Tumgik
Text
OPS 571 Week 6 Quiz - Latest
OPS 571 Week 6 Quiz - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-6-quiz-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 6 Quiz - Latest
1.) Which of the following are examples of Goldratt’s Rules of Production Scheduling?
 An hour saved at a bottleneck is a mirage
 Nonbottlenecks govern throughput
 Utilization and activation are the same
 Balance flow, not capacity
 2.) According to the theory of constraints which of the following can be a CCR?
Product design
An employee
Factory layout
A customer
 3.) The Shingo approach to quality control depends on which of the following?
Use of statistically based approaches to quality control
Use of source inspection on 100% of the items produced
Extensive use of control charts
​Use of a sophisticated method of acceptance sampling
 4.) Statistical Process Control (SPC) and data from the actual process to statistically monitor the process over time are employed during which step of the DMAIC cycle?
Define
Control
Improve
Measure
 5.) According to the theory of constraints, which of the following is an OPERATIONAL measurement that can be used to measure the firm's ability to make money?
Operating revenue
Unit cost
Inventory
Net Profit
 6.) The DMAIC cycle of Six Sigma is similar to which of the following quality management topics?
External benchmarking
ISO 9000
SERQUAL
Continuous improvement
 7.) The Shingo system of quality control relies heavily on fail-safe procedures or devices called what?
Checklists
DPMO’s
CTQs
Poka-yokes
 8.) Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology?
Analyze
Define
Improve
Measure
 9.) According to the theory of constraints which of the following is a FINANCIAL measurement that can be used to measure the firm's ability to make money?
Sales
Cash flow
Inventory
Operating expenses
 10.) Goldratt’s theory of constraints (TOC) could be restated using which of the following?
​A system with constraints will not be able to achieve its goals
​Any system is limited in achieving more of its goals by a very small number of constraints
​A system constraint cannot be identified and thus cannot be improved
Continuous adjustments after a constraint problem is solved will cause more problems
 11.) The idea that statistical methods of quality control, including six-sigma, does not prevent defects, is central to what alternative quality system?
SQC methods
Deming PDCA cycle
DMAIC cycle
Shingo System
 12.) A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the following?
Install more efficient equipment where capacity is less than the demand.
Increase labor equally throughout the system.
Increase the capacity of a nonbottleneck resource.
Increase the idle time of a capacity-constrained resource in the system.
 13.) Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?
Do not modify a process after improvement of a constraint is achieved.
Isolate constraints to reduce the constraint’s capacity.
Align the whole system to support processes prior to the constraint.
Identify system constraints that prevent the system from achieving its goal.
 14.) According to Goldratt, which of the following is defined as “any resource whose capacity is less than the demand placed on it”?
Bottleneck resource
Buffer resource
Nonbottleneck resource
Capacity-constrained resource
 15.) According to the theory of constraints, which of the following would be included in the Throughput operational measurement?
Work in process
Finished goods
Goods sol
0 notes
Text
OPS 571 Week 6 Learning Team Process Improvement Presentation - Latest
OPS 571 Week 6 Learning Team Process Improvement Presentation - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-6-learning-team-process-improvement-presentation-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 6 Learning Team Process Improvement Presentation - Latest
  Write a paper which includes the following.
•    Identify which ISO standards apply to Riordan Manufacturing
•    Using the Six Sigma DMAIC process, develop a new process design for the production of the Riordan electric fans. Be sure to take advantage of any global opportunities available to Riordan, such as lower labor costs.
•    Describe the bottlenecks that may occur in the new process.
•    Identify three TQM tools that may be used for ongoing process improvement. Be sure to describe who will use the tool, when it will be used, and what interval and how it will lead to process improvement.
•    A project plan including: A schedule including project goals, a schedule, roles and responsibilities and deliverables.
•    An implementation plan, including a Gantt chart of the process design for the Riordan electric fans.
•    No more than 1500 words.
•    Consistent with APA format.
Click the Assignment Files tab to submit your assignment.
0 notes
Text
OPS 571 Week 5 Quiz - Latest
OPS 571 Week 5 Quiz - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-5-quiz-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 5 Quiz - Latest
 1.)Which is the international standard for quality management for automotive industry suppliers of production parts, materials, and services?
AS 9000
TL 9000
QS 9000
AI 9000
 2.) ISO 9000 is primarily concerned with what type of quality management standards?
Suppliers to the automotive or telecommunication industries
Business-to-business commerce
Environmental
Business-to-consumer transactions
 3.) What is a reason that a company may pursue ISO-9000 certification?
Certification is required by most insurance agencies
Certification is required by the European Community to show that a firm has used appropriate standards
Certification provides a company with unlimited legal liability protection
Certification provides competitive advantage in the global markets for suppliers
 4.) What form of ISO 9000-certification is the final requirement before a company may be registered and recorded as having achieved ISO 9000 status?
Third party
First party
Second party
Fourth party
 5.) Who is responsible for performing the first-party certification audit for a supplier firm?
Firm
Suppliers
Certifying agency
Customer
 6.) What is one analytical tool common to all quality improvement programs?
Kaizen
Pareto charts
Continuous improvement
Management by fact
 7.) An opportunity flow diagram would best fit in which DMAIC category?
Measure
Define
Analyze
Improve
 8.) What is the certification when a qualified national or international standards body or similar certifying agency audits and certifies that a company is ISO 9000-compliant?
Fourth party
First party
Second party
Third party
 9.) A fishbone diagram might be found in which DMAIC category?
Analyze
Measure
Define
Improve
 10.) What is the international quality management standard for quality management and assurance that is primarily concerned with quality of air, water, and soil?
ISO 2000
ISO 14000
QS 9000
ISO 9000
  443":{��|H��
0 notes
Text
OPS 571 Week 5 Individual Project Management Recommendation - Latest
OPS 571 Week 5 Individual Project Management Recommendation - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-5-individual-project-management-recommendation-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 5 Individual Project Management Recommendation - Latest
  Review the Project Management email. 
Write an email response in which you address the following points: 
Determine which     project might be implemented and why (e.g. feasibility study, breakeven     analysis, etc).
Describe the     five phases of a project
Describe the key     deliverables associated with the selected project(s).
Click the Assignment Files tab to submit your assignment.
   �
0 notes
Text
OPS 571 Week 5 - NEW
OPS 571 Week 5 - NEW
IF You Want To Purchase A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-5-new
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 5 DQ 1
"If line employees are required to work on quality improvement activities, their productivity will suffer." Discuss.
 OPS 571 Week 5 DQ 2
Is the goal of Six Sigma realistic for services such as Amazon?
 OPS 571 Week 5 DQ 3
Watch the "Quality Management and Certificate" of the Supply Chain Management Video Lecture Series.
 OPS 571 Week 5 Individual Project Management Recommendation
Review the Project Management email. 
Write an email response in which you address the following points: 
Determine which     project might be implemented and why (e.g. feasibility study, breakeven     analysis, etc).
Describe the     five phases of a project
Describe the key     deliverables associated with the selected project(s).
Click the Assignment Files tab to submit your assignment.
 OPS 571 Week 5 Learning Team Reflection
Discuss the following:
•    What are TQM and ISO?
•    How might TQM and ISO be used to improve an organization?
•    What are the benefits and challenges each?
•    What is the role of a Quality Control department in relation to either TQM or ISO?
 Prepare a 350- to 1,050-word paper detailing the findings of your discussion.
Click the Assignment FIles tab to submit your assignment. 
 OPS 571 Week 5 Quiz
1.)Which is the international standard for quality management for automotive industry suppliers of production parts, materials, and services?
AS 9000
TL 9000
QS 9000
AI 9000
 2.) ISO 9000 is primarily concerned with what type of quality management standards?
Suppliers to the automotive or telecommunication industries
Business-to-business commerce
Environmental
Business-to-consumer transactions
 3.) What is a reason that a company may pursue ISO-9000 certification?
Certification is required by most insurance agencies
Certification is required by the European Community to show that a firm has used appropriate standards
Certification provides a company with unlimited legal liability protection
Certification provides competitive advantage in the global markets for suppliers
 4.) What form of ISO 9000-certification is the final requirement before a company may be registered and recorded as having achieved ISO 9000 status?
Third party
First party
Second party
Fourth party
 5.) Who is responsible for performing the first-party certification audit for a supplier firm?
Firm
Suppliers
Certifying agency
Customer
 6.) What is one analytical tool common to all quality improvement programs?
Kaizen
Pareto charts
Continuous improvement
Management by fact
 7.) An opportunity flow diagram would best fit in which DMAIC category?
Measure
Define
Analyze
Improve
 8.) What is the certification when a qualified national or international standards body or similar certifying agency audits and certifies that a company is ISO 9000-compliant?
Fourth party
First party
Second party
Third party
 9.) A fishbone diagram might be found in which DMAIC category?
Analyze
Measure
Define
Improve
 10.) What is the international quality management standard for quality management and assurance that is primarily concerned with quality of air, water, and soil?
ISO 2000
ISO 14000
QS 9000
ISO 9000
0 notes
Text
OPS 571 Week 4 Quiz - Latest
OPS 571 Week 4 Quiz - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-4-quiz-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 4 Quiz - Latest
  1.) A work breakdown structure is
a hierarchy of tasks, subtasks, and work packages
a Cost and Performance tracking schedule
a structure that is incompatible with the Critical Path Method
a simple list of the activities making up a project
 2.) The vertical axis on a Gantt chart is usually which of the following?
Activities
Time
Cost
Profit
 3.) Which of the following identifies a key principle of Reengineering?
Organize around tasks.
Downsize (lay-off) workers and do the same amount of work as before.
Merge information-processing work into the real work that produces the information.
Capture information both at the source and where it is interpreted.
 4.) At the onset, a project originates as which of the following?
A Gantt chart
A series of milestones
Critical path method (CPM)
A statement of work (SOW
 5.) Consulting firms typically use which of the following techniques to plan and monitor the engagements of the firm or specific projects?
CPM/PERT
Qualitative forecasting
Materials requirements planning (MRP)
Quantitative layout
 6.) A Responsibility Chart specifically identifies which of the following?
Planning the tasks for a project
Customer satisfaction
Commitment to quality
Level of inventory
 7.)Which of the following would be the result of subdividing a project?
Job orders
Work events
Job categories
Tasks
 8.) Which project progress technique includes the essential features of a project plan, budgeted cost of work scheduled and budgeted cost of work performed?
Earned value management
Critical path method
Cost analysis
Gantt chart
 9.) An example of a graphic project report utilized within project management is:
Project proposal
Equipment and supplies chart
Humphrey chart
Cost and performance tracking schedule
0 notes
Text
OPS 571 Week 4 Learning Team Supply Chain Design Paper - Latest
OPS 571 Week 4 Learning Team Supply Chain Design Paper - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-4-learning-team-supply-chain-design-paper-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 4 Learning Team Supply Chain Design Paper - Latest
 Review the Riordan Manufacturing Virtual Organization. 
Write a paper of no more than 1,400-words that includes the following: 
Determine     Riordan's manufacturing strategy (chase, level, or combination) and     explain its benefits
Create a process     flow diagram for the electric fan supply chain
Select two     metrics to evaluate performance of the electric fan supply chain
 Type of      relationship
 Supplier      location, size of company, and financial stability
 Metrics used to      measure supplier performance (on-time delivery, defects, etc)
 Supplier      improvement strategies 
Describe how     lean production principles may be used to maximize the efficiency and     effectiveness of the electric fan supply chain process
Select a     business forecasting technique (qualitative or quantitative) for the     electric fans and describe the forecasting process to be used at Riordan
Create a sales     forecast for electric fans using selected techniques
 The      determination of inventory requirements of the electric fans component      parts and finished goods
 The selection      of an appropriate inventory system (fixed order quantity, two bin method,      etc.) to meet inventory requirements
 Click the Assignment Files tab to submit your assignment. Begin working on the Week Six assignment. In Week Six, you propose and implement new process design and supply chain processes for the manufacturing of Riordan's electric fans.
   ���|,#�y
0 notes
Text
OPS 571 Week 3 Quiz - Latest
OPS 571 Week 3 Quiz - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-3-quiz-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 3 Quiz - Latest
 1.) When considering outsourcing, what should firms tend to avert?
Allowing outsourcing to develop into a substitute for innovation
Losing control of non-core activities
Giving the outsourcing partner opportunities to become a strong competitor
Allowing employees transferred to the outsourcing partner to rejoin the firm
 2.) What is the important starting point in developing a capacity plan?
Predicting the ability of suppliers to meet needs
Determining the effective capacity of a resource over some period of time.
Predicting the needs of customers
Understanding key components of the supply chain
 3.) Which of the following is an input to the master production schedule (MPS)?
Bill of materials
The aggregate plan
Exception report
Inventory records file
 4.) Which of the following is an input file necessary to run an MRP program?
Planned-order schedules
Bill of materials (BOM) file
Exception reports
Quality management report
 5.) Which of the following forecasting methods is very dependent on selection of the right individuals who will judgmentally be used to actually generate the forecast?
Simple moving average
Time series analysis
Delphi method
Weighted moving average
 6.) The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?
Inventory on hand and financing costs for that inventory
Workforce levels and inventory on hand
The workforce level and the degree of automation
The strategic plan and the products available for sale
 7.) Which of the following is an essential resource that flows through a hospital supply chain?
Patients
Medicine
Doctors and Nurses
Information
 8.) In business forecasting, what is usually considered a short-term time period?
Four weeks or less
Six months or more
Less than three months
More than three months
 9.) Which of the following is an input file necessary to run an MRP system?
Planned order schedule
Exception report
Inventory records file
Computer-aided-design files
 10.) Which of the following is most closely related to the reason a firm might implement MRP?
So they can order the right parts
So they can order parts sufficient for immediate use
To assure appropriate quality levels
So they can insure that parts to arrive D. To assure appropriate quality levels
 11.) Which of the following is one of the main purposes of a MRP system?
Decrease labor requirements.
Educate personnel in basic work rules.
Determine the materials needed.
Stimulate the work force.
 12.) The text mentions several common approaches to use when developing a strategy to close a capacity gap (where utilization of a resource exceeds capacity available). Which of the following is among the common approaches mentioned?
New construction
Hire more employees
Closing a related department
Transferring capacity from other units
 13.) Which of the following is a perpetual system for inventory management?
Fixed-time period
P model
Fixed-order quantity
First-in-first-out
 14.) Which of the following is considered a pure production planning strategy?
Stable workforce, variable work hours
Variable workforce, stable work hours
Lag demand
Level playing field
 15.) In conducting aggregate operations planning there are a number of required inputs. Which of the following are inputs considered most external to the firm?
Current physical capacity of the organization
Raw material availability and competitor's behavior
Internal inventory levels and market demand
Subcontractor capacity and inventory levels
 16.) In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
Future demand
Cyclical elements
Inconsistent demand
Past demand
 17.) Which of the following is an input to the master production schedule?
Prototype products from product development
Aggregate component schedule
Peg reports from factory records
Forecasts of customer demand
 18.) What is the effect of the lack of synchronization among supply-chain members?
Bullwhip effect
Continuous replenishment
Metcalf's Law
Forward buying
 19.) Which of the following is one of the categories of manufacturing inventory?
Work-in-process
Economic Order Inventory
JIT Inventory
Quality units
 20.) Which is the most challenging kind of supply chain to manage according to Hau Lee?
Risk-hedging
Agile
Efficient
Erratic
 21.) What is another name for the fixed-order quantity inventory model?
Cycle counting model
The ABC model
Economic order quantity model
Periodic replenishment mode
  �_˔|Q���
0 notes
Text
aOPS 571 Week 3 Individual Process Designs and Supply Chains - Latest
aOPS 571 Week 3 Individual Process Designs and Supply Chains - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-3-individual-process-designs-and-supply-chains-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 3 Individual Process Designs and Supply Chains - Latest
 Write a paper in which you evaluate the current state of the process you selected in Week Two and summarize the proposed future state. 
Required     Elements:
Evaluate the     efficiency and effectiveness of the process selected in Week Two using the     data collected.
Determine areas     for improvement
Design an     improved process flow chart using an appropriate tool.
Summarize two     items from this improved process.  Include an explanation of how     these items could be used in your personal or professional life to improve     a process.
No more than 700     words
Consistent with     APA format
Click the Assignment FIles tab to submit your assignment. 
0 notes
Text
OPS 571 Week 2 Quiz - Latest
OPS 571 Week 2 Quiz - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-2-quiz-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 2 Quiz - Latest
  1.) In the pull system, which of the following is the partner that begins the process of pulling?
Vendors
Quality control personnel
Customers
Executive management
 2.) Which of the following operations consulting tools are used in the cost impact and payoff analysis stage in the operations consulting process?
SPC tools and bottleneck analysis
Customer surveys and gap analysis
Decision trees and stakeholder analysis
Plant audits and statistical tools
 3.) Which of the following production process terms best describes a stage in a multiple-stage process that limits the capacity of the overall process?
Buffer
Starving
Bottleneck
Blocking
 4.) Which of the following is a principle of reengineering?
Organize around the tasks
Capture information many times, at the source and where it is interpreted
Treat geographically dispersed resources as though they were centralized
Integrate the outcomes of parallel activities
 5.) Which of the following operations consulting tools provide summary performance updates for specific processes and are generally presented in graphical form with color-coding of trend lines and alarms?
Decision trees
Stakeholder analysis
Process dashboards
Responsibility charts
 6.) Which of the following are possible examples of cycle times?
Time that a part waits in queue
Time it takes for an instructor to grade an exam
Time required to produce a batch of parts
Time to set up a new assembly line
 7.) What is the term that refers to “the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of performance, such as cost, quality, service, and speed” (as cited in Jacobs & Chase, 2011, p. 461).
Reengineering
TQM
Operations consulting process
Continuous improvement
 8.) Which of the following is a key metric associated with value stream mapping?
Defects per million operations
Lead time
Product demand
Fixed costs
 9.) Which of the following is one of the major types of stakeholders impacted by most consulting projects?
Board of directors
International government regulators
Suppliers
Other consultants
 10.) Lean production seeks to achieve high volume production using which of the following?
Minimize utilization
Minimize inventory of raw materials
Maximize inventory of work-in-process
Maximize capacity
 11.) In contrast to TQM, what approach seeks radical change through innovation?
JIT distribution
Project management
Reengineering
Lean manufacturing
 12.) In setting up a kanban control system, you need to determine the number of kanban card sets needed. If the average number of units demanded is 1,000 per hour, the lead time to replenish the order for this item is 10 hours, the container size is 5 units, and the safety stock is estimated to be 5% of the expected demand, what is the number of kanban card sets needed?
210
440
1,050
2,100
 13.) Which of the following is a situation that likely will yield economies of scale?
Large factory with dedicated capacity that is able to produce twice the number of units as locally demanded
Factory that fully utilizes dedicated resources for information technology, material handling, and administrative support
Company with factories in multiple countries that produces products for local demand
Factory that produces low volume, customized products
 14.) The basic notion of economies of scale assumes which of the following?
A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate
Total cost of output drops as volume increases
Average cost per unit of output drops as a plant gets larger and volume increases
Two plants can be operated at the same cost as a single plant
 15.) To implement a flow process in developing a lean system, a firm might do which of the following?
Reduce setup/changeover time
Eliminate some fixed costs
Improve capacity utilization
Build product in anticipation of demand
 16.) An advantage of a make-to-stock process is which of the following?
All units of output are unique
Rapid delivery of a standard product
It responds directly to customer orders
It allows the firm to avoid inventory costs
 17.) According to Little’s law, which of the following can be used to estimate inventory?
Set up time times throughput rate
Process velocity times flow time
Process time times cycle time
Throughput rate times flow time
 18.) Which of the following is a factor that causes a diseconomy of scale?
Increased utilization
Increased transportation costs
Increased total operating costs
Increased product value and prices
 19.) If the run time for a batch of parts is 25 minutes on a machine, and the setup time is 75 minutes, which of the following is the operation time?
3 minutes
25 minutes
100 minutes
75 minutes
 20.) Which of the following production process terms best describes the situation when activities in a stage of production must stop because there is no work?
Multiple-stage processing
Starving
Blocking
Buffering
 21.) Which of the following terms refers to a special type of flowcharting tool that is valuable for the development of lean processes?
Kanban production control system
JIT production
Value stream mapping
Kaizen
   0��|2��
0 notes
Text
OPS 571 Week 2 Individual Process Designs and Supply Chains - Latest
OPS 571 Week 2 Individual Process Designs and Supply Chains - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-2-individual-process-designs-and-supply-chains-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 2 Individual Process Designs and Supply Chains - Latest
 This is part one of a two part assignment starting with an introductory look at process design and supply chains.
Identify a company with which you are familiar.  This could be your place of employment, a car wash, a yard service company, and so forth.
Write a paper in which you describe the current state of your selected company's supply chain and an identified process.
Required Elements:
Describe the     company's supply chain
Identify a     process internal to the company that you wish to analyze.
Describe the     process internal to the company that you wish to analyze.
Identify an     appropriate design approach for the process you have chosen.
Create a     high-level AS IS process flow chart using an appropriate tool.
Identify at     least one metric to measure the process and its application (how, what,     when, and who).
Use an     appropriate tool to collect data for each step of the process.
No more than 700     words
Consistent with     APA format
Click the Assignment Files tab to submit your assignment.
  orȓ|UW�-
0 notes
Text
OPS 571 Week 1 Quiz - Latest
OPS 571 Week 1 Quiz - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-1-quiz-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 1 Quiz - Latest
 1.) Poka-yoke is a Japanese term for a procedure that blocks an inevitable mistake from becoming what?
An unidentifiable waste A service defect A new process design flaw A reason for over-production
2 .) For which key organizational functions are tasks and responsibilities identified for all the steps of the generic product development process?
marketing, operations, training, development marketing, design, manufacturing, other strengths, weaknesses, opportunities, threats operations, quality, personnel, finance
3.) A service process design flowchart is referred to as a service blueprint to emphasize what?
The importance of process design The impact of customer service The impact of blueprints The importance of system engineering
4.) Even though they use different models, both the Ritz-Carlton Hotel Group and Nordstrom Department Stores are known for what?
The personal attention they provide their customers A self-service approach to customer service Customer-facing employees who only talk to rich customers Poor customer service
5.) According to the Service-System Design Matrix, sales opportunity has what sort of relationship to production efficiency?
Direct Relationship Equal Relationship Inverse Relationship No Relationship
6.) Which of the following is a good example of a continuous process layout?
A sit-down restaurant An automobile manufacturing plant A home construction site A gas refinery
7.) If an automotive service center has an issue with a car not being clean when returned to a customer, the poka-yoke corrective action might include what?
Leaving the plastic on the seat when returning the car to the customer. Leaving it up to the service tech who took care of the repair to determine if the car is clean An inspection by the person returning the car before the car is seen by the customer. Letting the customer make this determination
8.) Why is the planning phase often referred to as Phase 0 (Zero) of the generic product development process?
This phase is not necessary. This phase is not completed until after the project has been funded. This phase happens before the project is approved. This phase requires $0 to complete.
9.) Using a project layout for building an aircraft, why would you want to place rivets close to or even in the fuselage?
Rivets are small and you don’t want to lose them Rivets should actually be placed farthest away from the fuselage. Rivets are used consistently throughout the construction process Rivets are used one time only in the construction process
10.) Why do many customers like the self-service approach to service design?
It provides the customer with the greatest amount of personal service. It puts the customer in control The customer is always right in this type of system. It gives the customer more opportunity to steal from a company
11.) What happens to production efficiency as the customer exerts more influence on the system?
Production efficiency is decreased Production efficiency is increased There is no effect on production efficiency Production efficiency is eliminated
12.) Permeable systems are characterized by being penetrable by customers via what two forms of contact?
Phone and face-to-face contact Face-to-face and internet contact Internet and mail contact Internet and phone contact
13.) What is a company trying to optimize in the most common approach to developing a workcenter layout?
Movement of material Number of defects Amount of required staff Work shift hours
14.) Some may argue that the production-line approach may not treat the process as a service process, but as what type of process?
A marketing approach A quality approach An operational approach A manufacturing approach
15.) Why would a company want to supply a product to preferred customers during product ramp-up?
Test the shipping process Identify any remaining flaws Get choice shelf positioning Help develop a marketing plan
  ��|
0 notes
Text
OPS 571 Week 1 Individual Process Design Matrix and Summary - Latest
OPS 571 Week 1 Individual Process Design Matrix and Summary - Latest
IF You Want To Purcahse A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-week-1-individual-process-design-matrix-and-summary-latest
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 1 Individual Process Design Matrix and Summary - Latest
  Complete the Process Design Matrix.
Write an executive summary identifying appropriate design approaches for a selected product and service. 
Pick one service     with which you are familiar.  Complete three to five line items such     as production line, self-service, or personal attention approach, on the     Process Design Matrix.  
Pick one product     with which you are familiar.  Complete three to five line items such     as Job shop, batch, assembly line, or continuous flow approach, on the     Process Design Matrix.  
Required Elements:
No more than 700     words
Consistent with     APA format
Submit Matrix with the Executive Summary
Click the Assignment Files tab to submit your assignment.
   ��|�R�
0 notes
Text
OPS 571 Final Exam - Latest 2014
OPS 571 Final Exam - Latest 2014
IF You Want To Purchase A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-final-exam-latest-2014
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Final Exam - Latest 2014
 OPS 571 Final Exam - Latest 2014
 1.Which of the following is considered a major process flow structure?
2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
3.Which of the following is ISO 14000 primarily concerned with?
4. Which is the one correct value stream principle?
5. What is the starting point in developing a capacity plan for a health care operation?
6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?
7.Which of the following is an element that addresses elimination of waste under lean production?
8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:
10. Which of the following is one of the principles of reengineering?
11. Which of the following is a characteristic that can be used to guide the design of service systems?
12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?
13. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T’s used to classify poka-yokes?
14. Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?
15. A project can be segmented into which of the following?
16. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?
17. According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?
18. The ability to rapidly and inexpensively switch production from one product to another enables which of the following:
19. According to the theory of constraints, which of the following financial measurements can be used to measure the firm’s ability to make money?
20. Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?
21. Which of the following is usually included as an inventory holding cost?
22. Which production process term best describes the situation when activities in a stage of production must stop because there is no work?
23. In a Gantt chart the vertical axis represents which of the following?
24. The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following:
25. Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?
26. Which of the following is one of Dr. Eli Goldratt’s rules of production scheduling for optimized production technology?
27. During the implementation of a project, which of the following should be the primary focus of a consulting firm?
28. Which of the following is an analytical tool used in Six-Sigma quality improvement programs?
29. A project manager must consider several components when overseeing the planning process of aggregate operations; specifically, whether such components are factors that are internal or external to the organization. Which of the following factors would be classified as an internal component for an organization?
30. Which of the following is the net requirement using an MRP program if the gross requirement is 10,000 and the inventory on hand is 4,000?
   ad��|*��-
0 notes
Text
OPS 571 Complete Week 6 - NEW
OPS 571 Complete Week 6 - NEW
IF You Want To Purchase A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-complete-week-6-new
IF You Face Any Problem Then E Mail Us At  [email protected]
Week 6
 OPS 571 Week 6 DQ 1
"You don't inspect quality into a product; you have to build it in." Discuss the implications of this statement.
 OPS 571 Week 6 DQ 2
Explain how a nonbottleneck can become a bottleneck.
 OPS 571 Week 6 DQ 3
Watch the "Quality Movement" video in the Supply Chain Management Video Lecture Series.
 OPS 571 Week 6 Learning Team Process Improvement Presentation
Write a paper which includes the following.
•    Identify which ISO standards apply to Riordan Manufacturing
•    Using the Six Sigma DMAIC process, develop a new process design for the production of the Riordan electric fans. Be sure to take advantage of any global opportunities available to Riordan, such as lower labor costs.
•    Describe the bottlenecks that may occur in the new process.
•    Identify three TQM tools that may be used for ongoing process improvement. Be sure to describe who will use the tool, when it will be used, and what interval and how it will lead to process improvement.
•    A project plan including: A schedule including project goals, a schedule, roles and responsibilities and deliverables.
•    An implementation plan, including a Gantt chart of the process design for the Riordan electric fans.
•    No more than 1500 words.
•    Consistent with APA format.
Click the Assignment Files tab to submit your assignment.
 OPS 571 Week 6 Quiz
 1.) Which of the following are examples of Goldratt’s Rules of Production Scheduling?
 An hour saved at a bottleneck is a mirage
 Nonbottlenecks govern throughput
 Utilization and activation are the same
 Balance flow, not capacity
 2.) According to the theory of constraints which of the following can be a CCR?
Product design
An employee
Factory layout
A customer
 3.) The Shingo approach to quality control depends on which of the following?
Use of statistically based approaches to quality control
Use of source inspection on 100% of the items produced
Extensive use of control charts
​Use of a sophisticated method of acceptance sampling
 4.) Statistical Process Control (SPC) and data from the actual process to statistically monitor the process over time are employed during which step of the DMAIC cycle?
Define
Control
Improve
Measure
 5.) According to the theory of constraints, which of the following is an OPERATIONAL measurement that can be used to measure the firm's ability to make money?
Operating revenue
Unit cost
Inventory
Net Profit
 6.) The DMAIC cycle of Six Sigma is similar to which of the following quality management topics?
External benchmarking
ISO 9000
SERQUAL
Continuous improvement
 7.) The Shingo system of quality control relies heavily on fail-safe procedures or devices called what?
Checklists
DPMO’s
CTQs
Poka-yokes
 8.) Identifying critical-to-quality characteristics (CTQs) takes place in which step of the DMAIC methodology?
Analyze
Define
Improve
Measure
 9.) According to the theory of constraints which of the following is a FINANCIAL measurement that can be used to measure the firm's ability to make money?
Sales
Cash flow
Inventory
Operating expenses
 10.) Goldratt’s theory of constraints (TOC) could be restated using which of the following?
​A system with constraints will not be able to achieve its goals
​Any system is limited in achieving more of its goals by a very small number of constraints
​A system constraint cannot be identified and thus cannot be improved
Continuous adjustments after a constraint problem is solved will cause more problems
 11.) The idea that statistical methods of quality control, including six-sigma, does not prevent defects, is central to what alternative quality system?
SQC methods
Deming PDCA cycle
DMAIC cycle
Shingo System
 12.) A bottleneck in a manufacturing process may be targeted and eliminated by employing which of the following?
Install more efficient equipment where capacity is less than the demand.
Increase labor equally throughout the system.
Increase the capacity of a nonbottleneck resource.
Increase the idle time of a capacity-constrained resource in the system.
 13.) Which of the following is a focusing step of Dr. Eli Goldratt's theory of constraints?
Do not modify a process after improvement of a constraint is achieved.
Isolate constraints to reduce the constraint’s capacity.
Align the whole system to support processes prior to the constraint.
Identify system constraints that prevent the system from achieving its goal.
 14.) According to Goldratt, which of the following is defined as “any resource whose capacity is less than the demand placed on it”?
Bottleneck resource
Buffer resource
Nonbottleneck resource
Capacity-constrained resource
 15.) According to the theory of constraints, which of the following would be included in the Throughput operational measurement?
Work in process
Finished goods
Goods sold
    �|�ԙ�
0 notes
Text
OPS 571 Complete Week 4 -NEW
OPS 571 Complete Week 4 -NEW
IF You Want To Purchase A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-complete-week-4-new
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 4 DQ 1
Why would subcontractors for a government project want their activities on the critical path? Under what conditions would they try to avoid being on the critical path?
 OPS 571 Week 4 DQ 2
What was the most complex project that you have been involved in? Give examples of the following as they pertain to the project: the work breakdown structure, tasks, subtasks, and work package. Were you on the critical path? Did it have a good project manager?
 OPS 571 Week 4 DQ 3
Watch the "Project Management" video in the Supply Chain Management Video Lecture Series.
  OPS 571 Week 4 Learning Team Supply Chain Design Paper
Review the Riordan Manufacturing Virtual Organization. 
Write a paper of no more than 1,400-words that includes the following: 
Determine     Riordan's manufacturing strategy (chase, level, or combination) and     explain its benefits
Create a process     flow diagram for the electric fan supply chain
Select two     metrics to evaluate performance of the electric fan supply chain
 Type of      relationship
 Supplier      location, size of company, and financial stability
 Metrics used to      measure supplier performance (on-time delivery, defects, etc)
 Supplier      improvement strategies 
Describe how     lean production principles may be used to maximize the efficiency and     effectiveness of the electric fan supply chain process
Select a     business forecasting technique (qualitative or quantitative) for the     electric fans and describe the forecasting process to be used at Riordan
Create a sales     forecast for electric fans using selected techniques
 The      determination of inventory requirements of the electric fans component      parts and finished goods
 The selection      of an appropriate inventory system (fixed order quantity, two bin method,      etc.) to meet inventory requirements
 Click the Assignment Files tab to submit your assignment. Begin working on the Week Six assignment. In Week Six, you propose and implement new process design and supply chain processes for the manufacturing of Riordan's electric fans.
 OPS 571 Week 4 Quiz
 1.) A work breakdown structure is
a hierarchy of tasks, subtasks, and work packages
a Cost and Performance tracking schedule
a structure that is incompatible with the Critical Path Method
a simple list of the activities making up a project
 2.) The vertical axis on a Gantt chart is usually which of the following?
Activities
Time
Cost
Profit
 3.) Which of the following identifies a key principle of Reengineering?
Organize around tasks.
Downsize (lay-off) workers and do the same amount of work as before.
Merge information-processing work into the real work that produces the information.
Capture information both at the source and where it is interpreted.
 4.) At the onset, a project originates as which of the following?
A Gantt chart
A series of milestones
Critical path method (CPM)
A statement of work (SOW
 5.) Consulting firms typically use which of the following techniques to plan and monitor the engagements of the firm or specific projects?
CPM/PERT
Qualitative forecasting
Materials requirements planning (MRP)
Quantitative layout
 6.) A Responsibility Chart specifically identifies which of the following?
Planning the tasks for a project
Customer satisfaction
Commitment to quality
Level of inventory
 7.)Which of the following would be the result of subdividing a project?
Job orders
Work events
Job categories
Tasks
 8.) Which project progress technique includes the essential features of a project plan, budgeted cost of work scheduled and budgeted cost of work performed?
Earned value management
Critical path method
Cost analysis
Gantt chart
 9.) An example of a graphic project report utilized within project management is:
Project proposal
Equipment and supplies chart
Humphrey chart
Cost and performance tracking schedule
   �|{Ġ�
0 notes
Text
OPS 571 Complete Week 3 - NEW
OPS 571 Complete Week 3 - NEW
IF You Want To Purchase A+  Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=ops-571-complete-week-3-new
IF You Face Any Problem Then E Mail Us At  [email protected]
OPS 571 Week 3 DQ 1
Think about your latest trip to a hospital/health care facility. How many different handoffs did you encounter? How would you rate the quality of the service relative to the patient experience and relative to that of the friends and family?
 OPS 571 Week 3 DQ 2
With so much productive capacity and room for expansion in the United States, why would a company based in the United States choose to purchase items from a foreign firm? Discuss the pros and cons.
 OPS 571 Week 3 DQ 3
From the choice of simple moving average, weighted moving average, exponential smoothing, and linear regression analysis, which forecasting technique would you consider the most accurate? Why? 
 OPS 571 Week 3 Individual Process Designs and Supply Chains, Pt 2
Write a paper in which you evaluate the current state of the process you selected in Week Two and summarize the proposed future state. 
Required Elements:
Evaluate the     efficiency and effectiveness of the process selected in Week Two using the     data collected.
Determine areas     for improvement
Design an     improved process flow chart using an appropriate tool.
Summarize two     items from this improved process.  Include an explanation of how     these items could be used in your personal or professional life to improve     a process.
No more than 700     words
Consistent with     APA format
Click the Assignment FIles tab to submit your assignment. 
 OPS 571 Week 3 Learning Team Reflection
Discuss the following: 
What is the     chase strategy? 
Identify 2-3     companies that might use the chase strategy
What are some of     the challenges associated with using the chase strategy and why? 
Prepare a 350- to 1,050-word paper detailing the findings of your discussion.
Click the Assignment Files tab to submit your assignment.
 OPS 571 Week 3 Quiz
1.) When considering outsourcing, what should firms tend to avert?
Allowing outsourcing to develop into a substitute for innovation
Losing control of non-core activities
Giving the outsourcing partner opportunities to become a strong competitor
Allowing employees transferred to the outsourcing partner to rejoin the firm
 2.) What is the important starting point in developing a capacity plan?
Predicting the ability of suppliers to meet needs
Determining the effective capacity of a resource over some period of time.
Predicting the needs of customers
Understanding key components of the supply chain
 3.) Which of the following is an input to the master production schedule (MPS)?
Bill of materials
The aggregate plan
Exception report
Inventory records file
 4.) Which of the following is an input file necessary to run an MRP program?
Planned-order schedules
Bill of materials (BOM) file
Exception reports
Quality management report
 5.) Which of the following forecasting methods is very dependent on selection of the right individuals who will judgmentally be used to actually generate the forecast?
Simple moving average
Time series analysis
Delphi method
Weighted moving average
 6.) The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?
Inventory on hand and financing costs for that inventory
Workforce levels and inventory on hand
The workforce level and the degree of automation
The strategic plan and the products available for sale
 7.) Which of the following is an essential resource that flows through a hospital supply chain?
Patients
Medicine
Doctors and Nurses
Information
 8.) In business forecasting, what is usually considered a short-term time period?
Four weeks or less
Six months or more
Less than three months
More than three months
 9.) Which of the following is an input file necessary to run an MRP system?
Planned order schedule
Exception report
Inventory records file
Computer-aided-design files
 10.) Which of the following is most closely related to the reason a firm might implement MRP?
So they can order the right parts
So they can order parts sufficient for immediate use
To assure appropriate quality levels
So they can insure that parts to arrive D. To assure appropriate quality levels
 11.) Which of the following is one of the main purposes of a MRP system?
Decrease labor requirements.
Educate personnel in basic work rules.
Determine the materials needed.
Stimulate the work force.
 12.) The text mentions several common approaches to use when developing a strategy to close a capacity gap (where utilization of a resource exceeds capacity available). Which of the following is among the common approaches mentioned?
New construction
Hire more employees
Closing a related department
Transferring capacity from other units
 13.) Which of the following is a perpetual system for inventory management?
Fixed-time period
P model
Fixed-order quantity
First-in-first-out
 14.) Which of the following is considered a pure production planning strategy?
Stable workforce, variable work hours
Variable workforce, stable work hours
Lag demand
Level playing field
 15.) In conducting aggregate operations planning there are a number of required inputs. Which of the following are inputs considered most external to the firm?
Current physical capacity of the organization
Raw material availability and competitor's behavior
Internal inventory levels and market demand
Subcontractor capacity and inventory levels
 16.) In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
Future demand
Cyclical elements
Inconsistent demand
Past demand
 17.) Which of the following is an input to the master production schedule?
Prototype products from product development
Aggregate component schedule
Peg reports from factory records
Forecasts of customer demand
 18.) What is the effect of the lack of synchronization among supply-chain members?
Bullwhip effect
Continuous replenishment
Metcalf's Law
Forward buying
 19.) Which of the following is one of the categories of manufacturing inventory?
Work-in-process
Economic Order Inventory
JIT Inventory
Quality units
 20.) Which is the most challenging kind of supply chain to manage according to Hau Lee?
Risk-hedging
Agile
Efficient
Erratic
 21.) What is another name for the fixed-order quantity inventory model?
Cycle counting model
The ABC model
Economic order quantity model
Periodic replenishment mode
   becau�|uN��
0 notes