Master Gantt Charts with Celoxis: A Step-by-Step Beginner’s Guide

In the world of project management, Gantt charts are one of the most powerful tools for organizing tasks, tracking progress, and meeting deadlines. Whether you're managing a large enterprise initiative or a small internal project, a project Gantt chart can bring clarity and structure to even the most complex workflows. In this blog, we’ll walk you through what a Gantt chart is, how it works, and how Celoxis makes it easy to master Gantt chart project management.
What is a Gantt Chart?
A Gantt chart is a visual timeline that shows the start and end dates of tasks within a project. It provides a horizontal bar graph format where each task is represented by a bar stretching from its start date to its finish date. This allows project managers to see task dependencies, progress, and overlaps at a glance.
Key Components of a Gantt Chart in Project Management
Task List – Breaks down your project into individual actionable items
Timelines – Assigns realistic start and end dates
Milestones – Highlights major project checkpoints
Dependencies – Shows how tasks are interrelated
Resources – Allocates people, tools, and budgets to each task
Progress Indicators – Tracks completion percentage in real-time
How Does a Gantt Chart Work?
Gantt charts in project management operate by aligning your tasks on a timeline. As work progresses, task bars update visually—providing immediate insight into what’s on track and what’s delayed. Tools like Celoxis offer drag-and-drop scheduling, real-time collaboration, and smart alerts to ensure your plan stays current.
Benefits of Using Gantt Charts in Project Management
Clear Scheduling: Keep every task and deadline visible
Improved Collaboration: Ensure team alignment through shared timelines
Better Resource Management: See who’s doing what and avoid overloading
Project Transparency: Track progress and update stakeholders easily
Risk Reduction: Identify bottlenecks early through visual analysis
Why Every Project Manager Should Master Gantt Charts
Managing multiple moving parts can be overwhelming. That’s where Gantt chart project management shines—it simplifies complexity. With Celoxis, you not only get a top-tier Gantt chart tool, but also integrated reporting, timesheets, resource management, and risk tracking.
Common Challenges Solved by Gantt Charts
Missed deadlines due to unclear planning
Lack of visibility into team workload
Poor coordination between teams
Scope creep without early warnings
How to Create a Gantt Chart: Step-by-Step
Define Project Goals
Break Tasks into Phases
Assign Start/End Dates
Link Dependencies
Assign Resources
Track and Adjust as Needed
Celoxis simplifies all these steps through an intuitive, interactive Gantt chart interface.
Tools to Create a Gantt Chart
Popular Gantt Chart Tools:
Celoxis – Powerful, scalable, and built for teams
Microsoft Project
Asana
Trello (via plugins)
Smartsheet
Free vs. Paid Gantt Chart Tools:
Free tools are good for beginners but often lack collaboration features
Paid tools like Celoxis offer enterprise-grade capabilities with robust support
How to Choose?
Look for tools with:
Real-time updates
Customization
Scalability
Integrations
Cost-effectiveness
Best Practices for Using Gantt Charts
Keep it clean – avoid unnecessary tasks
Use color coding for quick understanding
Update the chart frequently
Get team input before finalizing
Share it with all stakeholders
Common Mistakes to Avoid
Overcomplicating the chart
Setting unrealistic timelines
Not using dependencies correctly
Forgetting to involve the team
Ignoring regular updates
FAQs: Gantt Charts in Project Management
Q: Can Gantt charts be used for small projects? Absolutely. Even small tasks benefit from clear timelines.
Q: Gantt chart vs. Kanban board—what’s the difference? Gantt focuses on time; Kanban on workflow stages.
Q: How often should a Gantt chart be updated? Weekly, or anytime there’s a change.
Q: Is expensive software required? No. Celoxis offers affordable, all-in-one solutions.
Q: Can Gantt charts show critical paths? Yes. Celoxis highlights critical paths clearly.
Q: Is it compatible with agile? Yes. Celoxis combines agile boards with traditional Gantt views.
Q: What industries use Gantt charts? IT, construction, marketing, healthcare, logistics—and more.
Why Celoxis Is the Best Tool for Gantt Chart Project Management
Celoxis offers one of the most advanced Gantt chart software solutions in the industry. It enables interactive planning, tracks real-time progress, shows dependencies and critical paths, and integrates with your existing tools. Whether you’re a team of 10 or 1,000—Celoxis Gantt charts are built to scale with your project needs.
Final Thoughts
Understanding what is a Gantt chart and how to use it effectively is essential for modern project success. And with Celoxis, you get more than a chart—you get a full prgantt chart project management
oject management ecosystem built for results.
0 notes
Text
Top 10 Construction Project Management Softwares in 2025
Explore the top 10 construction project management softwares of 2025 to streamline tasks, improve safety, and cut costs.
Read the full blog
#construction project management software#Cost Management#Gantt charts#Orangescrum construction#resource management#task management
1 note
·
View note
Text
Unlocking Project Success with Microsoft Project Professional 2016
Transform Your Projects with the Timeless Strength of Microsoft Project 2016
In the dynamic world of project management, staying ahead requires tools that combine power, flexibility, and reliability. Microsoft Project Professional 2016 stands out as a cornerstone for project managers aiming to deliver excellence on every initiative. Its comprehensive features enable seamless planning, execution, and control of projects, ensuring that teams stay aligned and goals are achieved efficiently.
One of the most remarkable aspects of Microsoft Project 2016 is its intuitive interface that simplifies complex project workflows. With its robust Gantt charts, users can visualize timelines, dependencies, and milestones effortlessly, fostering clearer communication among team members. This visualization capability is vital for identifying potential bottlenecks early, allowing proactive adjustments that keep projects on track.
Resource management is another critical feature that elevates Microsoft Project 2016. The software provides detailed resource allocation tools that help project managers optimize personnel, equipment, and budget resources. By balancing workloads and avoiding over-commitments, teams can maintain productivity and morale throughout the project lifecycle.
Furthermore, the software's integration capabilities ensure that it works seamlessly within the Microsoft Office ecosystem. Whether it's sharing documents via SharePoint or collaborating through Teams, Microsoft Project 2016 fosters a collaborative environment that drives project success. Its compatibility with various file formats also makes it adaptable to different organizational needs.
For organizations seeking a perpetual license, Microsoft Project Professional 2016 offers a reliable, long-term solution. This means you can install and use the software indefinitely, avoiding recurring subscription costs while maintaining access to essential management tools. This stability is particularly valuable for enterprises that prefer predictable budgeting and control.
Adopting Microsoft Project 2016 empowers project managers to lead with confidence, leveraging a proven platform that has stood the test of time. Its features are designed to accommodate projects of all sizes, from simple initiatives to complex portfolios. By mastering this tool, professionals can enhance productivity, improve stakeholder communication, and deliver projects that surpass expectations.
Explore more about how Microsoft Project Professional 2016 can revolutionize your project management approach by visiting Masterful Project Management: The Enduring Power of Microsoft Project Professional 2016. Embrace the power of reliable, sophisticated project management and turn your visions into reality with confidence and clarity.
#Microsoft Project 2016#Project Management Software#Gantt Charts#Resource Planning#Timelines#MS Project Features#Perpetual License
0 notes
Text
Boost Your Project Efficiency with Gantt Charts
Managing projects without any structured plan is like walking in the dark. You keep moving on with your projects but staying aligned and on-course becomes a challenge. This is where Gantt charts can turn things around.
It provides a visual roadmap of all the tasks, deadlines and dependencies needed to progress which is essential in helping the team members to stay aligned and keep the projects running smoothly.
Gantt chart has been in use for over a century and today it remains as one of the most effective methods for modern project management.
Be it for managing a software development cycle or boosting a marketing campaign, a well-designed Gantt Chart will enhance project planning, streamline execution and also ensure timely delivery.
In this blog, we will explore what Gantt charts are and why they are crucial; we will also explore how you can leverage them for better project planning and execution.
Read the full blog
0 notes
Text
bout to plan my life as a gantt chart
0 notes
Link
How to Create a Gantt Chart in Excel
Managing projects efficiently is crucial. Whether you're organizing a personal project or handling a complex business task, staying on track is essential to ensure deadlines are met and resources are allocated correctly. One powerful tool that helps achieve this is a Gantt chart. A Gantt chart is a visual representation of a project schedule, showing individual tasks, their durations, and dependencies, all laid out along a timeline.
While specialized project management software like Microsoft Project or Asana may offer built-in Gantt chart features, not everyone has access to these tools. Fortunately, Microsoft Excel is widely available and can be easily used to create a Gantt chart, providing flexibility and a simple, cost-effective solution for project tracking.
This guide will take you through everything you need to know about creating a Gantt chart in Excel, from start to finish. By the end of this article, you’ll be able to build your own chart, customize it, and use it to keep your projects on schedule.
Why Use a Gantt Chart?
Gantt charts have become an essential tool for project managers worldwide. Here are some key reasons why they are invaluable:
Visualizing project timelines: A Gantt chart offers a clear visual timeline of tasks and milestones.
Tracking task progress: It helps you monitor how individual tasks are progressing, offering real-time updates on a project's health.
Resource management: By seeing the timeline of different tasks, you can allocate resources more effectively.
Dependency management: Gantt charts make it easier to spot dependencies, ensuring that one task is completed before another starts.
These benefits make Gantt charts a popular tool for both large-scale business projects and small, personal tasks.
How to Create a Gantt Chart in Excel
Creating a Gantt chart in Excel may seem challenging at first, but Excel's flexibility and robust features make it easier than it appears. Here’s how you can create your own Gantt chart step by step.
1. Set Up Your Excel Worksheet
Before jumping into the chart itself, you need to set up your Excel worksheet with relevant project data.
Steps:
Open Excel: Start by opening a new workbook in Excel.
Enter Your Task Data: In your spreadsheet, create the following columns:
Task Name: A list of tasks to be completed.
Start Date: The date when each task begins.
Duration: The number of days each task will take to complete.
Here’s an example of what your data might look like:
Task NameStart DateDuration (Days)
Task 101/11/20245
Task 203/11/20243
Task 306/11/20244
Task 409/11/20246
This data will serve as the foundation for your Gantt chart.
2. Create a Stacked Bar Chart
Now that you’ve entered your data, the next step is to transform it into a stacked bar chart. Excel doesn’t have a direct Gantt chart template, but a stacked bar chart works perfectly to achieve a similar effect.
Steps:
Highlight your Task Name, Start Date, and Duration data.
Click on the Insert tab on the ribbon and select Bar Chart from the Charts group.
From the dropdown, choose the Stacked Bar option.
At this point, you’ll see a basic stacked bar chart that includes both the start dates and durations. This will serve as the starting point for your Gantt chart.
3. Format the Chart to Look Like a Gantt Chart
Your next task is to format the stacked bar chart to resemble a Gantt chart.
Steps:
Remove the "Start Date" Bars: The bars representing the start dates are not necessary, so you’ll need to make them invisible.
Click on one of the bars representing the start dates (the bottom part of each stack).
Right-click and choose Format Data Series.
In the fill section, set No Fill to hide these bars.
Reverse the Task Order: By default, Excel arranges tasks from the bottom up. To have the tasks listed from top to bottom:
Click on the vertical axis (Task Name labels).
Right-click and choose Format Axis.
Check the box that says Categories in reverse order.
Now, your chart should resemble a Gantt chart, showing tasks as bars extending over time.
4. Add Dates to the Chart
To make the chart useful, you’ll need to add the dates across the top so you can see when tasks start and end.
Steps:
Right-click on the horizontal axis (representing time).
Select Format Axis.
Set the Minimum and Maximum bounds to match your project start and end dates.
You can also adjust the Major Unit to match the timeline of your project (e.g., 1 day, 1 week, etc.).
Now, you should have a clean, easy-to-read Gantt chart.
5. Customize the Gantt Chart for Better Visuals
While you’ve now created a basic Gantt chart, it’s essential to customize it to fit your project’s needs and improve its readability.
Customization Options:
Change Bar Colors: You can color-code tasks based on their category (e.g., development, testing, marketing). To change the color:
Add Milestones: Milestones are crucial points in your project. You can add them by adding a new row to your table with a duration of zero and formatting the corresponding bar differently.
Highlight Dependencies: If certain tasks depend on others, you can highlight this by adding annotations or changing the colors of dependent tasks.
Conditional Formatting: Excel's conditional formatting feature can help to visually indicate tasks that are running behind schedule.
Click on the task bars you want to change.
Right-click and select Format Data Series, then choose your preferred color.
Advanced Tips for Gantt Charts in Excel
While a simple Gantt chart can be highly effective, you might need more advanced functionality as your projects grow in complexity. Here are some additional tips for creating dynamic Gantt charts in Excel:
1. Use Conditional Formatting to Track Progress
Conditional formatting can help visually track task progress. For example, you can set a rule where tasks that are delayed turn red or tasks that are completed turn green.
Steps:
Select the cells you want to apply the rule to.
Go to the Home tab, select Conditional Formatting, and choose a rule type (e.g., less than, greater than).
Customize the format based on the condition (e.g., red for late, green for on-time).
0 notes
Text
Efficient Task Management: Tips for Balancing Multiple Projects
Balancing multiple projects can be challenging, but efficient task management helps keep you organized and productive. Start by prioritizing tasks across projects, focusing on deadlines and dependencies to determine what needs immediate attention. Break down larger tasks into manageable steps and create a visual schedule using tools like Gantt charts or Kanban boards to track progress across projects. Regularly assess workload capacity and adjust timelines or delegate tasks as needed to prevent burnout. Utilizing task management software, setting realistic deadlines, and maintaining open communication with team members can further support a balanced approach to managing multiple projects successfully.
More info: https://ahalts.com/products/hr-management

#task management tips#balancing multiple projects#efficient project management#prioritizing tasks#workload organization#task management tools#Gantt charts#Kanban boards#project scheduling#delegation strategies#productivity tips
0 notes
Text
10 Steps to Choose the Right Project Management Tool for Your Business

In today’s fast-paced business environment, efficient project management is key to achieving success. Selecting the right tool can greatly enhance your team’s productivity and effectiveness. This article presents ten essential steps to guide you in choosing the perfect project management tool to meet your business needs.
Identify Your Business Requirements:
Begin by clearly defining your business requirements. Understand the size of your projects, the number of team members, collaboration needs, and any specific features necessary for your workflow.
Consider User-Friendliness:
Opt for a project management tool that is intuitive and user-friendly. A tool that is easy to navigate and understand will ensure quicker adoption by your team.
Assess Collaboration Features:
Evaluate the collaboration features of the project management tool. Look for functionalities such as real-time collaboration, document sharing, and communication tools to enhance team interaction.
Scalability:
Choose a tool that can grow with your business. Ensure it is scalable to accommodate an increasing number of projects, users, and any evolving requirements.
Integration Capabilities:
Check for integration capabilities with other tools your team is already using, such as communication platforms, file-sharing services, or customer relationship management (CRM) systems.
Customization Options:
Every business has unique processes and workflows. Select a project management tool that offers customization options, allowing you to tailor the tool to your specific needs.
Cost and Value:
Consider your budget constraints and evaluate the value offered by each project management tool. Some tools may have a higher initial cost but provide better long-term value with advanced features and scalability.
Security Measures:
Security is paramount when managing projects, especially if sensitive information is involved. Ensure the project management tool adheres to industry-standard security protocols to protect your data.
Trial Period:
Take advantage of free trials or demo versions offered by project management tool providers. This allows you to assess the tool’s suitability and functionality within your business environment before making a commitment.
User Reviews and Recommendations:
Research user reviews and seek recommendations from industry peers. Understanding the experiences of other businesses can provide valuable insights into the practicality and effectiveness of a particular project management tool.
By focusing on customization, scalability, user-friendliness, and continuous support, Tecnolynx app development company aims to empower clients with tools that not only meet yourcurrent needs but also evolve alongside the business growth and changing requirements.
#Project management software#Project planning tools#Task management software#Team collaboration tools#Agile project management#Kanban boards#Gantt charts#Project scheduling software#Resource management tools#Project management tool comparison
0 notes
Text
Ep 230 | The Merry Writer Podcast
Today, on The Merry Writer Podcast, Rachel and I are talking about project management and sharing information about a method that might just help with that. We ask and answer: “How Can The Gantt Chart Help Your Writing Process?” Continue reading Ep 230 | The Merry Writer Podcast
#ari meghlen blog#Author Ari Meghlen#gantt Charts#Podcasts for writers#The Merry Writer Podcast#Using a gantt chart#Writers and gantt charts#Writers Podcast
1 note
·
View note
Text
Evolution of Project Management Tools: A Historical Journey
Explore the evolution of project management tools from handwritten notes to AI-driven platforms! Read our latest article for valuable insights and stay ahead in your career. Click to read the full article and subscribe for more updates!
#21stCentury#AIinprojectmanagement#collaborativeplatforms#digitalprojectmanagement#EmpoweredJourney#HafsaReasoner#historyofprojectmanagement#modernprojectmanagementsoftware#ProfessionalDevelopment#projectmanagement#projectmanagementtools#realtimeprojectdashboards#21st Century#AI in project management#collaborative platforms#Critical Path Method#digital project management#Empowered Journey#evolution of project management#Gantt charts#Hafsa Reasoner#history of project management#machine learning in project management#modern project management software#PERT diagrams#professional development#project management#project management tools#real-time project dashboards
0 notes
Note
Do you have any final theories/desires for Book 7 Part 12?
(slamming fists on table) I DEMAND MORE CHE'NYA
#art#twisted wonderland#twisted wonderland spoilers#twisted wonderland episode 7 spoilers#twisted wonderland book 7 spoilers#twisted wonderland episode 7 part 12 spoilers#twisted wonderland book 7 part 12 spoilers#to be fair i am always in a state of lowkey wanting more che'nya#let him crash cater's pizza party!!!!#i wanna see cater skateboard up that big ol' tower to slam some za with a neon purple cat#truly this is the most radical dream yet#golly. i do try not to speculate too much but the 3-part split has me VERY intrigued#like yeah it most likely is just because hearts has a lot of boys#so it's probably cater and one of adeuce -> trey and the other adeuce -> riddle#but i am curious what's gonna happen after riddle's dream. because we'll have the party all together#and we gotta segue back into malleus somehow...#man i was wondering if the subchaptering of the subchapters was a one-off or if it was gonna be a consistent thing from here on#i guess we're gonna be getting smaller but more frequent drops from now on?#i am into that (keep up the hype!) but i'm surprised that it'll be happening just...around other events#main story has become unstuck in time and is just floating around the schedule now#we're gonna be locked in battle with cater's subconscious while deuce is over there in a parallel timeline trying on crop tops#makes me wonder what's going on in that production schedule...#lemme see those gantt charts twst
1K notes
·
View notes
Text
THE FABULIST'S FIELD GUIDE TO FABLE.
Somehow I've managed to post almost one hundred thousand words on this blog in the form of writing pieces. Which is absolutely insane to me because I don't think I've managed to write one hundred thousand words of creative writing towards any single project in the rest of life up until this Tumblr blog. And maybe this type of celebration is a little premature but I have things planned and I will hit 100k. It's also the three year anniversary of this blog, and I want to celebrate that too.
This is a little recap of where we've been, where we are, and maybe where we're going. And by we, I mean me and the guys in my head. This is also a sort of guide to their writing pieces and the reading order because I did not write in chronological order.
WHERE WE'VE BEEN
There are four major, earth-shattering, life-changing events that happened to various Fable members that had repercussions to various people over various years. If you're interested in all the writing as a whole, I have a Google doc in posting order here and chronological order here, which splits up a lot of the pieces.
[ OO1 ] MINGEUN'S NATIONALITY SCANDAL
In order to debut, Mingeun made a deal with Taein, the company's CEO, to lie about his upbringing, and therefore his nationality. He was born in South Korea, but immigrated to Canada with his family when he was two. When it came to being a Fable member, Andrew already had the diaspora member position on lock. And the main vocal position, which led to Mingeun being cut from the debut lineup after Haksu joined at the last minute.
Jaeseop fought for Mingeun's inclusion and won, leading to Taein brokering the deal with Mingeun. Everything went swimmingly for the first two years, where Mingeun pretended he didn't understand a word of English, and never uttered a word about Canada. He uttered very few words in this time period and was always out of the spotlight.
In the summer of 2020, having hit their stride with their previous album a few months earlier, the lid on the entire operation was blown via Dispatch articles. Given that Fable was on the rise, both in Korea and internationally, it didn't take long for friends and classmates from his childhood to corroborate the news. Mingeun's hiatus was immediate, and it would be over a year before he returned to the group. In the months that followed, he gained a reputation for being a liar, and in turn, tainted Fable as "the group with the liar" for some time.
RELEVANT POSTS: One of the news articles that broke the news. Pre-redemption arc perception. A drabble. "Not Enough." "Live Wire."
[ OO2 ] HAKSU'S BLACKMAIL
Haksu was the last member to join Fable. In the most succinct way possible, he spent the last two months of 2017 stalking and harassing Taein until he was accepted as a trainee. This is because he very much believes in fate and he had a dream about him. In the least weird and creepy way possible. It's only what he did because of it that becomes weird and creepy. Armed with his knowledge and physical evidence of Taein's adultery, he used it as a bargaining chip to get his foot in the door.
At the end of 2017, the debut lineup was otherwise set and they would have debuted earlier, if not for Haksu's sudden inclusion. Jaeseop and Mingeun tried so hard to get him out of there, but he was surprisingly stubborn and resilient and optimistic. He's also the best singer in the group, which is why Mingeun was demoted to main dancer and then nearly kicked out.
After debuting, Haksu continued to use Taein's crimes against him to secure himself the position of center, along with every opportunity that came Fable's way for the first few years of their careers. This continued on until 2021, when Taein and his wife began divorce proceedings. Having lost his best bargaining chip, he had to start learning how to share the spotlight. The majority of Fable fans continue to consider him the undisputed center.
RELEVANT POSTS: "Great Things" part one and two. One part of "Form is Emptiness."
[ OO3 ] EUNSU'S DEPARTURE
Eunsu was Fable's main rapper for three years, until he left the group in August 2021. The official reason for his departure was given simply as "personal reasons." The real reason he left was the death of his older brother, Yonggeum, which left him as his parents' only child. His father runs the only Buddhist temple in the small town he grew up in, a position that was passed down through his family for generations. It was expected that Yonggeum would inherit their father's position. That gave Eunsu the freedom to do things like become a kpop idol. After his brother's death, he was compelled by a sense of duty to return home and learn his father's role.
Despite his departure, he continues to interact with the rest of the group to the point where it's like he never even left. He writes songs for them, features on some of them, appears on a bunch of their livestreams, and is still Mingeun's best friend.
RELEVANT POSTS: "Form is Emptiness" part one and part two.
[ OO4 ] 'THE PROBLEM WITH FABLE'
Ever since their debut, one of Fable's greatest assets and their biggest weakness has been their concept. After building their careers as a modern take on mostly Joseon-era culture, they're boxed into the same square. They hardly ever do anything different, and when they do, it pisses off half their fanbase. These problems and some more were the subject of a viral video essay by Lightspeed member Tyler, but before he joined a survival show and became an idol. You either die a hero or live long enough to become a villain. But I digress that has little to do with Fable.
Responses to this were split, with Mingeun and Jaeseop weighing in with their own opinions. They are a bit too decently established and also a boy group for this to really affect their reputations. It just sits in the back of Jaeseop's mind and bothers him every now and then.
RELEVANT POSTS: "the problem with fable" itself. Mingeun and Jaeseop's reactions.
There are a few smaller plotlines that focus more on individual members.
[ OO1 ] BYEONGHWI (AND GICHEOL)
Byeonghwi is the only character whose storyline is mostly romance-focused. I wanted at least one of them to have a smaller stakes plotline that wasn't lying about their entire identity or blackmailing their CEO. So I spun a wheel and it landed on him. Which works out well, because his idol origin story was always somehow passing an audition he went to with a friend.
Anyway, his plot is very linear and straightforward. He had a friend. He debuted first. He confessed and it went terribly. He no longer has a friend.
RELEVANT POSTS: "First Love." "Sea Change." "No Return."
[ OO2 ] ANDREW
Quick side note Andrew is the greatest thing that happened to Fable. He was not in the early drafts. It was just Mingeun against the world. A lot of things are better for them and also for me because he's in the picture.
As far as plotlines go, he's the diametric opposite of Mingeun. His story is also a lot more vibe-based. It's very much about his identity, and trying to find a place for himself, both as a Korean American returning to the so-called homeland, and as an artist in the kpop industry. I don't really know how to TL;DR this I think the TL;DR is his pieces.
RELEVANT POSTS: "Not Enough." "Double A-Side." "Piano Concerto in A♭ Minor" part one, part two, part three. A drabble.
WHERE WE ARE
After all of that happened, I am trying to pick up the threads and extend them years into the future. The easiest way to do this is probably by member.
KIYOUNG recently returned from his mandatory military service. Other than that he's big chilling. Not to be confused with bing chilling. He's adjusting to civilian life again. RELEVANT POSTS: "Piano Concerto in A♭ Minor part one"
ANDREW is being recruited by Taein's somewhat shady business partner and not-quite-chaebol-heir Jinguk, for reasons he still doesn't really know. He has been Fable's temporary leader for the past nine months, and will continue to be so for another year or so, while Jaeseop is enlisted. RELEVANT POSTS: The drabble again. And also his piece which is linked in three parts right above so I'm not doing that again.
JAESEOP enlisted in December. He will be there for some time. Before he went, he tried to prepare Andrew as his substitute. He considered it putting his affairs in order, like he was going to die. RELEVANT POSTS: The saddest announcement ever o7.
INTAK is technically the first Fable member to go solo, in a move absolutely no one could have predicted. He released a mixtape in August. He went to Japan with Byeonghwi and Mingeun and returned with an entire extra suitcase of anime merch. RELEVANT POSTS: The album. A news article.
HAKSU briefly went home in May and missed Fable's last tour date. He did not know that his parents set up a date for him. He also did not know that the date was with one of his sasaengs. It's bad for him right now. RELEVANT POSTS: Tour absence. "exploring haksu's sasaeng problem." "One-Way Mirror."
EUNSU might as well be in Fable with his appearance on Intak's album. He also hosted Mingeun back in November after he got into a fight with some of the other members for reasons I can no longer remember because it's been almost a year and I didn't write it down. RELEVANT POSTS: "Interlude: Birthright."
MINGEUN was given an ultimatum early in the year by Taein. It took him a while to get around to it, but he broke up with his girlfriend of almost four years in July. He's also been on house arrest for majority of the year. RELEVANT POSTS: "Live Wire." "Interlude: Chances." "A Night Out On Earth." An epilogue.
BYEONGHWI is doing things I have yet to post anything about. He's in a situationship with a fan. Nothing like Haksu's situation. There are no relevant posts because this is in my head. It's been going on since Fable's album in the spring of this year.
WHERE WE'RE GOING
Poll time! What kind of ending will Fable have? (This is just an interest check I'm going to do whatever I want.)
The good ending is something along the lines of their disbandment when their contracts expire. The bad ending is they succumb to what might be the only scandal that could kill them. After they made it through Mingeun's rough patch I really believe they could survive anything else, EXO/cockroaches of kpop-style.
Other than that, I don't have many more plot points fleshed out yet. I will go wherever they take me 🫶.
#╰ to be written in ink is to be immortal — [ writing. ]#╰ to be written in ink is to be immortal — [ misc. ]#fictional idol community#kpop oc#idol oc#kpop addition#fake kpop group#no gantt chart with dependencies it was hard :(
26 notes
·
View notes
Text
Top 10 Construction Project Management Software in 2024
The construction project management world is nothing short of dynamic—a whirlwind of project deadlines, tight budgets, safety measures, and constant coordination. Whether you’re managing a bustling commercial complex, a cozy residential building, or an expansive industrial site, keeping everything running smoothly is no small feat.
Thankfully, technology has your back. Construction project management software has become a go-to solution, helping professionals streamline tasks like project planning, resource allocation, budget tracking, document control, collaboration tool, risk management, contract management, vendor relationships, and site inspections. Think of it as your digital project partner, simplifying the chaos and giving you more control.
In this guide, we’ll walk you through 10 standout tools for 2024. Whether you’re a seasoned project manager or just starting out, these solutions are designed to tackle your specific challenges. Let’s dive in and find the one that fits your needs best.
Read the full blog
#Construction Project Management Software#project management#client communication#Gantt charts#project tracking#collaboration tools
0 notes
Text
(world weary and covered in blood) having a job is just like doing quicktime events
12 notes
·
View notes
Text
true key to remembering all the stuff from college: using it in ways it was never intended to be used
#no one can stop my pseudo gantt chart for my fic series#TECHNICALLY this series is a project so i am right to use project management software for it#might go wild and add a kanban board too#(i lost my ms project license so i'm stuck trying to learn a new free tool so excuse the fact that i can't figure out how to group by fic)
10 notes
·
View notes