M. R. Pittman Group, LLC crews continue to drive 60-foot pilings into the ground in preparation to build the 2-story pumphouse. Rough grade is expected to be achieved before the end of the month and then prep will begin for underground drainage and irrigation work.
The City Of NOLA
•
•
roadworknola #nolaprogress #greeninfrastructure #nolaprogress #mirabeauwatergarden #hazardmitigation #cityofneworleans #construction #infrastructure
0 notes
SPOTLIGHT ON MUNICIPAL & TRAFFIC COURT OF NEW ORLEANS RENOVATION: McDonnel is handling an overall restoration of this three-story building of approximately 90,000 sq. ft. The result will include 7 new courtrooms with all new millwork, interview rooms and holding cells, offices, both new and refurbished elevators, and more!
NewOrleans #McDonnelMomentum #ConstructionSolutions
0 notes
IN PROGRESS: Roof Guardian in Ponchatoula! This will be a 7,320 SF metal building that will be used for office space. Check back for updates!
kentdesignbuild #leadbuildserve #commercialconstruction #construction #constructinoupdate #metalbuilding
0 notes
416 Chartres St · Renovation (Non-Structural) · Ref Code:SKNG1J
Type: Renovation (Non-Structural)
Applicant: Hodgins Julia
Status: Application Submitted
Date Filed: 5/14/2024
Closed: No
Description:: This application is intended for VCC review of 416 Chartres. The building, which is currently out of use, will function as a prep space for the Historic New Orleans Collection and will require a full interior renovation, including systems. At the buildings exterior, the majority of the building facades will maintain their historic conditions, with minor updates to provide a more protected building enclosure. The scope is limited to replacing all existing openings at the courtyard and three level 1 openings along the front façade, slab manipulation to accommodate ADA entry, a new opening along the neighboring alleyway, and VCC compliant lighting.
Applicant: Hodgins Julia
Contractors: Ryan Gootee General Contractors
Expires: 11/14/2024 4:59:50 PM
Division: SP
Subdivision: French Quarter
Council District: C
Area: 0
Next Status: Zoning Review
Next Status Date: 5/14/2024 4:59:51 PM
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees: 18090.00
Unpaid Fees: 18090.00
Final Date:
Days Open: 0
Days Issued: 0
Filing Date: 5/14/2024 4:59:51 PM
0 notes
624 Bienville St · Renovation (Non-Structural) · Ref Code:0DRS0N
Type: Renovation (Non-Structural)
Applicant: Ashley Banks
Status: Application Submitted
Date Filed: 5/16/2024
Closed: No
Description:: This project consists of cosmetic upgrades to the interior of the existing parking garage at the 1st floor only. Columns to be wrapped with decorative treatments, new light fixtures, new mosaic tile at hotel entry vestibule, and all surfaces are to be re-painted.
Applicant: Ashley Banks
Contractors: SCNZ Architects, Scnz Architects
Expires: 11/16/2024 3:14:57 AM
Division: SP
Subdivision: French Quarter
Council District: C
Area: 0
Next Status: Zoning Review
Next Status Date: 5/16/2024 3:14:58 AM
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees: 1890.00
Unpaid Fees: 1890.00
Final Date:
Days Open: 0
Days Issued: 0
Filing Date: 5/16/2024 3:14:58 AM
0 notes