the case study. Provide examples to support your analysis.
2.     Determine the project benefits, organizational readiness, and risk culture of the company in the case study. Provide justification for your response.
3.     Develop at least three (3) project risk recommendations based on the analysis from criteria number 1 and 2 of this assignment.
4.     Identify the initial categories of risk (RBS Level 1 and 2) that you see as being present in the case study using the Example Risk Checklist (Figure A-2, Hillson & Simon text).
5.     Use at least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
1.     Prepare the Scope and Objectives of the Risk Management Process section of the Risk Management Plan based on the facts presented in the case study.
2.     Determine the project size, based on the facts presented in the case study, and provide justification based on Figure 3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon text).
3.     Select the risk tools and techniques, and complete the Risk Tools and Techniques section of the Risk Management Plan for both the qualitative and quantitative aspects of the project. Provide a rationale for the selection.
4.     Develop the Risk Reviews and Reporting section of the Risk Management Plan based on the project size previously determined.
5.     Define the Probability and Impacts section of the Risk Management Plan and justify the values assigned.
6.     Define the Risk Thresholds section of the Risk Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
1.     Identify the required pre-workshop activities.
2.     Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.
3.     Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat.
4.     Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment.
5.     Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity.
6.     Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment.Â
1.     Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
1.     The top-two (2) threats have occurred.
2.     The top opportunity has been realized.
3.     The project’s risk budget is already exhausted.
4.     The risk management schedule has been shortened by two (2) months.
Write a five to seven (5-7) page paper in which you:
1.     Analyze the impact of those events on the project.
2.     Determine if any mitigation activities are required and explain why.
3.     Determine if budget / schedule changes are necessary and explain why.
4.     Update the risk register and highlight the changes made. Provide the justification for the changes.
5.     Use at least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.
0 notes
Text
BUS 519 Project Risk Management Entire Course
 Follow Below Link to Download Tutorial
https://homeworklance.com/downloads/bus-519-project-risk-management-entire-course/
 For More Information Visit Our Website (   https://homeworklance.com/ )
 BUS 519 Assignment 1: Assess Organizational Readiness ( EQI in SIWA )
 Due Week 3 and worth 200 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.Â
Review the assigned case study and complete this assignment.
Write a five to seven (5-7) page paper in which you:
Analyze how the Critical Success Factors (CSFs) apply     to the facts of the case study. Provide examples to support your analysis.
Determine the project benefits, organizational     readiness, and risk culture of the company in the case study. Provide     justification for your response.
Develop at least three (3) project risk recommendations     based on the analysis from criteria number 1 and 2 of this assignment.
Identify the initial categories of risk (RBS Level 1     and 2) that you see as being present in the case study using the Example     Risk Checklist (Figure A-2, Hillson & Simon text).
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Analyze the critical success factors (CSFs), project     benefits, and organizational readiness and risk culture of the company.
Apply the results of this analysis to the development     of project risk recommendations.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
BUS 519 Assignment 2: Risk Management Plan ( EQI in SIWA )
 Due Week 4 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
In this assignment, you will create a risk management plan. You have a budget of $100,000 and a timeline of six (6) months for the plan. Please refer to Figure A-1, Risk Management Plan Template, from Appendix A of the Hillson and Simon text to create the plan.
Write an eight to ten (8-10) page Risk Management Plan Component paper in which you:
Prepare the Scope and Objectives of the Risk Management     Process section of the Risk Management Plan based on the facts presented     in the case study.
Determine the project size, based on the facts     presented in the case study, and provide justification based on Figure     3-4, Example Project Sizing Tool (Chapter 3 of the Hillson and Simon     text).
Select the risk tools and techniques, and complete the     Risk Tools and Techniques section of the Risk Management Plan for both the     qualitative and quantitative aspects of the project. Provide a rationale     for the selection.
Develop the Risk Reviews and Reporting section of the     Risk Management Plan based on the project size previously determined.
Define the Probability and Impacts section of the Risk     Management Plan and justify the values assigned.
Define the Risk Thresholds section of the Risk     Management Plan and justify the values assigned.
 Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Apply the concepts of risk management in a project     context to develop an appropriate risk management plan as a key element of     the project management process.
Survey the project sponsor, stakeholders, team     membership and key decision influencers to develop a qualitative     assessment of the project risks and apply the results to further refine     the project risk management plan.
Create a schedule of project risk reviews appropriate     to the organization and risk including major, minor, and post-project     threats and opportunities, including archiving the results of the project     risk plan is incorporated into this schedule.
Use technology and information resources to research issues     in project risk management
Write clearly and concisely about project risk     management using proper writing mechanics.
  BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA )
 Due Week 6 and worth 240 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
 Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you:
Identify the required pre-workshop activities.
Prepare a risk workshop agenda based on Figure B-8,     Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop     (Appendix B of the Hillson and Simon text). Include suggested time     intervals for each activity and justify why each agenda item is relevant     for this case.
Determine the top five (5) threats in a risk register     following Figure B-11, Sample Simplified Risk Register Format (Appendix B     of the Hillson and Simon text). Include information from the case for each     threat.
Justify the assignment of probability and impacts for     each threat identified in criterion number 3 of this assignment.
Document the top three (3) opportunities in a risk     register following Figure B-11, Sample Simplified Risk Register Format     (Appendix B of the Hillson and Simon text). Include information from the     case for each opportunity.
Justify the assignment of probability and impacts for     each opportunity identified in criterion number 5 of this assignment.Â
Use at least two (2) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Assess and prioritize risks to the project through an     analysis of the active threats and opportunities presented.
Apply the Active Threats and Opportunities Management     (ATOM) process to ensure a consistent, measurable result of this analysis.
Use technology and information resources to research     issues in project risk management
Write clearly and concisely about project rik     management using proper writing mechanics.
  BUS 519 Assignment 4: Project Progress ( EQI in SIWA )
 Due Week 9 and worth 200 points
 Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.
The top-two (2) threats have occurred.
The top opportunity has been realized.
The project’s risk budget is already exhausted.
The risk management schedule has been shortened by two     (2) months.
Write a five to seven (5-7) page paper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and     explain why.
Determine if budget / schedule changes are necessary     and explain why.
Update the risk register and highlight the changes     made. Provide the justification for the changes.
Use at least four (4) quality resources in this     assignment. Note: Wikipedia and similar Websites do not qualify as     quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font     (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the     assignment, the student’s name, the professor’s name, the course     title, and the date. The cover page and the reference page are not     included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Given an information requirement related to project     risk management, determine the nature and extent of information needed to     effectively address the topic; efficiently locate, determine the validity,     and critically evaluate the resources; and apply the information to     accomplish the specific purpose (report, case analysis, factual     requirement, problem solving, and planning).
Use technology and information resources to research     issues in project risk management.
Write clearly and concisely about project risk     management using proper writing mechanics.