Snow Loading for Trusses: Why Specifying a Roof Snow Load Isn’t Enough
You might wonder what a quote about winning basketball games could possibly have to do with snow loading on trusses.  As with basketball, the importance of close teamwork also applies to a project involving metal-plate-connected wood trusses – for the best outcome, the whole team needs to be on the same page. For purposes of this blog post, the team includes the Building Designer, the Truss Designer and the Building Official, and the desired outcome is not a win per se, but rather properly loaded trusses. Snow loading on trusses is one area where things may not always go according to the game plan when everyone isn’t in accord. This post will explain how to avoid some common miscommunications about truss loading.
Which snow loads are you specifying?
Like all other design loads that apply to trusses, snow loads are determined by the Building Designer and must be specified in the construction documents for use in the design of the building and the roof trusses. But sometimes the loads that are specified don’t provide enough information to ensure that the design will be correct for the specific circumstances. In the case of designs for snow loads, there needs to be a common understanding among all parties regarding the following:
Which snow load value is to be used as the uniform design load for the snow – a ground snow or a factored ground snow?
If it is a factored snow load, then how is the ground snow to be factored?
What other conditions need to be considered besides uniform load?
Sample Snow Load Specification
For example, say the Building Designer specifies that the trusses are to be designed for a 25 psf roof snow load. At first glance, this may appear to make things easier, since there is no need to convert the ground snow to a roof snow load. So what does the Truss Designer do with this load? There are a few different possibilities:
If unbalanced snow loading isn’t required or specified, the Truss Designer may enter the 25 psf snow load as a top chord live load (TCLL), set the load duration factor to 1.15 for snow, and turn snow loading off completely. Or the 25 psf snow load could be entered as a roof snow load with the unbalanced snow loading option turned off. Provided that no slope reduction factor gets applied to the specified roof snow load, both of these methods result in the same design. However, as discussed in my first blog post on snow loading for trusses, whenever a snow load is run as a roof live load rather than a snow load, it may not be clear to all parties involved what exactly the truss has been designed for, since there will be no notes indicating the snow design criteria on the truss design drawing.
If unbalanced snow loading is required, things get a bit trickier.  There are still two scenarios as to how the truss could be designed, but this time, the design results are different:
The truss could be designed based on the assumption that ground snow is being used as the roof design snow load (pg = 25 psf); or
The truss could be designed based on the assumption that the 25 psf roof snow load is a factored ground snow load, in which case a ground snow load is back-calculated using ASCE 7 based on the specified roof snow load (pg > 25 psf)
Therein lies the problem with specifying only a roof snow load. The determination of the drift load that is required for unbalanced snow load cases requires the use of the ground snow load, pg, not the roof snow load. If the ground snow load isn’t specified, then a ground snow load needs to be assumed – and the Truss Designer and the Building Designer may not be on the same page as it relates to this design assumption.
ASCE 7 Drift Height Calculation
Even when the specification is clear regarding ground snow vs. roof snow load and the applicable snow load reduction factors, there is still the question whether any other conditions need to be considered besides uniform load. This includes not only unbalanced snow loads on standard gable roofs, but also drifting on lower roofs or in valleys, sliding snow, and any other snow-loading and/or snow accumulation considerations. Since trusses are designed as individual planar components, snow-loading conditions that go beyond the simple unbalanced load case on either side of the ridge on gable roof trusses must be detailed by the Building Designer.
Snow accumulation requirements must be detailed by the Building Designer
As mentioned in a previous blog post, the truss industry’s Load Guide entitled Guide to Good Practice for Specifying & Applying Loads to Structural Building Components provides a tool to help Building Designers, Building Officials, Truss Designers and others more easily understand, define and specify loads for trusses. Similar to the wind-loading section discussed in that previous blog post, the Load Guide has an entire section on snow loading, how specific snow-loading provisions apply to trusses and how trusses are typically designed for snow loading within the truss design software.
Snow Load Worksheet from the Load Guide
With printable worksheets that can be used to define the snow loads and examples of multiple snow- loading conditions on different roof and truss profiles, the Load Guide is an invaluable tool for getting everyone on the same page. That’s what I would call a win!
How do you ensure that your design team is all on the same page regarding the loading of trusses? What are the biggest challenges for designing truss loads in your jurisdiction? We’d love to hear your thoughts.
This blog post was originally published on January 7, 2017. 
The post Snow Loading for Trusses: Why Specifying a Roof Snow Load Isn’t Enough appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/12/snow-loading-trusses-specifying-roof-snow-load-isnt-enough/
Snow Loading for Trusses: Why Specifying a Roof Snow Load Isn’t Enough published first on your-t1-blog-url
1 note · View note
erichhughesiii · 6 years ago
Text
The Simpson Strong-Tie Excellence in Engineering Fellowship, A Grateful Adventure
Before starting my fellowship, a year seemed like a very long time to be away from my day-to-day life, my clients, and my comfort zone. I started with many questions about how I could support the Build Change team to make the biggest possible impact with this fellowship. Once I started, however, I found more than a great team; I found a family. I would like to start this blog by praising the support of every member of the teams that I worked with, including the Build Change headquarters staff, as well as the staffs of the programs in Colombia and the Philippines. 
With the staff of Build Change’s office in Colombia
Convincing people of something that is invisible, such as the risk of living in a potentially unsafe house, is like swimming upstream. Sometimes it’s hard to see the returns on all your invested effort. However, one of the immediate benefits that Build Change provides to homeowners is the peace of mind that comes from knowing that their families will be safe during an earthquake. Helping homeowners and their families stay optimistic about the future is real proof of resilience; this is the extraordinary quality we want to create in the houses Build Change constructs.  
Frustration is inevitable when you are creating social change, and this frustration requires constant injections of hope from Build Change’s leadership, both at the local and international levels. When you see the scope of the crisis of informal housing, it’s easy to become despondent.  But there’s a lot to be optimistic about. 
A moment of relaxation with Dr. Elizabeth Hausler, Founder & CEO of Build Change, and the team in the Philippines.
Before starting this adventure, my business was centered purely on the structure of buildings. Even if those buildings were designed for a particular purpose, such as schools in isolated regions of the country, I never directly got to know the people I impacted with my job. I will miss Build Change because it gave me an opportunity to meet homeowners and learn about their needs, desires, and limitations. I will miss this personal connection with the people I was working to help. Although the support I provided was mostly related to the development of technical resources, in the end, a family will be the beneficiary of my efforts.
My fellowship experience was completely positive; I had the chance to meet great people, travel, and do work I love while helping communities improve their houses. In Colombia, I played an essential role in the development of the new manual to guide the assessment and retrofitting of informal houses. This document was submitted to Colombia’s Seismic Engineering Society for approval. I also helped the Colombia Build Change team create a new set of construction drawings according to the updated manual, as well as construction specifications to be used by the Ministry of Housing in Colombia in the “Casa Digna, Vida Digna” (Decent House, Decent Life) program. This program aims to make 600,000 resilient home improvements by 2022. 
In the Philippines, I was involved in the development of a technical platform for the assessment and the retrofitting of houses using Fieldsight. The goal of this mobile application is to enable Build Change’s microfinance partners to quickly assess the potential of one-story unreinforced masonry houses for retrofitting. This information helps the microfinance partners determine their loan approvals. It was an exciting challenge, requiring a lot of creativity and XLS programming, to develop user-friendly yet powerful forms that could generate solutions consistent with reality.
Before I wrap up, I want to offer my sincere thanks to Simpson Strong-Tie for connecting me to Build Change and making this experience possible. Your collaboration and support have been immeasurable.  
For the next fellow, I hope you have an experience as fantastic as I did. This is a perfect opportunity to use engineering knowledge for the good of people that need it. Enjoy every moment. Unleash your creativity to find new and better solutions, and reach into your humanity to connect with the people who live in the homes you build.  
  The post The Simpson Strong-Tie Excellence in Engineering Fellowship, A Grateful Adventure appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/11/the-simpson-strong-tie-excellence-in-engineering-fellowship-a-grateful-adventure/
The Simpson Strong-Tie Excellence in Engineering Fellowship, A Grateful Adventure published first on your-t1-blog-url
1 note · View note
erichhughesiii · 6 years ago
Text
Trainer to the Pros — How Simpson Strong-Tie Educates the Industry
Did you know that Simpson Strong-Tie offers free education and training to the construction industry?
Indeed, we do. For several decades, Simpson Strong-Tie has made a commitment to supporting our industry, and each year we educate tens of thousands of industry pros — engineers, architects, dealers, contractors and building inspectors — about the latest building code updates and best construction practices.
Our regional training centers offer workshops providing solution options to meet current construction industry challenges, with instruction on proper specification, correct installation and the inspection of connectors and structural systems. Many of the courses include opportunities for hands-on installation and testing demonstrations of Simpson Strong-Tie products. Additionally, we offer courses on topics — such as changing construction practices, or building to resist seismic forces or high winds — of particular relevance to specific geographic regions.
This commitment to education sets us apart within the manufacturing industry, and it’s an aspect of our customer service in which we take great pride as a company.
Why does Simpson Strong-Tie offer training to construction industry professionals?
Simpson Strong-Tie has been designing and manufacturing construction solutions for more than sixty years, with the goal of helping people build safer structures. Construction is an industry we’re deeply committed to, and we take our responsibilities as a building manufacturer very seriously. All our training efforts are ultimately focused on improving construction quality and the overall strength and safety of structures.
More specifically, we want to make sure the right products are specified and that they’re installed correctly, for the safety of the building occupants and the reputation of all our partners — specifiers, contractors and dealers.
Besides all the good business reasons to build lasting relationships with our customers, we have a passion for education and feel an obligation to support the industry and communities that have contributed to our success over the decades.
What topics does Simpson Strong-Tie cover in its training?
We cover a very broad range of topics of use to designers, installers, building officials, and other construction professionals. What follows is a modest sample of current course offerings:
Concrete Deterioration
Adhesive and Mechanical Anchor Installation
Continuous Load Path / Wood Deck Workshop
Flood-Resistant Construction — Connections
Wall-Bracing Requirements of the IRC
Narrow Bracing Solutions and Shearwall Design
Soft-Story Retrofit
Wind-Resistant Construction — Connections for a Stronger Home
Wood-Framed Seismic Design
But really there’s no limit to the number. Our topics reflect the feedback of our customers. Where there’s a need, we create a course.
Is it easy for industry professionals to access training from Simpson Strong-Tie?
We do everything we can to make training as accessible as possible. We have regional training centers across North America, and we have specialists in every region who are available to visit your company for in-person instruction.
In addition to our live workshops and presentations, we also offer live and recorded webinars and a wide range of online courses that are available for credits.
What does the course participant gain from the training?
First of all, the training gives customers a complimentary and convenient source of practical knowledge about the finer points of their jobs.
Our courses are facilitated by knowledgeable instructors with a passion for providing substantive education, often in tandem with registered engineers who provide in-depth technical expertise in the subject matter. “The workshops are very interactive,” explains Charlie Roesset, Director of Training for Simpson Strong-Tie. “Depending on the course, students may have the opportunity to view product samples or take part in product testing and installations.”
“There’s no other manufacturer who provides such extensive training programs,” according to Roesset. “Specifiers and building officials have come to rely on these courses to keep abreast of the latest code updates and technical information.”
Furthermore, the courses provide an excellent means for customers to earn professional credits within their field.
Can participants receive PDHs and CEUs for completing courses?
Yes. Training participants receive a certificate of attendance with professional development hours (PDHs) at the end of each workshop, and may earn continuing education units (CEUs) by completing additional requirements, such as a test at the end of the course. All of our on-demand courses offer PDHs, and many offer CEUs, AIA Learning Units (LUs) and ICC CEUs.
Simpson Strong-Tie is a registered education provider with a number of industry organizations and associations including the American Institute of Building Design(AIBD), the American Institute of Architects (AIA), the International Code Council (ICC) and the International Association for Continuing Education and Training (IACET). Our courses are also accredited by a number of state or regional licensing organizations.
What is the cost of the courses?
Nothing! All our workshops, webinars and online courses are completely free of charge.
Why does Simpson Strong-Tie offer its training free of charge?
We believe it’s important that construction professionals understand our product solutions, their proper specification and installation, and their larger role in building strong, safe structures. We take pride in providing users not just with products, but with complete design and building solutions that include training and engineering support.
It’s one of the ways we try to give back to our customers, industry and communities.
What have participants had to say about the training we provide?
Response from participants in our courses has been very enthusiastic. Here’s a representative selection of their feedback:
“Todd was very thorough and knowledgeable. He understood our needs and interests and addressed those directly, without misusing our limited time.” – Gray H., structural engineer, Evansville, IN (Simpson Strong-Tie Anchor Designer Software— box-lunch product knowledge presentation)
“Absolutely impressed with the content, graphics, learning pace, and style. I love how individual issues are represented: with a graphic, photos, code references, and failure examples — all together. Wish all CE courses were like this!” – Daniel K., inspector, Zionsville, IN (Deck Inspection for New and Existing Construction— online)
“Simpson webinars have been very informative and are a valuable training tool for young engineers . . . please keep up the great work.” – Donald O., engineer, San Diego, CA (Upgrade Your Coiled Strap— webinar)
Where can I learn more about your training offerings?
To explore the range of our current offerings and register for a workshop or online course, visit training.strongtie.com/learn or contact your local Simpson Strong-Tie representative at (800) 999-5099to schedule a box-lunch presentation at your business.Have questions, or suggestions for new courses? Please email us at [email protected].
Thank you, and keep on learning!
The post Trainer to the Pros — How Simpson Strong-Tie Educates the Industry appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/11/why-simpson-strong-tie-offers-free-education-and-training/
Trainer to the Pros — How Simpson Strong-Tie Educates the Industry published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Adjustable Hanger or Custom Hanger — You Make the Call
It would be a lot simpler for designing engineers if structural connections were always for members at right angles to one another. Often, connections have to be designed for supported members that are at a skewed or sloped angle rather than perpendicular to the header. In these cases, the engineer will have to choose between a premanufactured adjustable hanger and a custom hanger. Simpson Strong-Tie offers both options, and in the following post, Randy Shackelford, P.E., discusses the various considerations that may affect a specifier’s choice.
It makes things easy for an engineer when the building being designed is rectangular. This allows you to make the connections between nice perpendicular members, and standard connectors and joist hangers are easy to specify.
But buildings are not always rectangular and connections are not always between perpendicular members. Non-perpendicular members can have a skewed connection, where the supported member is moved side to side from perpendicular; or a sloped connection, where the supported member slopes up or down from a standard horizontal orientation; or a combination of the two.
To help with these situations, Simpson Strong-Tie offers the option of either premanufactured adjustable hangers or custom-manufactured hangers. The choice may depend on the time frame in which the hanger is needed, the load demands that will be placed on the hanger, the cost of the hanger, or all of these.
Typical HWP manufactured sloped down, skewed right with type A hanger (joist end must be bevel-cut). This illustration shows the high side flush option where the top of the sloped member is flush with the top of the supporting beam.
If the demand load is low or an immediate solution is needed, Simpson Strong-Tie offers several adjustable hangers that can be skewed, sloped, or both in the field. Adjustable hangers are likely to be the most cost-effective option if they meet the load requirements of the connection.
Simpson Strong-Tie has recently revamped its offerings of adjustable joist hangers. The older versions of adjustable hangers, known as the LSU and LSSU series, required that the hanger be attached to the carrying member before installation of the carried joist. This required a disruption of the normal installation sequence in the field. Two new models of adjustable joist hangers have been developed that can be installed after the joist is placed on the supporting member.
For lighter loads, as in a rafter-to-hip connection, the newly developed LSSJ is an economical option. It installs on only one side so all the fastener holes are easily accessible. Because it doesn’t have a flange that extends behind the rafter or joist, it can be installed as a retrofit. It accommodates roof pitches from 0:12 to 12:12. The swivel seat provides the code-required bearing for the rafter/joist. Finally, note that the hanger comes in two models, LSSJR for skewed right, and  LSSJL for skewed left.
LSSJ installation on hip roof
For heavier loads, a new double-sided adjustable hanger has been developed, the LSSR slopeable/skewable rafter hanger. This new design allows the hanger to be installed after the sloped joist or rafter is already in place. The bendable side flange design allows for easy skew adjustment for angles of 0° to 45° from perpendicular. In addition, the swivel seat provides bearing for the joist or rafter and allows adjustment from horizontal to 45° downward.
LSSR installed skewed left, sloped down
Other hanger series are adjustable only for skew or slope, but not for both. For example, the THASR/L series is designed to accommodate connections skewed from 22½° to 75°. Conversely, the new LRU ridge hanger is designed to support rafters at ridge beams with roof slopes of 0:12 to 14:12. Finally, the SUR/SUL/HSUR/HSUL series is not adjustable, but is manufactured with a skew of 45° either right or left in several sizes.
THASL Hanger
LRU Ridge Connector
HSUR Hanger
If none of these premanufactured solutions fits your specific need, you still have the option of ordering a custom-manufactured hanger. Many, but not all, joist hangers can be custom-made for specific slopes, skews, combinations of slopes and skews, and even alternative widths and alternative top-flange configurations.
If this type of hanger is needed, a good place to start is the Hanger Options Matrix on pages 98–99 of the 2019 Simpson Strong-Tie® Wood Construction Connectors catalog, available both in print and at strongtie.com. An excerpt is shown below. This chart identifies which hangers can be modified, how they can be modified, and to what extent. There are two tables — one for top-flange hangers and one for face-mount hangers. The one shown here is for top-flange hangers:
The Hanger Options Matrix is available in the Simpson Strong-Tie® Wood Construction Connectors catalog or at strongtie.com. Follow the link for the large version.
Once the user has found a hanger that can be modified to fit the actual situation, the next step is to calculate any load reductions, if applicable. The column at the far right gives the Wood Construction Connectors catalog page number that lists any load reductions for the various options. If multiple options with reductions are noted, only the most restrictive load reduction needs to be applied, not all the reductions.
For example, let’s say we need to hang a double LVL hip member from the end of a double LVL beam using a top-flange hanger. For economy, we will first check the WP top-flange hanger, skewed 45° to the right, sloped down 45°, with its top flange offset to the left. We see from the table above that all these options are permitted. If we go to page 167 (or strongtie.com), we can see what the load reductions would be for these options. The reductions are shown in this table:
Modifications and Associated Load Reductions for WP/HWP/HWPH
The reduction shown for the seat sloped down is 0.80, and the reduction for offset top flange and skewed seat is 0.50. Taking the most severe, the load reduction would be 0.50 on the published download.
The next thing to do is to call out the desired hanger properly so Simpson Strong-Tie can manufacture it to your needs. This is typically done by taking the regular product name, adding an X, and then calling out the modifications individually at the end.
For our hanger in the example, assuming the hip is 3 1/2″ by 9 1/4″, the standard hanger would be a WP3.56X, H=9.25, and the modified hanger would be called out as a WP3.56X, H=9.25, Skew R 45, Slope D 45, TF offset L.
There is one final consideration when hangers are both sloped and skewed. In this case, the top of the supported member (joist) will not be horizontal when it is cut, one side will be higher than the other. The user must decide and specify where the upper side of the joist will fall. There are three options: high-side flush, center flush or low-side flush. We see that often users will want to specify high-side flush so that the joist ends up flush with the top of the supporting member, but that would be up to the user. This specification is added to the end of the callout name listed above. These cases are illustrated below:
Typical GLT Sloped Down, Skewed Right When ordering specify Low Side Flush, Center Flush or High Side Flush
A related matter occurs when the top flange of a hanger is sloped up or down. In this case the user also has to specify whether the joist is to be low-side flush, center flush, or high-side flush. However, in this case, the side is in reference to the top flange, not the joist. Specifying low-side flush will result in the top of the joist being flush with the lower side of the sloped top flange, not the low side of the joist.
If all of this seems confusing and somewhat difficult, it can be. Fortunately, Simpson Strong-Tie has developed a new web application — the Joist Hanger Selector — which automates this entire process. This app is located on strongtie.com.
Once you agree to the terms and conditions, choose the type of hanger you want to specify, then select the types of members being connected. This is what it would look like for our example:
Then you need to specify any modifications that are required. Required loads can also be entered at this point. This is what it would look like for our example:
Then, just click “CALCULATE” and the possible options will be shown. And here we see our WP3.56X, Skew R 45, Slope D 45, TF offset L, with an even more detailed answer that we need to specify the Height as 9.188, not 9.125. That ensures that the top of the joist will be flush with the top of the ridge, not with the top of the hanger. And we see that the load is 1,820, which is 0.50 times the published load of 3,635 when installed with two 16d (0.162″x 3 1/2″) nails into the top flange. I love it when a plan comes together.
Hopefully, this web app will help you specify custom hangers with ease. In addition, there is also a downloadable Connector Selector® application that can also help users pick various types of connectors.
Are there any other applications we could develop that would make specifying connectors easier? Let us know.
The original version of this story was published on Oct 23, 2014. It has been updated to reflect new products and technology.
The post Adjustable Hanger or Custom Hanger — You Make the Call appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/10/how-to-specify-a-custom-hanger/
Adjustable Hanger or Custom Hanger — You Make the Call published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Good Ideas Come from Many Places — “Necessity Is the Mother of Invention”
You never know where the next great product idea or innovation is going to come from — some of our best new ideas originate with the customers who use our current products. At Simpson Strong-Tie, we welcome any inspiration that can help us serve our customers’ needs even better. With so much competition, however, and because so much research and testing are entailed in developing each new product, the criteria that an idea must meet to gain eventual acceptance are necessarily quite rigorous. In this post, Steve Rotzin, Manager of Intellectual Property and Legal Services at Simpson Strong-Tie, outlines some of these criteria for your consideration.
All of us, at one time or another, dream up a product idea of some sort. My wife was once sanding the tongue-and-groove boards of our living room ceiling and she thought of a very cool idea of gloves that had Velcro on them and users could interchange sandpaper of various grit on any finger of the glove. If you’ve ever sanded anything, this actually made a lot of sense especially for complex shapes and tough to reach spots. I researched it and found out that someone had already thought of it and “patented it.”
We are no different here at Simpson Strong-Tie Company. We are constantly thinking of ways to make the very best products, incorporating innovative features to make the installation as easy and cost effective as possible. We also strive to exceed the performance requirements of the application in order to help build the strongest, safest possible structures. While these ideas are something we think about day in and day out, we also know you think about solutions as well. It’s you who encounter circumstances where our parts may not work as needed or fail to meet a specific need or application. These are the times we receive ideas from customers hoping we might adopt or develop an idea to meet their needs.
Annually, we receive a number of ideas from outside the company, even though they’re not something we actively solicit. The truth is that product ideas from consumers, especially ideas that come from consumers who work in the construction industry, are often relevant and timely. To make it easier for you to share feedback and ideas, we’ve set up a process whereby anyone who has an idea they’d like to share, can submit it to us for evaluation.
Here are some tips to help your product idea receive our fullest consideration, :
Do Your Research — Has someone invented this before? You might be surprised by how many ideas have come and gone. Ideas that we think are novel and have never been attempted by anyone else have often been manufactured, sold and put out to pasture years before we thought of them. So do some research. Also, just because you don’t see the exact same thing doesn’t mean the elements which could be patented, or protected, in your device haven’t been claimed before in someone else’s patent.
Protect Yourself — Make sure you’ve taken steps to ensure you are protected. Did someone else help you? Could someone else claim ownership? Have you filed for a provisional application with the United States Patent and Trademark Office? We cannot offer legal advice, but seeking legal advice from a patent professional is always a good idea.
Cost Considerations — When we receive ideas, often those ideas overlook cost. Yes, they serve a need, but they’d probably never be manufactured or purchased because they would cost several times more than the market will bear. You can build a better mousetrap, but that doesn’t mean anyone will buy it. Be sure you’ve considered how much steel or material your product is using. Also, consider that things like “door hinges” and secondary manufacturing processes are steps that add cost and most likely will make the product too expensive to the end user. A product that significantly increases a structure’s overall volume or thickness isn’t advisable, either. Those are just a few factors you may want to consider.
Approvals — Please consider what approvals your product might require. Products that arrive at Simpson Strong-Tie with ICC code reports, UL listing, IAPMO or other approvals or that are already patented receive the highest attention.
How to Submit — if you’re still interested in submitting to Simpson, please visit strongtie.com/ideas. Print the documents, fill them out and return them to the name at the bottom of the form. Please be sure you’ve included pictures or drawings of your product or application.
Timing — It may take some time for us to review your idea. Simpson does review most ideas, and those ideas that have all the elements discussed above usually receive the quickest response. If you have any questions, you are welcome to reach out to us.
Thank you for considering Simpson for your ideas.
  The post Good Ideas Come from Many Places — “Necessity Is the Mother of Invention” appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/10/good-ideas-come-many-places-necessity-mother-invention/
Good Ideas Come from Many Places — “Necessity Is the Mother of Invention” published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Protected: Case Study: Shoring Up Aging Concrete Grain Silos with Fiber-Reinforced Polymer
This content is password protected. To view it please enter your password below:
Password:
The post Protected: Case Study: Shoring Up Aging Concrete Grain Silos with Fiber-Reinforced Polymer appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/10/case-study-shoring-up-aging-concrete-grain-silos-with-fiber-reinforced-polymer/
Protected: Case Study: Shoring Up Aging Concrete Grain Silos with Fiber-Reinforced Polymer published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Questions Answered: Deck Ledger Connections for Wood and Masonry
In this post, we follow up on our July webinar, Safer, Stronger Decks: Ledger Connections for Wood and Masonry, by answering some of the interesting questions raised by attendees.
During the webinar we discussed code-compliant ledger connection options for both wood and masonry construction. In case you weren’t able to join our discussion, you can watch the on-demand webinar and earn PDH and CEU credits here.
As with our previous webinars, we ended with a Q&A session for the attendees. Our R&D engineers Scott Fischer and Rachel Holland answered as many as they could in the time allowed. Now we are back to recap some of the commonly asked questions and their answers, but if you’d like to see the full list, click here.
GENERAL DECK BUILDING AND CODE REQUIREMENTS
What are the drawbacks to not using a ledger and fastening hangers through siding into rim?
Testing and research has shown that if joists are not properly fastened to a ledger board that is allowed to continuously transfer gravity and lateral loads, then the connection to the supporting structure can be compromised. Per the 2018 IRC, R507.9.1, vertical loads shall be transferred to band joists with ledger in accordance with Section R507.9.1 and lateral loads shall be connected per Section R507.9.2. In addition to the structural concerns that may occur, weather proofing and flashing can cause a long-term concern and the integrity of your deck may be at risk.
The live load on page 25 shall be modified to minimum 60 psf (1.5 X 40) per code in our area on 2016 CRC and CBC?
The 2018 IRC, Table R301.5 (40 psf live for decks) and Table R507.9.1.3(1) call out the live load as 40 psf along with a deck dead load of 10 psf and a snow load of <= 40 psf.  DCA6, Table 5 has similar requirements and the same 40 psf live load and 10 psf dead load. The 2018 IBC, Table 1607.1, Item 5 does call out a 1.5 multiplier to the IRC 40 psf (1.5 x 40 = 60 psf), so if the IBC is used for decks by the building department, if it is an engineered design where the engineer follows the IBC, or if the building department imposes their own amendments and it becomes code in this part of the country, it would be a local requirement until adopted by the IRC and/or DCA6. 
Question on decks attached on a cantilevered floor — is there a special connection coming up towards the floor rim towards the ledger for decks?
The 2018 IRC Section R507.8 states that the deck must be positively anchored to the primary structure to take both vertical and lateral loads and Figure R507.9.1.3(2) references “Existing 2x Band Joist or Engineered Rim Board.” Section R507.9.1.2 also allows for 1″ x 9.5″ dimensional laminated veneer lumber. 
Additionally, the band joist of the home must bear fully on the primary structure capable of supporting all required loads. If the band or rim of the home does not meet these minimums, the building official may consider this to be unverifiable and may require a self-supported deck.
Any recommendations for home inspectors when spacing of any aspect of the ledger attachment does not meet code? DCA6?
If it is found that the ledger is adequately placed against the supporting structure and has sound contact with the home’s structural sheathing and band joist (i.e., confirm that the deck is being placed against a structure that can support the vertical and lateral loads of the deck), then adding SDWS screws to the ledger into the supporting structure may be a viable option to help make up for mis-spaced or improperly located existing lags or bolts. Load capacities and spacing minimums for this fastener are shown in our Fastening Systems catalog, C-F-2019 and in several letters and fliers, including L-F-LDGRFSTNR19 and S-F-SDWLGRTP18.
LEDGER ATTACHMENT WITH FASTENERS (LAG SCREWS, THRU-BOLTS, STRUCTURAL SCREWS)
What if the anchor bolts/screws are not staggered or are installed in pairs?
In order to install the most amount of fasteners without having an exceeding number of them be within any one continuous grain line within your wood member, staggering is necessary. Also note, a great amount of testing has been performed on these different bolt and lag screw installs — whether in conjunction with The American Wood Council, NADRA, or through several universities throughout the US. The testing has shown that the staggered spacing is the most effective installation method. 
CORROSION, FLASHING AND WEATHERPROOFING
Is this a manufacturer’s listing requirement for stainless steel? If it is within 10 miles, does that void the warranty?
The 2018 IRC, Table R507.2.3 references the distance as, “..located within 300 feet of a salt water shoreline shall be stainless steel.” However, the NADRA guide references several studies, including one done by the International Molybdenum Association titled “Stainless Steel for Coastal and Salt Corrosion” and recommends that locations within five to 10 miles of saltwater are considered at risk for chloride-related corrosion. Also, the Cedar Bureau (cedarbureau.org) recommends 316 SS within 15 miles of salt water. We recommend simply discussing the minimum requirements as set forth by your local building official to be assured that you are meeting the minimum coverage for your area.
How do we mitigate condensation moisture around the screws and the wood? We see long-term wood deterioration because of moisture (from inside the conditione space, evidently) at the screws through a membrane.
Weatherproofing as required by code is still necessary with the BVLZ install. The compression strut and ledger plate are both ZMAX®. The SDWH screw has ASTM 153, Class C HDG coating, which gives a high level of corrosion protection. Reference Simpson Strong-Tie® corrosion information at strongtie.com/corrosion.
LATERAL LOAD CONNECTION
Isn’t the tie within 24″ over ends for DTT1 ties?
The deck lateral load connection being within 24″ of the ends of the deck is required for both the DTT2Z and the DTT1Z. See 2018 IRC, R507.9.2 as well as current Simpson Strong-Tie tech bulletin T-C-DECKLAT19.
BVLZ BRICK VENEER LEDGER CONNECTOR INSTALLATION AND USE
What is the maximum gap?
The BVLZ accommodates a “gap” distance between the structural framing and the ledger from 4 3/4″ to 6 1/4″. When WSP is present, the gap between the WSP and the ledger must be between 4 1/4″ and 5 3/4″.
What keeps the compression member of the BVLZ from puncturing the rim board?
The allowable load of the BVLZ is not large enough for the compression strut to puncture a 2x rim. We have done calculations on the surface area of the compression strut’s folded end cap and tests to prove this.
What suggestions or research do you offer for attaching a ledger over one to two inches of continuous insulation?
The BVLZ can be installed when foam board insulation is present. Drill through the foam board where the compression strut will be so as to allow the compression strut to bear on structural framing.
How do you drill in at 40 degrees?
You can use a speed square to help you find the 40-degree angle. We have seen customers cut out small blocks to use as guides when drilling the holes at 40 degrees in both the masonry and the ledger. Also, the holes are oversized compared to the shaft of the SDWH screw, so if your drilling angle is off by +/- 1 degree, you can still use the self-jigging feature on the ledger plate to install the screw at the correct angle.
The post Questions Answered: Deck Ledger Connections for Wood and Masonry appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/09/questions-answered-deck-ledger-connections-for-wood-and-masonry/
Questions Answered: Deck Ledger Connections for Wood and Masonry published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Are You Ready to Design Post-Installed Anchors in Cracked Masonry?
Design criteria for cracked-concrete masonry units are finally available for adhesive anchors.
It has been over 15 years since cracked concrete changed the way anchorage to concrete was qualified and designed. The ICC International Building Code (IBC) 2003 referenced American Concrete Institute (ACI) 318-02 Appendix D as a design provision for both cast-in-place and post-installed anchors into concrete. Appendix D was the first introduction of cracked concrete to designers. These design provisions required mechanical anchors to be qualified per ACI 355.2, which mandated testing  of anchors in cracks. The Masonry Society (TMS) 405 has not addressed cracks in concrete masonry units since the code’s introduction to concrete in 2003. The Concrete and Masonry Anchor Manufacturers Association (CAMA) has taken on the task of introducing cracked masonry unit testing, qualification and design by updating Acceptance Criteria AC58. These criteria were developed to address the testing and qualification of adhesive anchors in grouted, hollow, and partially grouted concrete masonry units, as well as in brick masonry units.
We’ve composed this blog post to help keep you informed of the new design provisions being proposed in ICC-ES. At the end of this article, you’ll have the opportunity to provide comments directly to ICC-ES.  It’s advisable to download the proposed criteria at the following link to follow along as you read this post.
https://icc-es.org/wp-content/uploads/2019/08/1-AC58-1019-R1.pdf
History
AC58 was first issued by ICC-ES in 1995 to address the performance parameters of adhesive anchors in both concrete and masonry. It included adverse service condition tests for these anchors such as dampness, elevated temperature and sustained load. However, the criteria were limited to uncracked concrete and masonry. In 2006, AC308 was introduced to address adhesive anchors in both cracked and uncracked concrete and to require the use of strength design as opposed to allowable stress design. The new criteriaincluded testing in adverse conditions, derived from AC58. The issuance of AC308 required AC58 to be modified in late 2006 to cover only uncracked masonry base materials for adhesive anchors using allowable stress design. As the acceptance and use of AC308 has grown, it became clear AC58 needed to be updated to cover both cracked and uncracked masonry.
Tests
The test regimenin the revised AC58 mirrors the test regimenof AC308, and is broken into three categories:
Reference tests: Tests conducted in grout-filled masonry in the center of the cell, bed joint, web and top of wall. In addition, testing may be conducted in a cracked bed joint.
These tests are used to establish the nominal bond strength for the adhesive anchor in uncracked masonry and cracked masonry.
Reliability tests: Tests conducted in grout-filled masonry in partially cleaned holes, water-saturated masonry, freezing and thawing conditions, sustained loads, installation direction and large crack widths.
These tests determine the anchor category for the product and generate reduction factors that are applied to the nominal bond strength of the anchor.
Service-condition tests: Tests conducted in grout-filled masonry at elevated temperatures, at decreased installation temperatures, and for resistance to alkalinity and sulfur. In addition, seismic tension and shear testing may be conducted.
These tests establish temperature range and environmental exposure limits for the product. The seismic tests generate reduction factors that are applied to the nominal bond strength of the anchor.
AC58 also includes test programs for hollow masonry and brick wall construction. The tests required in these base materials are similar to the tests noted above.
Figure 1: Figure 3.1 of AC58 showing the different types of masonry that the criteria cover. 3.3: Fully grouted CMU. 3.4: Hollow CMU. 3.5: Partially grouted CMU. 3.6: Brick masonry.
Design changes
Section 3.0 of the revised AC58 introduces design provisions that should be used for products qualified by these criteria. These designs were derived from ACI 318-14 Chapter 17, Anchorage to Concrete (Appendix D prior to 2014).. The uniform bond model for adhesive anchors contained in ACI 318 has been shown to represent the behavior of adhesive anchors in grouted masonry. CAMA proposes modifications to the existing ACI 318 design provisions to accommodate the uniqueness of grouted concrete masonry units. Table 3.1 in AC58 summarizes the sections within ACI 318 that were modified to accommodate grouted concrete masonry units. These provisions are to be applied to structures assigned to Seismic Design Category (SDC) C, D, E and F. Due to the expected brittle failure of the masonry units, the maximum tension and shear design load combinations that should be applied to these provisions are combinations that include E, with Ehincreased by Ωo.  Provisions for strength design in concrete masonry units are broken out in several sections. Section 3.3 of AC58 providethe strength design provisions for fully grouted masonry units. The subsections of 3.3 providethe details of calculating the concrete and bond capacities, with modifications to accommodate the unique property of grouted masonry units.
As in concrete applications, the method for determining the design strength of adhesive anchors in grouted masonry comparesthree different failure modes, as defined in section 3.3.2.4.3 of AC58.
∅Nsa, steel failure of anchor rod for a single anchor.
75∅Nmb, masonry breakout.
75∅Nma, bond strength of adhesive in masonry.
These calculated design strengths shall be compared to the calculated factored loads as shown in Table 3.2 of AC58. The strength reduction factors, φ,multiplied by the nominal strength, havebeen modified to accommodate the failure modes associated with concrete masonry units;these aredefined in section 3.3.2.9 of AC58.
The nominal breakout strength is defined in section 3.3.2.11. The definition has been modified from ACI 318-14. As with concrete, the nominal breakout strength is calculated using modification factors multiplied to a basic masonry breakout strength. The basic masonry breakout strength has been defined in section 3.3.2.12. The change made in this equation is the calculation of the effectiveness factor, km, for breakout strength in masonry. kmfor masonry materials is defined as a reduction factor of 0.7 multiplied by the effectiveness factor for breakout strength in concrete, kc. The reduction factor of 0.7 was proposed by CAMA in AC58 due to the lack of testing of post-installed adhesive anchors in concrete masonry units.
As in concrete applications, the nominal adhesive bond strength in masonry shall be calculated per section 3.3.2.10. The basic bond strength that is utilized in the nominal bond strength is calculated per section 3.3.2.11. In the basic bond strength, the effective embedment, hef, had to be defined. Figure2 below provides guidance on dimensional parameters as defined in section 1.5 of AC58.
Figure 2: Dimensional parameters of grouted masonry units.
Voids in grouted masonry units are common. AC58 provides definition of the edge distances associated with grouted masonry. Figure 3 shows how the criteria definethe edge distances associated with the adhesive anchors qualified per this criterion.
Figure 3: (A) Edge considerations for common grouted masonry units with hollow head joints. (B) Exclusive joints where anchors should be not be installed with hollow head joints. (C) Edge considerations in fully grouted masonry units with solid head joints.
Design provisions were also provided for ungrouted concrete masonry units. Section 3.4 of the criteria provides the details associated with calculating the strength in ungrouted concrete masonry units. Figure 4 below shows the dimensional parameters for ungrouted masonry units.
Figure 4: Dimensional parameters of ungrouted masonry units with screen tubes.
  Unlike in grouted masonry units, the critical edge and spacing requirements are defined in AC58 in table 3.3 below.
You may wonder what happens if your anchors are spaced less than the prescribed dimension in table 3.3. Unlike for grouted masonry, group anchor calculations for ungrouted masonry arenot permitted. Section 3.4.2.3.2 of AC58 states that the design strength of any group of anchors spaced less than 8″apart shall be calculated as the strength of a single anchor.
Provisions required to calculate the strength of partially grouted masonry can be found in section 3.5 of AC58. Mixture of grouted and ungrouted provisions shall be used for design of anchors in partially grouted concrete masonry units. Section 3.5.3 defines what to do if your anchor falls within the grouted part of the cell or parts of the cell that are not grouted.
Edge distances are unique in partially grouted masonry units. Figure 5 below shows the edge distances to consider if the location of the grouted cells are known. If the locations of grouted cells are unknown, the design of anchors shall be in accordance with the Ungrouted provisions in section 3.4 of AC58.
Figure 5: Edge distance consideration in partially grouted masonry units.
Clay brick masonry construction also has design provisions in section 3.6 of AC58. Figure 6 below provides the dimensional parameters of brick unit masonry.
Figure 6: Dimensional parameters of brick unit masonry with screen tubes.
The provisions for this type of masonry units are similar to ungrouted masonry units. The edge and spacing requirements are prescribed in table 3.5 in AC58, see below. A screen tube must be used when installing into this type of substrate. Any spacing of a group of anchors less than 8″apart shall be considered as a single anchor.
These proposed design changes for grouted, hollow, and partially grouted concrete masonry units, and for brick masonry units are very different from the current TMS 405 being enforced in the masonry design community. Designers are now faced with two different design methodologiesif they’re designing a cast-in-place rather than a post-installed masonry anchor. The new evaluation reports that will be qualified per AC58 will have design examples to give professionals  the necessary guidance in selecting the best adhesive solution.
Status of the revised AC58
The revised AC58 will be reviewed and considered for adoption at the ICC-ES Evaluation Committee hearing in early October 2019. The document is currently posted on the ICC-ES website for review, and comments from interested parties will be accepted by ICC-ES until September 10, 2019. You’re encouraged to read the document and submit any comments you may have directly to ICC-ES.
What’s next?
Once the revised AC58 is adopted by ICC-ES, similar revisions will need to be made to AC01 (Acceptance Criteria for Expansion Anchors in Masonry Elements) and AC106 (Acceptance Criteria for Predrilled Fasteners — Screw Anchors — in Masonry). I can report that work in this direction is currently underway, using a test regimenthat mirrors the test regimenof AC193 (Acceptance Criteria for Mechanical Anchors in Concrete Elements). In addition, since AC193 addresses both expansion anchors and screw anchors, it is most likely that a revised AC01 will also include screw anchors.
How can you participate?
Do you agree with the new design methodology proposed in the new AC58?
Dothe design strength differencesbetween cast-in-place anchors designed per TMS 405 andpost-installed adhesive anchors qualified and designed per AC58 makesense to you?
Do the cracked widths proposed in these criteria make sense for grouted masonry units?
Do you believe this new design methodology and its proposed qualification needmore research?
If you have these or other questions after reading this blog post, you’re encouraged to review the revised AC58 in its entirety. This document is available for public review on the ICC-ES website. Click on the link below to download the proposed criteria. . Should you have comments about anything contained in the document, you can submit those comments directly to ICC-ES by email at [email protected]. Public comments are welcome through September 10, 2019.
Download the proposed criteria here.
..
Don’t let the Cracked Grouted Masonry design provisions sneak up on you the way Cracked Concrete may have in 2003. Be part of the review process and provide your comments to ICC-ES before the revised AC58 goes into enforcement.
Authors: Chris LaVine, Marlou B. Rodriguez, S.E.
The post Are You Ready to Design Post-Installed Anchors in Cracked Masonry? appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/08/are-you-ready-to-design-post-installed-anchors-in-cracked-masonry/
Are You Ready to Design Post-Installed Anchors in Cracked Masonry? published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
The Role of Microfinance Institutions in Build Change’s Retrofitting Strategy
The year is moving fast; my time supporting the team in Colombia is over. My time is now fully committed to the program in the Philippines.
During my initial trip, I had the chance to visit some of the communities where Build Change has been working and become familiar with the existing tools used in these communities. Also, I was introduced to the crucial role that microfinance institutions (MFIs) play in Build Change’s strategy to retrofit vulnerable houses in the Philippines.
A lot of questions came to mind after that trip. Specifically, how to transfer the governmental responsibility of having safer houses for the low-income population to an external agent, and how to make MFIs’ business of providing loans to retrofit houses profitable? Compared with Colombia, where the government plays the principal role of providing grants to homeowners to retrofit their houses, there is very little government involvement in improving informal housing in the Philippines. Instead, microfinance institutions play a pivotal role in working directly with homeowners to finance housing retrofits.
MFIs have been working in the Philippines for many years. According to the Banko Sentral ng Pilipinas and the Asian Development Bank, MFIs are organizations that offer a broad range of financial services such as loans, payment services, money transfers, and insurance products to low-income homeowners or households and their microenterprises. Small loans from microfinance institutions are recognized as an effective method of directly improving the lives of those in need — a service that can often have a long-lasting impact.
Homeowners and households must successfully navigate several steps to obtain credit from an MFI. For example, the homeowner has to submit a membership application, there is a background check investigation, there is general documentation to be filled out, and the homeowner must pay a safety deposit that is usually 20% of the total loan (applicable on some loans). This last requirement reduces, in general, the total amount of money that can be used in retrofit applications.
Deficiencies in informal construction in the Philippines are similar to deficiencies identified worldwide in these types of structures, including a lack of a ring beam on the top of masonry walls, inferior quality materials, inadequate locations of openings, excessive openings in shear walls, irregular layouts, and high gable walls. Developing a full retrofitting assessment and solutions for a house requires a lot of engineering effort and time in order to obtain buildable documents and building permits. As a result, Build Change developed a simplified approach focusing on eight deficiencies:
All exterior walls must include a minimum solid wall length of 1.5 meters or 35% of the total length of the wall. This requirement reduces potential torsion effects in the house.
Columns are required at the intersections and ends of walls, allowing the transformation of a partially confined or unconfined masonry system into a confined masonry system.
Ring beams are required on top of the walls. Many homeowners of informal one-story houses wait to build a ring beam until the concrete slab is poured during a second floor expansion. In the meantime, these houses are vulnerable to earthquakes and wind forces.
Openings must be protected by the placement of confining elements around them. This enhances the performance of the wall as a confined masonry member.
For unplastered masonry walls, 1.5 centimeters of mortar plaster are specified at each side.
If parallel walls spaced more than 3 meters apart exist, a new perpendicular CMU wall 1 meter long between parallel walls is required to buttress the walls for out-of-plane lateral forces.
If a masonry gable wall exists, two options are specified: Construct a slanted ring beam at the top of the gable wall; or demolish the wall and replace it with a gable wall made of a lightweight material such as timber.
Anchor the roof framing to the ring beams with metal straps, if not previously completed.
The full application of this retrofit strategy typically creates a total scope of work that far exceeds the loan amount accessible to homeowners through an MFI. Therefore, prioritizing and dividing the scope of work into different phases is required. It demands extra engineering time. To make this work scalable, existing resources must be improved to automate as much of this process as possible.
MFIs use loan officers as liaisons between the institution, the homeowner, and Build Change. Loan officers are usually salespersons without a technical background. However, the assessments that they perform require the loan officers to take actual house measurements. With very little guidance on how to take accurate measurements, they may find this process too complicated. Any confusion when performing an assessment will likely affect the quality of the final bill of quantities (BOQ) and scope of work.
Figure 1. Tool developed for loan officers to guide them through assessments.
In response to these problems, Build Change has created an XLMForm application using FieldSight, an application developed by UNOPS and the World Vision Nepal Innovation Lab to ensure Nepal is properly rebuilt after the devastating earthquake of 2015. This platform allows data collected by loan officers in the field to be directly monitored from Build Change’s office. A new feature of the app involves using pictures to help loan officers identify the elements that must be measured and minimize the judgment and interpretation required by the loan officer.
Currently, only a single typology (one-story houses without future expansions) is available in this simplified procedure. However, the goal is to extend the app to cover other typologies, such as one-story houses with the capacity for future expansion, two-story houses with a lightweight roof, one-story timber houses, and two-story houses built from multiple materials.  With the development of more modules that can cater to more typologies of homes, we can cover a more significant portion of the market.
Figure 2. Visiting a house in the Philippines with a loan officer of Kasanagaka (local MFI).
I had the chance to visit an MFI client in Southville, Rodriguez, Rizal. The requirements and scope of work determined previously for this client’s house by the MFI loan officer were very different from the type of intervention the homeowner was expecting. Many factors could have contributed to these differences. However, in my opinion, loan officers require more training and improved, user-friendly tools to ensure that a scope of work is generated that is consistent with the homeowner’s desires.
To conclude this blog, I believe that the approach and strategy adopted by Build Change to promote safer housing and better construction practices is correct, given the lack of government involvement in informal housing vulnerability. Homeowners committed to having a safer house play a key role in promoting better construction practices among local builders.
Improving construction practices is a long road, but it is the only way to ensure safer housing on a large scale, years and decades into the future. This aligns with Build Change’s mission to save lives and significantly reduce injuries and economic losses in earthquakes and windstorms. Additionally, becoming involved with the retrofitting of vulnerable houses can be a source of growth for MFIs, allowing them to reach more homeowners. That said, Build Change must continue to help MFIs with the technical support, the development of the tools, and the training of loan offices to achieve our final goal.
  The post The Role of Microfinance Institutions in Build Change’s Retrofitting Strategy appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/07/the-role-of-microfinance-institutions-in-build-changes-retrofitting-strategy/
The Role of Microfinance Institutions in Build Change’s Retrofitting Strategy published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Designing Resilience: NEESWood Capstone a Decade Later
In 2009, Simpson Strong-Tie participated in an unprecedented research event to highlight the importance of earthquake-resistant wood construction.
The event, the world’s largest earthquake test, was a collaborative Network for Earthquake Engineering Simulation project. It teamed academics, engineers, and industry researchers from around the world to subject a structure to what engineers refer to as the “maximum considered event” (MCE), a large, rare earthquake projected to occur, on average, approximately every 2500 years.
youtube
The test featured a full-scale, seven-story wood-framed condominium tower. The 40′ by 60′ tower included 23 one- and two-bedroom living units and two ground-level retail shops. It was built on the “E-Defense” (Earth-Defense) shake table in Miki City, Japan.
The tower, which weighed nearly 800,000 lb., was engineered with Simpson Strong-Tie solutions. The first floor was outfitted with steel special moment frames using Yield-Link® technology, and running along the height of the building above the steel frame were 63 Strong-Rod® anchor tiedown system (ATS) continuous rods securing the shearwalls. Throughout the building, our connectors secured the critical components of the seven-story structure.
The building was subjected to five tests — all modeled on the 1994 Northridge earthquake ground motions recorded at Canoga Park.
Phase 1: Seven-story structure
Test One: 60% of Northridge ground motion.
Test Two: 140% of Northridge ground motion.
After successful Phase 1 testing, the first-story steel SMFs were braced to remove their participation, effectively creating a six-story wood-only structure.
Phase 2: Six-story structure
Test Three: 60% of Northridge ground motion.
Test Four: 140% of Northridge ground motion.
Test Five: Intensity increased to 180% of Northridge ground motion (the MCE intensity).While there is not a direct correlation between MCE-level shaking and earthquake magnitude, shaking at that level could be thought of as the equivalent of perhaps a 7.5 magnitude event.
Colorado State University professor John Van De Lindt developed many of the performance-based building design procedures used on the NEESWood Capstone test. In a National Science Foundation webcast recorded shortly after the historic test, Van De Lindt said, “I think we had a very successful test. Basically, there was a 2,500-year earthquake we subjected the building to and it wound up [ . . . ]performing very, very well. We were expecting moderate damage, but it turned out that we had very, very light damage to the building. So in the end, after going in and inspecting, I think we proved exactly what we set out to prove.”
What Is Performance-Based Building Design?
Steve Pryor, Advanced Research manager at Simpson Strong-Tie, explained that the goal of this project was to “prove performance-based design can work to make wood structures behave reliably in an earthquake to whatever performance state is specified in the design.”
The basic concept of performance-based building design can be traced all the way back to ancient Babylonia. Hammurabi’s Code states, “a house should not collapse and kill people.”
Of course, the idea has evolved in the 38 centuries since someone chiseled King Hammurabi’s code into black basalt. The clearest definition came in 1982, in a paper by E.J. Gibson titled Working with the Performance Approach in Building. Gibson writes, “first and foremost, the performance approach is [. . . ] the practice of thinking and working in terms of ends rather than means. [ . . . ] It is concerned with what a building or building product is required to do, and not with prescribing how it is to be constructed.”
The NEESWood Capstone test was unique because it focused on wood. Historically, performance-based building design has been used primarily on steel and concrete projects. Van De Lindt explained, “This [design] has been developed for steel and concrete, and this is really the first time that there’s been any major development in this for wood structures. So, what I see is probably major developments over the next six months to two years in the design code. The [wood construction] industry within the US will be pushing to have buildings be five, six, even seven stories throughout the Pacific Northwest and all around the US as a result of this project.”
Pryor said, “It’s one thing to have a computer with high-powered processing project the results of a design, but until the rubber meets the road you don’t really know what’s going to happen. The project proved we can build a seven-story steel- and wood-framed structure, shake it hard, and have very little damage.”
Impact of the NEESWood Capstone Project
The NEESWood Capstone Project is still informing design innovation. On July 24, 2019, Simpson Strong-Tie is hosting a symposium in Honolulu called “The NEESWood Capstone Project a Decade Later: What Have We Learned and Where Are We Going?”
The event will bring together some of the key players from the NEESWood Capstone Project to discuss how the project has informed seismic design of wood buildings and explore the future of wood construction. Pryor is lead organizer of the event. He said “The old idea is that just avoiding collapse is good enough. We can do better than that. I would like for people to come away knowing there are better ways to design that go beyond building to the code minimum. We can implement design and construction that reduce damage, save lives, and increase resiliency.”
We still have seats available for this historic discussion. Register here.
Full agenda below:
When: Wednesday July 24, 2019
Where: East-West Center (Adjacent to University of Hawaii campus)
Hawaii International Conference Center at Jefferson Hall (Asia Room) 1777 East-West Road Honolulu, HI 96848
Registration and Continental Breakfast Introductions (Pryor)
Review of the NEESWood Capstone Design and Test Program (Prof. John van de Lindt)
Overview of The NEESWood Project
Industry Collaboration by Simpson Strong-Tie
Performance-Based Seismic Design for Wood
Lessons Learned about Mid-Rise Woodframe Buildings
How high can (or should) we go?
Mass Timber in Japan (Hiroshi Isoda)
Recent developments and testing in JapanBreak
NHERI Tall Building and Mass Timber (Shiling Pei)
Mass Timber Opportunities and Existing Solutions (including connectors)
New IBC Fire Provisions
Lunch – Guest Speaker: Ian Robertson
NEES Tsunami Research and its Impact on US Tsunami Design Requirements
NEHRI Tall Building and Mass Timber Continued
NHERI TallWood Two-Story Preliminary testing in 2017
NHERI TallWood Test Planning for the 10-story PT Rocking Wall Building
Future of Design: Performance Based Design -> Resilience Based Design (John van de Lindt)
From DDD approaches to Resilience-Based Design of Tall Wood Buildings
Break
Thinking Big: Changing Cities into Forests (Tachibana)
Sumitomo Forestry’s plan for a 70 story wood structure, the W350 Tower.
Closing Panel: What’s next?
  The post Designing Resilience: NEESWood Capstone a Decade Later appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/07/designing-resilience-neeswood-capstone-a-decade-later/
Designing Resilience: NEESWood Capstone a Decade Later published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Attaching a Deck Ledger to a Home Through Brick or Masonry Veneer — the BVLZ Solution
Brick or masonry veneer has traditionally posed a problem to homeowners and contractors seeking to attach a deck to a home without removing large portions of the veneer or siding. No longer is that the case, thanks to the innovative BVLZ brick ledger connector from Simpson Strong-Tie. In this post, Rachel Holland, P.E., an R&D structural engineer at Simpson Strong-Tie, explains the research and insights that went into testing and developing this revolutionary connector.
When a homeowner with a brick veneer home wants a deck, how do you safely add outdoor living space? Did you know that the building codes do not allow for the brick veneer to carry any load except for the weight of the brick above it?
Because of these code provisions set forth in the IRC and DCA6, it’s difficult to attach a deck to a structure without either removing large portions of brick, as is required by some products available on the market, or building a freestanding deck. But even a freestanding deck comes with its own set of challenges. Many times the deck posts obstruct downstairs windows and doors. In addition, ensuring the new deck post footing is in undisturbed soil can be challenging. Often, that soil is located much deeper than one would guess, especially if there is a basement, because the soil adjacent to a house is disturbed.
The riddle of how to safely add a deck to a brick veneer home has been difficult to solve for a long time. After hearing the challenges our customers face, we set out to develop a new solution that would bypass the brick completely and attach the deck safely to the structural framing behind the brick veneer. We spent more than a year researching and designing multiple iterations of various prototypes in order to develop a part that would meet our criteria. From all that trial and error, however, the BVLZ brick ledger connector was born. There are many field variables that made the design of this new product very challenging, but it was that much more rewarding when we were finally able to hit upon the solutions. For example, across the country, existing airspaces between the veneer and the framing vary, brick sizes also vary, and the list of variables goes on. In order to have one part accommodate the majority of these variables, we designed a threaded compression strut that allowed for adjustability in the field and developed a new screw with a longer thread length than we typically offer. There are additional challenges involved with the fact that this connector will attach to, and depend on existing framing. By orienting the screws at an upward angle, we were able to impose a tension force at the top of the rim, and then the compression strut stops the ledger from bearing in on the brick. These two components act in a truss-like manner. Because cross-grain bending is unpredictable, we needed to ensure that the existing framing conditions could support this type of load.
Assembly testing of the BVLZ.
We determined allowable loads for the BVLZ using the lowest of the following values:
Lowest ultimate load of three tests (or average of six) with a safety factor of three
Average load at ⅛” deflection
Calculations per American Wood Council National Design Specification for Wood Construction (NDS)
We tested the BVLZ in accordance with AC13 both as a single connection and as a component of a deck system. Here you can see one of the assembly tests with the deck on the right. On the left is an existing interior floor system modeling when floor joists are parallel to the rim board. We discuss testing of wood connectors in more detail in this blog post. For the BVLZ, we evaluated the shear and withdrawal capacity of screws into the rim board with single fastener testing in accordance with AC233.
BVLZ free-body diagram
We calculated the capacity of the Strong-Drive® SD Connector screws for transferring the load from the ledger into the BVLZ connector, and the shear and withdrawal capacity of the Strong-Drive SDWH Timber-Hex screws that transfer the load from the BVLZ ledger plate into the rim board. We also calculated the bearing of the compression strut on a solid rim and wood structural panel (WSP) wall sheathing in front of the rim. The BVLZ is code listed in IAPMO UES ER-280.
From all of the testing and calculations that were performed, we found that the minimum governing load for an engineered design is the bearing capacity of the compression strut on the rim or WSP wall sheathing. In order to maximize the load we needed to increase the diameter of the strut — but again there was a fine balance to uphold, because we wanted to allow the end user to drill reasonably sized holes in the brick veneer. The BVLZ allows the deck to attach to the structure without bearing on the veneer. Through calculations and multiple assembly tests, we confirmed that the strength of the interior framing and fastening was critical to performance. Regardless of how strong we made our part, the framing of the existing building determines the maximum deck load that can be supported by the BVLZ. Therefore, the make-up of the existing structural framing is critical. This connector requires contractors to do some investigative work up front. They need to look into what exists behind the brick. Is there WSP sheathing on the wall? How thick is it? Looking further, where is the rim board of the house? What size is it? What material is it? How is the rim attached to the rest of the framing? Is there interior floor sheathing? How thick is it? How is it attached to the framing? Is there access to the rim from the interior of the home? Answering these questions for each project is essential to understanding whether and how the BVLZ should be used.
Once all the initial work is done, we provide you with the BVLZ allowable downloads so that an engineered design can be completed. If you are following the IRC requirements for deck building, we provide four different prescriptive spacing tables to help you space the BVLZs on your deck ledger.
Prescriptive spacing table without wood structural panel (WSP) on the wall
Prescriptive spacing table with wood structural panel (WSP) on the wall
Prescriptive spacing table with a reinforced rim board and without wood structural panel (WSP) on the wall
Prescriptive spacing table with a reinforced rim board and wood structural panel (WSP) on the wall
These tables list the maximum on-center spacing for the BVLZ to support different deck spans. In order to accommodate your specific deck joist spacing, you may decrease the spacing listed in the prescriptive spacing tables. The tables require that the existing framing meets the IRC framing requirements. Assuming the required pre-work is completed and the installation learning curve has been met (see our installation instructions here to help you get started), this new deck ledger connector is a code-listed solution that allows homeowners the opportunity to build their dream deck and enjoy outdoor living space without infringing on the view or patio space downstairs.
Learn More About the BVLZ in Our Upcoming Free Webinar
Tumblr media
Join us live on July 10 at 11:00 a.m. PT for an interactive webinar on proper methods for deck ledger connections, which will include a discussion on using the BVLZ to safely add a deck to an existing structure with masonry veneer. Attendees will also have an opportunity to ask questions during the event. Continuing education units will be offered for attending this webinar.
Learn More!
The post Attaching a Deck Ledger to a Home Through Brick or Masonry Veneer — the BVLZ Solution appeared first on Simpson Strong-Tie Structural Engineering Blog –.
from Simpson Strong-Tie Structural Engineering Blog – http://seblog.strongtie.com/2019/06/attaching-deck-ledger-home-brick-masonry-veneer-bvlz-solution/
Attaching a Deck Ledger to a Home Through Brick or Masonry Veneer — the BVLZ Solution published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
It’s a fact: many car alarms blast away at 125 decibels — that’s five decibels louder than a jet engine! Enter to win Pella Lifestyle Series windows with optional sound control features and help keep this alarming statistic from stealing your peace: http://bit.ly/PellaSweepstakes …pic.twitter.com/KkPLhKR8ad
It’s a fact: many car alarms blast away at 125 decibels — that’s five decibels louder than a jet engine! Enter to win Pella Lifestyle Series windows with optional sound control features and help keep this alarming statistic from stealing your peace: http://bit.ly/PellaSweepstakes … pic.twitter.com/KkPLhKR8ad
Tumblr media
from Twitter Search / Pella_News https://twitter.com/Pella_News/status/1136317317929938944
It’s a fact: many car alarms blast away at 125 decibels — that’s five decibels louder than a jet engine! Enter to win Pella Lifestyle Series windows with optional sound control features and help keep this alarming statistic from stealing your peace: http://bit.ly/PellaSweepstakes …pic.twitter.com/KkPLhKR8ad published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Home window screens can greatly enhance your living experience by creating a fresh, open-air environment. We’ve rounded up our picks for window screens that will have you enjoying the sounds, sights and smells of summer in no time. http://bit.ly/2HTCVfE pic.twitter.com/g6W6Py87aE
Home window screens can greatly enhance your living experience by creating a fresh, open-air environment. We’ve rounded up our picks for window screens that will have you enjoying the sounds, sights and smells of summer in no time. http://bit.ly/2HTCVfE  pic.twitter.com/g6W6Py87aE
Tumblr media
from Twitter Search / Pella_News https://twitter.com/Pella_News/status/1135962040705662976
Home window screens can greatly enhance your living experience by creating a fresh, open-air environment. We’ve rounded up our picks for window screens that will have you enjoying the sounds, sights and smells of summer in no time. http://bit.ly/2HTCVfE pic.twitter.com/g6W6Py87aE published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
We’re two Mondays away from putting New York on Mute. Watch it unfold on our Instagram and Facebook stories on June 17.pic.twitter.com/UZdhK54hha
We’re two Mondays away from putting New York on Mute. Watch it unfold on our Instagram and Facebook stories on June 17. pic.twitter.com/UZdhK54hha
Tumblr media
from Twitter Search / Pella_News https://twitter.com/Pella_News/status/1135637336228843525
We’re two Mondays away from putting New York on Mute. Watch it unfold on our Instagram and Facebook stories on June 17.pic.twitter.com/UZdhK54hha published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
When it comes to gaining more living space you’ve got to think outside the door. Pella Scenescape patio doors open up your home to new possibilities. http://bit.ly/Scenescape pic.twitter.com/i67Lqxy9uM
When it comes to gaining more living space you’ve got to think outside the door. Pella Scenescape patio doors open up your home to new possibilities. http://bit.ly/Scenescape  pic.twitter.com/i67Lqxy9uM
Tumblr media
from Twitter Search / Pella_News https://twitter.com/Pella_News/status/1135577323682574336
When it comes to gaining more living space you’ve got to think outside the door. Pella Scenescape patio doors open up your home to new possibilities. http://bit.ly/Scenescape pic.twitter.com/i67Lqxy9uM published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
Does hurricane season hit home for you? Impact-resistant HurricaneShield windows add extra protection from damaging winds and flying debris. http://bit.ly/HurricaneShield pic.twitter.com/iihT4odS5v
Does hurricane season hit home for you? Impact-resistant HurricaneShield windows add extra protection from damaging winds and flying debris. http://bit.ly/HurricaneShield  pic.twitter.com/iihT4odS5v
from Twitter Search / Pella_News https://twitter.com/Pella_News/status/1134912781621321729
Does hurricane season hit home for you? Impact-resistant HurricaneShield windows add extra protection from damaging winds and flying debris. http://bit.ly/HurricaneShield pic.twitter.com/iihT4odS5v published first on your-t1-blog-url
0 notes
erichhughesiii · 6 years ago
Text
We love how Benchmark Builders used black to create bold contrast to this home’s wood siding and natural stone.  #PellaInspiredpic.twitter.com/bYw5z3aRgL
We love how Benchmark Builders used black to create bold contrast to this home’s wood siding and natural stone.  #PellaInspired pic.twitter.com/bYw5z3aRgL
Tumblr media
from Twitter Search / Pella_News https://twitter.com/Pella_News/status/1134504932986560512
We love how Benchmark Builders used black to create bold contrast to this home’s wood siding and natural stone.  #PellaInspiredpic.twitter.com/bYw5z3aRgL published first on your-t1-blog-url
0 notes