A Complete Guide to Mivan Shuttering Components
In today’s fast-paced construction industry, time, efficiency, and structural precision are everything. Among the many technologies revolutionising building methods, Mivan shuttering stands out as a game changer. Known for its speed, strength, and superior finish, Mivan technology uses a monolithic concrete pouring system with reusable aluminium formwork components—making it ideal for mass housing and high-rise structures.
At BSL Scaffolding, we’ve helped hundreds of developers and contractors improve project timelines and quality through premium-grade aluminium formwork systems. One of the most common questions we’re asked is: What are the components of Mivan shuttering?
This blog provides a detailed explanation of all the key Mivan shuttering components, their functions, and how they come together to create fast, cost-effective, and structurally sound buildings.
What Is Mivan Shuttering?
Mivan shuttering is a construction system developed by a European company called Mivan Company Ltd, designed for rapid cast-in-place construction using aluminium formwork. It uses a modular aluminium framework to form the structural elements of a building—such as walls, slabs, beams, staircases, and columns—all poured in a single cycle.
This technique eliminates the need for traditional brickwork or blockwork, ensuring uniformity, speed, and strength across the project.
The success of this system heavily depends on the precision and quality of its components.
Core Mivan Shuttering Components
Let’s break down the major components of a Mivan shuttering system. Each part is manufactured from lightweight yet durable aluminium, making it reusable, easy to handle, and capable of withstanding multiple construction cycles.
1. Wall Panels Wall panels are vertical aluminium plates used to form the external and internal walls of the building. They are precisely engineered to match the wall dimensions of the floor plan.
Function: To form the vertical concrete surfaces (walls), ensuring straightness and alignment.
BSL Advantage: At BSL Scaffolding, our aluminium wall panels are manufactured with tight tolerances and reinforced edges to ensure dimensional stability and long-term reusability.
2. Beam Side and Soffit Panels These are horizontal shuttering components that form the sides (beam side panels) and underside (soffit panels) of the structural beams.
Function: They help in shaping the beams precisely, ensuring uniform dimensions and clean finish for structural integrity.
Secondary Keyword Target: beam shuttering with aluminium formwork
3. Deck Panels Deck panels are flat plates that form the horizontal surface of the floor slab. They are supported by props and deck beams to maintain correct elevation.
Function: To support the weight of wet concrete for slabs until it sets completely.
Why It Matters: Uniform deck panels from BSL ensure no slab leakage or undulations—critical for residential and commercial projects.
4. Deck Beams These are horizontal members that support the deck panels and transfer their load to the vertical supports (props).
Function: They provide intermediate support to deck panels, enhancing formwork stability during pouring.
Pro Tip: Proper alignment of deck beams ensures flat slab finishes and avoids deviations during multiple floor constructions.
5. Soffit Length and Prop Head Soffit Length: Connects the wall panel to the deck panel horizontally and provides form for the slab's edge.
Prop Head: Holds the beam and deck system in place from below with vertical support props.
Function: To balance and lock the framework from below, supporting the system during concrete curing.
BSL's Offering: Our prop systems are high-strength yet easy to adjust on site, reducing labour and setup time.
6. Pins and Wedges These are mechanical fasteners used to lock different formwork panels together. Their design allows easy assembly and disassembly.
Function: To hold panels rigidly in position, ensuring leak-proof concrete casting and exact alignment.
Relevance: Reliable locking is essential for a monolithic structure; BSL’s pins and wedges are precision-engineered for seamless operations.
7. External Corners and Internal Corners These components help in joining panels at the junctions—where walls meet at 90° angles or where slabs meet walls.
Function: To complete corners and edges with proper geometry, reducing joint lines and plastering needs.
Construction Tip:
Tight-fitting corners lead to better waterproofing and finish, reducing maintenance in the long term.
Why Are These Components Critical?
Each of the Mivan shuttering components plays a specific role. The performance of the entire aluminium formwork system depends on the precision, durability, and alignment of every part. Using poor-quality components can result in:
Concrete leakage
Misaligned structures
Poor finishes
Delays in reuse and dismantling
At BSL Scaffolding, we focus on delivering formwork systems built to last. Every component is tested for load capacity, corrosion resistance, and alignment to ensure top-notch construction performance.
Benefits of Using BSL Aluminium Formwork Systems
Faster Construction: Our systems cut down cycle time per floor dramatically
Superior Finish: Clean, straight walls and slabs mean less plastering or rework
Durability: Up to 200+ reuses without compromising performance
Lightweight & Labour-Friendly: Easy handling with less skilled labour
Custom Design Support: Tailored formwork plans for your exact project specs
Whether you are building mass housing, townships, or luxury high-rises, our Mivan formwork solutions scale with your needs.
Build Smarter with the Right Mivan Shuttering Components
Understanding the components of Mivan shuttering is essential for any builder or developer aiming for efficiency, strength, and long-term cost savings. As India pushes towards rapid urban housing and vertical growth, choosing the right formwork partner becomes even more crucial.
At BSL Scaffolding, we don’t just supply aluminium formwork—we deliver complete construction solutions that support your vision from foundation to finish.
Whether you’re switching from traditional methods or scaling up Mivan-based projects, we’re here to help you build faster, smarter, and stronger.
#mivan shuttering system#mivan technology#modern construction technique#aluminium formwork system#Components of Mivan Shuttering
0 notes
Text
Mivan Shuttering: Revolutionizing the Indian Construction Industry
The construction industry is rapidly evolving, and one technology that has transformed modern building practices is Mivan Shuttering. With increasing demand for faster, more efficient, and durable construction, this innovative formwork system has become a game-changer, especially in high-rise residential and commercial projects.
What is Mivan Shuttering?
Mivan Shuttering is an aluminum formwork system originally developed by a European company named Mivan Company Ltd. It is now widely used across Asia, including India, for constructing reinforced concrete structures with high precision and speed. The system includes wall panels, deck panels, inner and outer corners, soffit corners, beams, and other components that can be assembled and disassembled with ease.
Unlike traditional wooden or steel shuttering, Mivan offers uniformity in construction, smooth finishes, and a significant reduction in project timelines.
🔗 Learn more about how Mivan shuttering works: Mivan Shuttering
Why Mivan Shuttering is in High Demand
Speed of Construction: The use of prefabricated aluminum panels allows for faster slab cycles — sometimes as quick as 7–10 days per floor.
Precision and Quality: Offers high-quality concrete finishes with minimal plastering required.
Durability: The aluminum panels can be reused up to 200 times, making them a cost-effective solution in the long run.
Less Labor Intensive: It requires fewer skilled workers and results in cleaner, safer construction sites.
Earthquake Resistance: The monolithic structure created using Mivan is known for superior structural integrity.
Applications of Mivan Formwork
Mivan shuttering is primarily used in:
High-rise residential apartments
Mass housing projects
Commercial buildings
Infrastructure projects like metro stations and airports
Final Thoughts
The Indian real estate sector, driven by government initiatives like Housing for All, is moving rapidly toward adopting Mivan Shuttering. As demand grows for smarter, faster, and more sustainable building methods, aluminium formwork systems like Mivan are poised to become the industry standard.
0 notes
Text
40,000 Salary - L & T Fresher Job Openings in Chennai

L & T Fresher Job Openings in Chennai - B.E, B.Tech Engineers
L &T Fresher Job Vacancy In Chennai with High Salary - 40,000 Per Month | All Over India Candidates can Apply Directly. Company Name: L & T Company Website: https://www.lntecc.com/ About Company : L&T Construction is a division of Larsen & Toubro (L&T) a major Indian technology, engineering, construction, manufacturing and financial services conglomerate, with global operations. Customers in over 30 countries around the world. L&T is engaged in core high-impact sectors of the economy.

Related Jobs : - TATA Electronics Walk-in-Interview - Foxconn Company Off-Campus Drive - Motherson Automotive Technology Limited Walk-In Interview - Maraimalai Nagar Area Walk-In Interview - Hiring for Freshers Infosys Internship 2023 Royal Enfield Walk-In Interview | Fresher Candidates can attend the interview directly Apply link: https://myemploymentjobs.com/royal-enfield-walk-in-interview-fresher-candidates-can-attend-the-interview-directly/ HCL Off Campus Drive 2023 | Madurai Location Apply link:https://myemploymentjobs.com/hcl-of Our Latest YOUTUBE Videos Link : https://www.youtube.com/channel/UCZYt-jtPk975fMuI6tLpUEg Our Telegram Channel Link: https://t.me/employmentjobs Latest Jobs By : Chennai JobsClick HereCoimbatore JobsClick HereBangalore JobsClick HereHyderabad JobsClick HereAndra Pradesh JobsClick HereSalem JobsClick HereMadurai JobsClick HereTrichy JobsClick HerePondicherry JobsClick HereAcross India JobsClick HereOther Cities JobsClick HereL & T Fresher Job Designation: Senior Engineer- Chennai Educational Qualifications ( L & T Fresher Job ): B.E, B.Tech Engineers - Mechanical & Civil Engineers Role: Permanent Year of Experience: Fresher & Min Experience Job Location: Chennai, Tamilnadu Salary Details: As per the Company Standard

Mechanical JobsClick HereELE / ECE JobsClick HereCivil JobsClick HereIT / Software JobsClick HereBPO / Call Centre JobsClick HereH/W & Networking JobsClick HereHuman Resource Jobs Click HereAcc/Fins JobsClick HereArts & Science JobsClick HereL & T Fresher Job Job Description : Mivan Shuttering Checking: Ensuring Precision and Perfection When it comes to achieving impeccable results in construction, Mivan shuttering checking plays a pivotal role. This process involves meticulously inspecting the alignment, levelness, and verticality of the shuttering framework. By utilizing advanced tools and techniques, such as laser levels and plumb bobs, construction professionals can ensure that the framework is in line with the desired specifications. This attention to detail guarantees the structural integrity of the final output, reducing the risk of deviations and inaccuracies. Waterproofing Execution: Shielding Your Structures from Moisture Effective waterproofing is a crucial aspect of any construction project. By executing waterproofing measures with precision, you can protect your structures from water damage, dampness, and other related issues. From basement walls to roofs, proper waterproofing ensures longevity and durability. It involves the application of specialized membranes, coatings, sealants, and drainage systems to create a barrier against water infiltration. By incorporating waterproofing execution into your construction plans, you safeguard your investment and enhance the lifespan of your buildings. Coordinating with MEP Activities: Seamlessly Integrating Mechanical, Electrical, and Plumbing Systems The smooth functioning of a building relies heavily on the integration of mechanical, electrical, and plumbing (MEP) systems. To achieve optimal results, it is essential to coordinate and synchronize the installation and execution of these vital components. By closely collaborating with MEP specialists, you can ensure that all systems are installed in the correct locations, without conflicts or hindrances. This coordination guarantees the proper functioning of HVAC systems, electrical circuits, plumbing networks, and other essential utilities, resulting in a well-designed and efficient building. Billing Certification: Verifying Vendor Performance In the complex web of construction projects, accurate billing certification plays a crucial role in maintaining transparency and accountability. By thoroughly assessing vendor invoices, you can ensure that all payments are justified and aligned with the work delivered. Certification involves verifying the scope of work, quantities, rates, and compliance with contractual obligations. This meticulous scrutiny minimizes financial discrepancies and strengthens vendor relationships, fostering a mutually beneficial environment for all parties involved. WO Amendment: Adapting to Changing Project Needs Construction projects often undergo changes and modifications along the way. To accommodate these alterations, a well-defined work order (WO) amendment process is essential. By promptly updating work orders to reflect the revised scope, timelines, and specifications, you can maintain project continuity and avoid confusion among stakeholders. Effective WO amendment procedures encompass thorough documentation, internal and external communication, and appropriate adjustments to project plans. This adaptability ensures that your construction projects stay on track and meet the evolving needs of your clients. Material Selection: The Building Blocks of Excellence Choosing the right materials is a cornerstone of successful construction projects. Optimal material selection involves considering various factors, such as durability, sustainability, cost-effectiveness, and aesthetic appeal. By carefully evaluating these aspects, you can ensure that your structures meet the highest standards of quality and performance. Whether it's selecting eco-friendly building materials or utilizing innovative technologies, making informed choices in material selection sets the stage for exceptional results. How to Apply for this Job ( L & T Fresher Job )? Details & Apply link (L & T Fresher Job ) : Click Here for L & T Fresher Job Production Planning Engineer Job Openings in TVS Company | B.E.Mechanical / Automobile | Hosur – Tamilnadu Designation: Production Planning Engineer Educational Qualifications: B.E. in Mechanical & Automobile Role: Permanent Year of Experience: Min Experience Job Location: Hosur – Tamilnadu APPLY LINK - https://myemploymentjobs.com/production-planning-engineer-job-openings-in-tvs-company-b-e-mechanical-automobile-hosur-tamilnadu/ Mahindra Company Hiring Fresher Graduate Apprentice Trainee Candidates Chennai | B.E.Mechanical & Automobile Designation: Graduate Apprentice Trainee Educational Qualifications: B.E.Mechanical & Automobile Role: Permanent Year of Experience: Fresh Graduates Job Location: Chennai TN Salary Details: As per the Company Standard Apply link: https://myemploymentjobs.com/mahindra-company-hiring-fresher-graduate-apprentice-trainee-candidates-chennai/ For more Job info, subscribe to our website & and check our website daily. Join Our Youtube ChannelClick HereJoin Our Telegram ChannelClick HereOur Linkedin PageClick HereOur Quora PageClick Here Read the full article
#L&TFresherJobOpenings2023#L&TFresherJobOpeningschennai#L&TFresherJobOpeningsinterviewquestionsandanswers?#L&TFresherJobOpeningswithhighsalary
0 notes
Text
Things you should know about Mivan Construction technology
Did you know that Mivan Aluminium shuttering software training can leave behind conventional ways of construction? Most of the real estate developers and Indian homebuyers might shy away from Mivan technology, but if issues such as project delays and a lack of proficient workforce should be addressed, it is time the Indian real estate sector tries its hand at Mivan construction.
You should definitely know this. Mivan shuttering is a fast-paced construction provides durability and strength to a building by use of aluminum formworks. Mivan Aluminium shuttering software training is promoted for its ability to help mass communication activity has blown up since the beginning of the pandemic, as housing demand has grown. The cost of the Mivan shuttering rate ranges depends and varies on the repletion of formwork; more repetition lessens the cost per square meter.

Mivan is a quality aluminum structure developed by the European construction company called Mivan Company LTD. In the year 1990, the company from Malaysia started manufacturing these formwork systems. This creative type of work is suitable for constructing houses in huge quantities at a faster speed. The speed of construction should be given more importance, specifically for large township or housing projects.
A type of aluminum formwork, Alluminium shuttering panel drafting Software has travelled across the world and proved to be an inexpensive substitute to the conventional technique of construction, which is time consuming and labor intensive. Mivan Construction is affordable speaking of a large construction. The use of bricks is completely eradicated and all the components that is staircases, slabs, walls, beams etc is made of concrete. Just like the way modular kitchens have replaced the conventional ones ensuring better space effectiveness, aesthetic appeal and time saving, Mivan formwork has assisted the real estate sector with simple assembling and faster construction.
0 notes
Link
#Wooden H – Beams in Hyderabad#Wood H Beams Manufacturer#Laminated Veneer Lumber Wood Battens#Wooden H Beams#Wood H Beams Supplier#Film Faced Plywood#Lumber wood batten manufacturer#Plywood Formwork Panels Manufacturer#Mivan Pin manufacturer#Formwork Pin Supplier
0 notes
Text
Complete Guide for Using Aluminium Concrete Shuttering
It is only essential to start the write up by mentioning that the initial aluminium formwork system could be traced back to the early ’90s where the Malaysian Company Mivan introduced their first concept. They are still a major force in today’s market for aluminium formwork manufacturers. This is why many often call the system Mivan Shuttering as well.
If you are a first-timer, you must realise that the aluminium formwork system essentially allows you to cast entire slabs and columns all at once- thereby making the whole unit a composite structure.
Difference between Formwork and Shuttering
Factually speaking, both formwork and shuttering are typical vernacular in the concrete construction industry. Moreover, the terms are most commonly interspersed during use. When it comes to formworks, it could be defined as an umbrella term for the forming process. On the other side, aluminium shuttering refers to the short-term moulds used to hold wet concrete before their set.
Aluminium Formwork System Definition
The Aluminium Formwork System can be best defined in a layman’s language as a construction system that allows the cast-in-situ concrete formation of a structure. Furthermore, you can also use the framework for scheduling and controlling other construction work- such as steel reinforcement, electrical and mechanical conduits, and concrete placement.
Furthermore, you must realise that developing load-bearing walls is ideal with Aluminium Formwork. In contrast, conventional formworks like wooden shuttering typically contain wooden components- they are less likely to hold up against the pressure from fresh concrete.
If you are beginning with Aluminium Formwork, you must realise that the system is an up-and-coming technology that promises a quick and straightforward way for cost-efficient and flexible concrete shuttering. Moreover, the process also produces quality output while putting greater focus on durability as a primary consideration.
An Innovative Approach
As mentioned already, the Aluminium Formwork is the latest and innovative technology that delivers a detailed construction quality improvement while trimming down on time and costs. It’s noteworthy mentioning that aluminium formwork for load-bearing constructs typically contribute to an increase of 8% in functional floor area and saving an average of 15% in construction costs.
A deep dive into the system will essentially help you understand the true potential of the system. Aluminium concrete shuttering has the necessary traits and attributes to design and develop any building component- such as stairs, beams, windows, columns, horizontal floors, and floating plates. This is surprisingly unique since all building components — such as walls, slabs, columns, balconies, and window hoods — are possible for development from concrete without requiring masonry.
In return, the process only contributes to improving the overall endurance and strength of the structure. Furthermore, the process also contributes to the system for developing a finish, meaning a skim coat can be directly applied to a wall. The overall finish from the development essentially eliminates the time and cost needed for using both external and internal plasters if needed at all.
Classifications
Now that you have learned it all about Aluminium Formwork, it is only appropriate to discuss the many classifications of the system to make a detailed understanding of the subject before beginning. As per the experts, there are two classifications for Aluminium Formwork: horizontal and vertical formwork.
The Horizontal formwork systems are typically considered for developing form horizontal concrete elements such as roofing or slab. On the other hand, the vertical formwork systems are more synonymous with developing vertical support for the structure. This may include core walls, shear walls, and columns.
Benefits of Aluminium Formwork
One can hardly deny the fact that the world is experiencing rapid urbanisation. This directly contributes to snowballing the demand for structures- something that conventional construction methods fail to cater to. Furthermore, it is only essential to mention that traditional formwork systems, such as wooden shuttering, typically tend to be a slow process.
Aluminium concrete shuttering always cuts since it allows the Construction firms to choose a procedure where the construction quality and pace is controllable. This process is perfect and highly fitting for developing commercial buildings, multi-story buildings, and creating multiple houses. Moreover, its tenacity contributes to consistency in cutting costs, timeliness and quality, without cutting corners.
Final Thoughts
More and more construction firms are choosing Aluminium formwork over other alternatives. The process comes as designed, pre-built, and manufactured inside the factory. If you want to learn more about the process, you may choose to bring in an expert for professional guidance. This is where the good folks from Nova Formworks could help you. For information, you can explore their website or other blogs.
0 notes
Photo

🚧MIVAN SHUTTERING DRAWING🚧 . 👉Link in bio . Follow @dnd_construction_ . 🔴How to read Drawing for installation of formwork on site? Complete Details ♦️ MIVAN PLAN DRAWING ♦️ MIVAN ELEVATION WALL D ♦️ MIVAN COMPONENT PARTS DRAWING Watch now 🚧Like! 🚧Share! 🚧Comment! https://www.instagram.com/p/CGmGqRfJ2Z2/?igshid=5eycfhuc0vvk
0 notes
Text
Aluminum formwork system
The aluminum formwork system is a construction system for molding the concrete structure of a building. It is also a system for programming and controlling the work of other construction trades, such as steel reinforcement, concrete placement, and mechanical and electrical conduits.
The system is fast, simple, adaptable and very profitable. It is unique because it forms all the concrete in a building, including walls, slabs, columns, beams, stairs, windows, balconies, and various decorative elements, in accordance exactly with the design of the architects. The dimensional accuracy of the concrete work also results in a consistent fit of doors and windows. The smooth finish of the concrete eliminates the need for expensive plaster.
The aluminum formwork system provides aluminum formwork for RCC or RCC multi-story load bearing buildings and allows the walls and slabs to be poured in the same operation. This increases efficiency and also produces an extraordinarily strong structure with an excellent concrete finish. Due to the fine tolerance achieved in the mechanized metal formwork components, consistent concrete shapes and finishes are obtained floor after floor. This allows electrical and plumbing fixtures to be prefabricated with the secure knowledge that there will be an exact fit when assembling them.
Technocraft Industries India Ltd. Offers the most up to date sustainable solutions in the scaffolding industry. Contact Now for more details.
FORMS OF ALUMINUM MIVAN:
Mivan is an aluminum formwork that is also known as MIVAN Shuttering. This type of formwork is developed for the first time by a European construction company. In 1990, Mivan Company Ltd. of Malaysia began manufacturing these formwork systems. Today, more than 30,000 m2 of Mivan Co. Ltd. formwork are used throughout the world. The MIVAN formwork has proven to be economical and satisfactory for the general construction environment.
Mivan technology is mainly suitable for building a large number of houses in a short period of time, using room-size shapes to build walls and slabs in a continuous pour on concrete.
Aluminum formwork is very profitable for repetitive building designs and for works on the base. This system is very unique, since all the components of a building, including slabs, beams, walls, columns, stairs, balconies and special bells for windows are made of concrete and there is no need for block or brickwork.
Parts of the MIVAN formwork: -
It consists of four components: beam components, roof components, and wall components, all made of high strength aluminum alloy. The modular nature of the Mivan aluminum formwork system allows easy assembly and disassembly of the formwork. The construction can proceed quickly with very little deviation in the dimensional tolerances. This system is quite flexible and can be easily adapted for any variation in design.
MIVAN formwork construction procedure:
The MIVAN formwork construction procedure is similar to the traditional type of formwork. The following processes are involved in the MIVAN construction:
1. Steel reinforcement wall configuration:
In this step, the reinforcing steel of the wall is used to form the structure of the building. This reinforcing steel supports the concrete until it reaches 50% of the designed resistance. This steel mesh is prefabricated in the factory and can easily be erected at the construction site.
2. Formwork placement:
As mentioned, the MIVAN formwork is ready to use, the formwork is designed and manufactured in the factory according to the required sizes of slabs, columns, beams, stairs and other structural elements of the buildings. For the formwork of the system of pins and wedges is easily mounted on site. The formwork can be easily removed from the structure once the work is done.
3. Pour the concrete:
Once the formwork is placed, the fresh concrete is poured into the formwork to form the shape. Once the concrete gains strength, the formwork of the structure is dismantled.
Simplicity: a system of pins and wedges in aluminum formwork MIVAN:
The beams are held in place by a simple pin and wedge system that passes through the holes in the outer rib of each panel. The panels are adjusted in a precise, simple and safe way and do not require clamps.
#MIVAN formwork#Mivan shuttering#aluminium formwork#aluminum panels#Aluminum formwork system#technocraft industries india ltd
0 notes
Link
via Today Bharat Can you believe that there is mind boggling over 50000 crores corruption is planned in AP through 10 Lakh NTR houses planned and being executed under PMAY- AH program? Is it the gift CBN Government is giving to Late NTR during the release of his biopic? How will NTR family take it? The details are as under: 10 Lakh houses with 265,365,465 sft sizes are planned. Let us take average size of each house is about 400 sft and total SFT proposed for construction is 40 crores. Excluding external infrastructure the contract is awarded to big players with tag size of minimum 10000 units @ Rs. 2700/sft inclusive of taxes. In TG state with 1000 unit tag size they awarded in the range of rs.1350 ndash; 1450/sft inclusive of taxes (in AP there is escalation clause for cement, not in TG) The total contract value for 10 lakh houses in AP is coming to Rs.1.08 Lakh Crores. For external infrastructure GOI urban development schemes like Amrut etc. funds are used and it comes to Rs.400/sft. For entire project is comes to Rs.16, 000 crores. Government lands are used for this program. With average 250 houses / acre of land , about 4000 acres land is given to the program and with 5 Cr/Acre as rate the land component is Rs.20, 000 crores. The total project is costing around Rs. 1.44 Lakh crores. Do not think extra ordinary specifications are being used as the rate is Rs. 2700/sft. They are normal specs and in the name of sheer wall technology and by avoiding competition major loot is planned. In fact the shuttering used for temporary secretariat constructed with another inflated figure of over Rs.10, 000/sft is used in these projects, and hence it is almost free for contractor as he already booked double the cost in secretariat building. If the same project is sourced through private builders with same specs and even better quality norms on an average they will offer ready to occupy flat for Rs 2800/sft , hence the total out lay comes to 1,12,000 crores, which include decent contractor margin plus all other hidden costs . Where is the difference between 1, 44,000 Crores estimated cost minus 1, 12,000 crores if implemented in decentralized approach which comes to Rs.32, 000 crores plus savings in land bank of Rs20, 000 crores in total Rs,52,000 crores going? Why still people are still interested? There is straight subsidy component of Rs. 3 lakhs /house coming to Rs.750/- per sft. Not factoring in land cost and infra cost houses are offered and beneficiaries also are of the opinion that they need not pay bank instalments.nbsp; By not showing the land cost and infra costs met through urban infra programs into projects, these are passed on to contractors accounts and probably taken back. nbsp;nbsp; Is it the way to express gratitude and tributes to NTR by looting the public money using his name as sentiment? Balakrishna Garu are you really sincere to your father? Can you show all these in biopic -2 openly and pay real tributes to your father? nbsp; Issues related to EWS house project (urban housing for poor) AP Government is taking up 1, 20,826 houses in 37 municipalities for the weaker sections of the society amp; named it as economically weaker section (EWS) housing program. Another 5000 plus houses are added in capital region. This program is part of GOI initiative - Housing for all (HFA) , covered under Prime minister Awas nbsp;Yojananbsp; Affordable housing programme ndash; PMAY-AHP. The program has inbuilt subsidy component of Rs.1.5 Lakhs from GOI amp; matching 1.5 Lakhs matching grant from respective state governments. nbsp;The balance will be beneficiary component amp; bank loan which shall be paid in instalments to bank. A group of ministers (GOM) under the chairmanship of Sri. Yenamala Ramakrishnudu, Finance minister was formed to look at ldquo;Urban development policy reformsrdquo; . They identified AP Township amp; infrastructure Development Corporation (APTIDCO) as nodal agency for construction in urban areas. The Government stated intention is to follow best practices such as technology, cost effectiveness, IT enabled designs amp; services. The officials were asked to visit 29 states to understand policies, guidelines, expenditure involved, standards followed. With all these experiences sum-up, our state made estimates which are highest and creating doubts about their ability or clearly established mollified intentions.nbsp;nbsp; Apartments in three ranges 300 sft, 365 sft amp; 430 sft are being planned. Initially it was decided to go for G+ 3 model, later decided to for G+3, G+5, G+9. Monolithic structure with prefabricated slabs amp; shear wall technology is taken as unique selling concept instead of going for regular concrete amp; brick wall technology. By projecting this technology as unique concept (which is not), AP state is trying to increase sft rate by 40% than the conventional method. In fact technology is not new and many local builders also invested in mivan shuttering amp; shear wall technology and as the technology is already in existence for over 12 years, the initial investment costs have come down drastically and in fact all the companies have carry forward inventoriesnbsp; which shall be used economically. Instead this is projected as big thing and concrete rates including shuttering is estimated around Rs.20000/cum which is very much on higher side compare to conventional system. nbsp;In fact the technology should give advantage in time of completion other than quality. AP with this technology gave time frame as 15 months, whereas Telangana with conventional technology is planning to complete in 12 months. Though initially CM gave impression that local contractors will encouraged, later the package size is made minimum as 10,000 units to favour big players. Where as in Telangana it was limited to 1000 units amp; implementation is planned through local contractors and monitoring is given to local MLAS. As it was given to understand there was understanding to encourage Asoka builtcon, Pune for north coastal dists, East Godavari amp; Kurnool- Lamp;T, West Godavari amp; Nellore ndash; NCC, Krishna, Prakasam amp; Guntur ndash;SP.nbsp; With BJP MLA Vishnu Kumar Raju support amp; blessings Vijaynirman gave stiff fight to get through the elimination process and got North coastal dists by quoting -0.5% . Where as in all other dists all other companies quoted +5% excess uniformly and the contracts are being awarded. nbsp;nbsp;If there is no syndicate formation how this will happen?nbsp; In case of Krishna dist the tenders are cancelled as Vijaynirman amp; Mahalakshmi companies strongly objected for the selection process followed. Another indication of syndicate is single tender in many dists. AP estimates are Rs.1635/- sft as against Telangana estimate of Rs. 1298/- excluding taxes in both cases. AP awarded for 1720/sft as against 1300 to 1450/- in Telangana. In AP escalation for cement is allowed, as against fixed cement rate in TG. In case of Telangana the rate is inclusive of infrastructure and in AP infra is separately planned and overall costnbsp;nbsp; will be in the range of Rs.2400/sft . What do we expect from the Government which awarded Velgapudi secretariat buildings (6 lakh sft for 300 crs ndash;rs.5000/sft ndash;plug amp; play facility) and ended up spending about Rs.580 crores ( Rs.9700/sft- plug amp; play). The same contractors built 18 lakh sft with 700 crores similar quality or better quality building almost at same timenbsp; with plug amp; play concept for Rs.750 crores ( Rs. 4200/sft). Same contractors amp; same syndicate is being planned for this mega housing. We can imagine what is going to happen to the state. State initially planned secretariat with Rs.8000 crs outlay amp; now estimated cost overrun is Rs.1800 crores. It is reliably learnt that they are planning to divert funds from other program components like sanitation, infra etc from MA amp; UD department. In fact state is giving sand free amp; rates should come down drastically. While bringing in SSR rates, other state rates , technology etc in to picture they are trying to cover their motivates and nbsp;planning to get away. One will be surprised to see the specs being followed- cement flooring, Sal wood door frames, pvc door frames, flush doors, MS window grill, ordinary WC, Bib cocks, all at five star rates, these can happen only with this government. IF WE GIVE THIS POROGRAM WITH DECENT SPECS TO LOCAL BUILDERS THEY WILL COME FORWARD TO GIVE FLATS @ RS.1800 TO 2000/SFT INCLUSIVE OF ALL AND INCLUSIVE OF LAND COST . WHEREAS GOVT IS SPENDING ABOUT Rs.2700 to 3000/SFT INCLUDING TAXES AND IF LAND COST IS INCLUDED IT MAY GO BEYOND RS.3500/SFT. STILL PUBLIC MAY BUY THESE APARTMENTS TO ACCESS 3 LAKHS SUBSIDY COMPONENT. MANY MAY NOT REPAY LOAN AND PROTEST AS THEY FEEL CHEATED. ONE HAS TO UNDERSTAND THAT 3 LAKHS SUBSIDY /LAND GIVEN BY GOVT TO THE PROJECT ARE NOT FRE, THEY ARE OUR RESOURCES/PUBLIC RESOURCES. GOVERNMENT IS ACCOUNTABLE FOR THESE RESOURCES.nbsp; IS IT NOT BETTER OUTSOURCING THAN DOING IT ON OUR OWN? WHOM ARE THE PEOPLE GETTING BENIFITTED- CONTRACTORS, VESTED INTEREST GROPUS, NOT THE REAL BENEFICIRIES? MAJOR LOOSERS ARE PUBLIC, TAX PAYERS OF THIS NATION.
0 notes
Text

BSL Scaffolding Ltd – Leading Mivan Shuttering Manufacturer in India
BSL Scaffolding Ltd stands at the forefront of Mivan shuttering manufacturing in India, offering advanced aluminum formwork systems tailored for rapid and efficient construction. Their Mivan technology incorporates lightweight, durable, and reusable components such as wall panels, beam panels, deck panels, and soffit corners, ensuring precision and speed in building projects. Ideal for residential, commercial, and infrastructure developments, BSL's formwork solutions reduce construction time and costs while enhancing structural quality. With over 25 years of industry experience, BSL Scaffolding Ltd is committed to delivering sustainable and innovative construction solutions.
0 notes
Text
Mivan Shuttering: Merits And Demerits
If you are well-versed with the construction industry, you might have heard the term ‘Formwork’ being thrown around at all. For those of you who do not know, a formwork is essentially a temporary structure that gets used as a mould to hold the original structure in place. These are made of several different materials, each with its merits and demerits.
Why Is Mivan Formwork Gaining Immense Popularity?
One of the latest innovations in the construction industry is Mivan shuttering. This method is predominantly used for mass construction activities at a fast pace. This construction method offers durability and strength to any building using aluminium formworks.
A Brief History Of Mivan Formwork
Going back a few decades, a European company developed the Mivan Technology, better known as the aluminium formwork system. With a few years of practice, the Mivan Company Ltd began manufacturing such formworks, hence the name ‘Mivan Technology’.
Mertis Of Mivan Shuttering
To have a better understanding of Mivan shuttering, you need to understand its applications, advantages and disadvantages. Knowing this will not only help you learn which situations it suits the best but also if it is the perfect idea for your project. Further mentioned are some of the significant merits and demerits of Mivan shuttering.
● Speed Of Development:
This is perhaps the primary advantage of Mivan shuttering. When compared to other conventional formwork practices, Mivan Shuttering can reduce the amount of tie taken to build a project by almost half.
● Reduces Cost:
Mivan shuttering can indirectly reduce the cost of production as well. Firstly since it takes less time, the labour hired does not need to be paid for a long amount of time. On top of that, since it is a set procedure with simple steps, you will not need skilled and trained labour. So it omits the need to hire labour for activities like masonry and rendering, which can be quite a budget intensive investment.
● Makes More Durable Buildings:
Apart from the above-mentioned benefits, with Mivan shuttering, every building built is more seismic resistant and robust. This is mainly because there are fewer joints, and the building faces have reduced leakages, further omitting the need for regular maintenance.
● Uniformity In Building:
This is another advantage of Mivan Shuttering, often forgotten. The walls and slabs in such construction have a smoother finish, giving scope to a larger carpet area when compared to the traditional techniques of formwork.
Demerits:
Even though the advantages often overpower the demerits of Mivan Shuttering, there are quite a few of them. Since the components used in this type of construction are small, finishing lines can be easily visible. On top of that, these are not very flexible, which means that modifications are almost impossible to make on a finished product.
With this information, you can easily understand when and how Mivan shuttering can be used in your project. That said, ensure to have a discussion with your project heads before choosing any such method of formwork.
0 notes
Text
Efficient & Fast-Paced – Milan Formwork System
Have you heard of Mivan technology? Mivan is a superior aluminium structure designed by European-based Mivan Company Ltd. This special form of work is adapted for faster construction of housing projects done on a mega scale. The housing construction speed is crucial for megaprojects and to meet the time challenge, real estate specialists prefer the Mivan formwork system.
What is Mivan Formwork?
Mivan formwork is a superior formwork system that uses strong and dependable aluminium components for housing construction projects. Most of the new buildings in the city of Mumbai has been constructed using this advanced Mivan technology as it offers an economical solution for speedy construction.
This technology is being used all over the world, especially in Asian and Arab countries. You can develop a large number of residential houses in a short time-span, using this popular technology.
Mivan Erection Process
This technology is employed in construction sites wherein whole structural designs are made of concrete. Forms are cast and top-quality concrete mixture is poured on them. This allows workers to access the formwork after twelve hours of structural concreting.
Some construction experts use Mivan shuttering process, which is also a speedy construction technique that provides tough strength and long-lasting durability to a structure with the help of high-performance aluminium formworks. It is touted as one of the best mechanics for its express capability to aid in large-scale housing project mass-construction activities.
Enhanced Features of Mivan System:
● Load-Bearing – The lightweight formwork is equipped with super load-carrying capacity. It can carry around 7 to 8 tonnes (per sq. Mt.)
● Striking Time – The technology offers good striking time, twelve hours after concreting for vertical formwork and thirty-six hours after concreting for horizontal formwork.
● Resilience – The structural grade metallic aluminium alloy panels are extremely durable and strong. Every component can be reused about 200 times.
● Speedy completion – You can achieve high-speed performance in the construction of houses. The system helps to complete the housing project quickly. Casting of the floor is done within 7 days using first-rate Milan technology formwork.
Comparison with Conventional Formwork
When pitted against normal formwork, Milan formwork gives faster results as the walls and floors are constructed in one smooth operation as they are cast together. The forms are reusable on regular basis.
Similar to the Mivan formwork is the Nova formwork system that is perfectly tailored for the Indian real estate scenario. Nova formwork is a reputed Indian company dedicated to developing superior shuttering systems. It provides the best-quality plastic formwork systems at reduced price rates.