Standard Time® Graphical Timesheet
youtube
From http://www.stdtime.com Here’s a quick video showing how to use the graphical timesheet in Standard Time®. You’ll notice seven tabs along the top. I have the Timesheet tab selected; then click this little gray triangle over to the left, choose Graphical Timesheet. You’ll also notice there is an expense sheet for entering materials and expenses. And there are some other options here for the regular timesheet.
Let’s choose Graphical Timesheet and there are already some entries in here. You can double click on them to enter notes and other choices. But if you want to enter a new selection simply drag, drop and enter your notes here. Click save and close, in this case it wants me to choose a project for the job that I’m doing. And probably is going to want me to choose a task. Once I’ve done that click save and close.
I now have that entry. I can drag and drop to change the times or duration. Or again double click on it to put in more notes or choose other options. That’s how it works. You can switch back and forth between the graphical timesheet and the normal calendar timesheet to see your time log entries. Hope it helps.
See more at: http://www.stdtime.com
LET’S CONNECT! Standard Time ► http://www.stdtime.com Twitter ► http://twitter.com/ScoutwestInc Facebook ► http://www.facebook.com/timesheetsoftware Google+ ► http://plus.google.com/114409741935383434971 Linkedin ► http://www.linkedin.com/company/scoutwestinc Pinterest ► http://www.pinterest.com/scoutwestinc Android App ► http://play.google.com/store/apps/details?id=com.scoutwest.standardtime iOS App ► http://itunes.apple.com/us/app/standard-time/id818412788 YouTube Subscribe ► http://www.youtube.com/subscription_center?add_user=scoutwestinc
Read More Here: https://www.stdtime.com/blog/standard-time%C2%AE-graphical-timesheet.htm
0 notes
Text
Use barcodes for task status on the shop floor
youtube
Get task status on the shop floor by scanning barcodes. In fact, just look up on the big screen for a Work In Progress display. The last task status is display in WIP. Employees start and stop timers, record task and project status, and record materials used – all from barcodes.
Read More Here: https://www.stdtime.com/blog/use-barcodes-for-task-status-on-the-shop-floor.htm
0 notes
Text
Update Your MFG with Barcode Time Tracking
youtube
Consider updating your mfg shop with barcode time tracking. Scan work orders and tasks at each stage of the manufacturing process. Now you know who worked on the job last, what stage it is in, and the estimated completion time.
Read More Here: https://www.stdtime.com/blog/update-your-mfg-with-barcode-time-tracking.htm
0 notes
Text
Mfg software
youtube
Track manufacturing hours using barcodes.
Read More Here: https://www.stdtime.com/blog/mfg-software.htm
0 notes
Text
Shop Floor Barcode Scanning
youtube
Hi everyone, Ray White from Mfg Projects I’m here to introduce you to barcode time tracking on the manufacturing floor. There are a lot of advantages to tracking time right on the shop floor with barcode scanners. Consider these three to start:
1. First, you’ve got work orders or manufacturing projects, but how do you get actual work hours from employees that don’t use computers? Or don’t sit in front of a workstation? The answer is, with barcode scanners. That’s advantage number one, and it’s a big one.
2. Number two; barcode scans are the most accurate way to track projects. No more fat finger, mouse, clicking, fake time entries, trying to remember what you did last Tuesday, or last week. You just scan… bleep, bleep, bleep, and a timer starts. Bleep, bleep again, and it stops. That’s real data; nothing fake about that.
3. Number three; you collect a lot of extra information in just a few scans. The work order, the client, the employee, department, task, phase, status, kind of work, percent complete, not to mention actual start and stop times. This is a river of data coming off the shop floor.
That was just three. There are others you’ll see in these videos. So, if you want to track actuals on the shop floor verses estimates, barcode scanners are the way to go.
Hey, I’m Ray White. Good luck on your manufacturing projects!
Read More Here: https://www.stdtime.com/blog/shop-floor-barcode-scanning-2.htm
0 notes
Text
Project Task Link Relationships
youtube
Every manufacturing project has tasks, or steps, phases, or activities that define the work you’ll perform. And some of those tasks are dependent upon others. In other words, you can’t start one step until another is completed. Or, there may be phases later in the process that won’t start until previous phases are finished. Those are called task dependencies. Tasks are linked, and their dates depend on previous tasks.
In this video, we’ll look at four types of task dependencies that model actual conditions on the shop floor.
Let’s take a look!
Here on Standard Time® we’ll look at four distinct types of link relationships that you can see by the lines and the arrows in the Gantt chart. The first one we’ll look at is finish-to-start, which is the most common; then start-to-start, then finish-to-finish and finally we’ll take a look at start-to-finish.
Let’s go ahead and look at the most common link relationship which would be the finish-to-start. The starting date of a successor task is linked back to the finish date of another. When this task ends another can start. That’s the most common. We’ll move this task and you can see the next task updates because this one has been moved. Finish date on this one changed so that changes the starting date of the successor task.
The next type would be start-to-start. You can see the starting date of this task is linked back to the starting date of another. When that one is moved then the successor is also moved because the two start dates are linked together.
The third type would be finish-to-finish, where the finish date of this task is linked back to the finish date of another. We move that, the two finish dates are linked together and when the predecessor moves then the successor would also be updated.
The fourth type would be start-to-finish, where the starting date of this task goes down to the finish date of another. When we move this task then the successor also moves because the starting date is linked back to the finish date.
The examples you see down below are variations of we already looked at. We’ve got start-to-start; when the starting date of this task changes then the starting date of a successor task would change. We’ve also looked at the finish-to-finish; so when the finish date of this one changes then the finish date of the successor would also change. So you can combine these to form a nice little link relationship.
The long lines you see on these milestones are lag times. If we click on this link icon in the link column; we can go ahead and look at the lag times that you see connected with these link relationships. I should point out that the inbound tasks that you see here, actually none here, are predecessors and the outbound tasks are the successors. They are linked together with certain link relationships. In this case they have some lag times. I’ll click here, you can see the finish-to-start link relationship; which we already looked at. And a lag time of two calendar days. Close that and look at this one.
We have start-to-start, which we’ve also looked at previously with minus-four calendar days. Cancel out of these and that explains the long lines that you see here linked to these milestones. That covers the four distinct types of link relationships in Standard Time that you can use for your projects.
Read More Here: https://www.stdtime.com/blog/project-task-link-relationships-2.htm
0 notes
Text
Scheduling Projects for Manufacturing
youtube
Hello manufacturing managers! Do you ever have trouble scheduling jobs for production? • You have to get them slotted quickly • But you also have to find available resources • And you can’t overload them with too many jobs. That’s a challenge! Have you tried Standard Time? With Standard Time, a Resource Requirements chart updates as you drag projects in your Gantt chart. Now you instantly see the impact on labor and materials. Like the idea? Download today! www.stdtime.com/manufacturing
Read More Here: https://www.stdtime.com/blog/scheduling-projects-for-manufacturing.htm
0 notes
Text
Assembly Line Project Allocation and Scheduling
youtube
If your manufacturing shop has assembly lines, you might like to see which projects are running on each line. Turns out, there’s a tool for that. It’s called Standard Time, and it answers a lot of similar questions like:
1. Which assembly line has a free slot for my next project?
2. Which lines are booked?
3.What is the utilization rate of each assembly line?
4. Which assembly line is my project running on?
5. And others
Let’s have a look at project resource allocation in Standard Time, and specifically how that relates to work orders… or projects… running on assembly lines.
Here we go!
We’ll start by choosing tools, assembly lines here in Standard Time®. This will give you a list of assembly lines in your operation; you can click the + symbol to add new ones and then set the properties on those assembly lines. I won’t go into the properties here; that’s not the focus of this video; we’ll be talking about project resource allocation on assembly lines. You probably would want to right click on an assembly line and choose assign projects.
You’ll notice that you can have multiple projects assigned to a single assembly line. Normally those projects would execute sequentially, so when one project ends the next would start. That would allow you to see the task and project allocation to assembly lines and spot gaps or slots where you can put new projects.
You may also use the project tasks tab and Gantt chart to see a timeline of those tasks into the future. Then choose view, Project, Resource Allocation. You’ll notice I’m looking at all projects here, I’m going to click this last option. And then choose an assembly line from the drop down. Here you can see all the projects that are allocated to this assembly line. Pick another one and you see the allocation for that assembly line.
You may also notice the Gantt chart is still visible behind this resource allocation window. I can grab tasks and projects and drag them and see the effect that it has on that assembly line. You can spot the slots where new projects could be added and use this as a tool to slot new projects for your assembly lines.
Read More Here: https://www.stdtime.com/blog/assembly-line-project-allocation-and-scheduling-2.htm
0 notes
Text
CNC Operators Track Time with Barcodes
youtube
Close tolerances and tight sales margins? Keep track of work orders using barcodes. CNC operators use barcode to track manufacturing time on the shop floor. Here’s the process:
Read More Here: https://www.stdtime.com/blog/cnc-operators-track-time-with-barcodes.htm
0 notes
Text
Manufacturing Resource Allocation
youtube
What really is Project Resource Allocation? And why do manufacturing managers care about it? In essence, it’s just looking into the future and making sure: • You’re using project resources the best possible way •And that nobody is over-allocated • And nobody is under-allocated Nice! But is there a tool for that? Sure, it’s called Standard Time® It’s a project management and manufacturing tool for your shop floor. Download a copy from www.stdtime.com/manufacturing
Read More Here: https://www.stdtime.com/blog/manufacturing-resource-allocation.htm
0 notes
Text
Organizing Manufacturing Projects
youtube
In this video I will introduce you to Standard Time®, a Manufacturing Resource Planner. We’ll look at five ways to organize projects for your manufacturing operation. In other words, how to group and report on projects of differing types. The groupings I’ll show are: 1.Portfolios 2.Folders 3.Clients 4.Status 5. And assembly lines
These are all optional. Use any or all to visualize and report on your manufacturing projects.
Want to take a look? Here goes!
Let’s begin by choosing Tools, Projects in Standard Time®. This is the place where administrators would set up projects and set the properties for them. Right off the bat you see folders where projects can be dropped into; create your own hierarchy of folders, that would be the first level of classification. You also, on the right-hand side in the properties, see client, portfolio and status.
As I click on the different projects you can see those fields changing. You could use clients for external or internal clients, that you’re doing work for or departments. If you don’t have any of those three you might consider using client for a completely different purpose for classifying projects. Portfolios of course would be for different kinds of projects that you do, you could group them together by kind. And then you can also set the status, which is another form of classification for projects.
So those are four quick ways you can classify projects. You also have assembly lines which you see over on the left-hand side. How can you use these classifications or groupings of projects within Standard Time? The first way would be to use this tree on the left-hand side to filter the views on the right. You see tabs along the top, I’m looking at the project tasks tab, which shows all of the projects and tasks within Standard Time. I can use that tree on the left-hand side to filter this view. I could, for instance, open the clients section, click on a client. Now I’m looking at just the projects, which are these wide blue bands, or this particular client. Or go down to project portfolios, click on a portfolio, and I now see all the projects for that portfolio. Or go over to folders, click on a folder and I see the projects for that folder.
If you have assembly line set up you could click on assembly line and see all the projects that are running on that assembly line. So lots of different ways to categorize, visualize, group your projects. Another way might be to go to the view menu choose project, resource allocation, you see a few buttons at the top of this drop down that you can use to find all the project resource allocation for a certain folder. Or for a portfolio or for an assembly line. Or see all of the projects.
Another way would be to the view menu, choose project revenue, you have those same buttons that you can look at all the revenue for a folder, portfolio and so on. You have these groupings available within reports as well. If I open time log reports I can see reports by client or by portfolio. You could create custom reports that used folders, status or assembly lines as well. Lots of different ways to use those classifications to visualize, group and report on your manufacturing projects.
Read More Here: https://www.stdtime.com/blog/organizing-manufacturing-projects-2.htm
0 notes
Text
Manufacturing Resource Requirements Software
youtube
Every manufacturing project, work order, or job has resource requirements.And every successful manufacturing manager monitors them – one way or another. That’s what makes Standard Time® a good choice for project scheduling. •Drag projects on your production schedule, and watch resource requirements update instantly • Find over-allocated and under-allocated conditions • Manage headcount Haven’t tried Standard Time in your manufacturing shop? Download today! www.stdtime.com/manufacturing
Read More Here: https://www.stdtime.com/blog/manufacturing-resource-requirements-software.htm
0 notes
Text
Manage Manufacturing Projects
youtube
Manage your manufacturing projects With Gantt charts, task links, resource allocation And Standard Time®
SHOW MORE
Read More Here: https://www.stdtime.com/blog/manage-manufacturing-projects.htm
0 notes
Text
Work in Progress on Shop Floor
youtube
View work orders on a big screen Right on the shop floor With Standard Time®
Read More Here: https://www.stdtime.com/blog/work-in-progress-on-shop-floor.htm
0 notes
Text
Project Revenue From Work Orders
youtube
Work orders come through your manufacturing shop every week. And you schedule them for production with Standard Time® software. Nice! But did you know there’s a handy bar chart for future revenue? That’s right! Pull up a chart to see expected revenue for jobs you: • Won • Or lost • Or are still in progress Think of it as a sales funnel for manufacturing work orders. Check out Standard Time here: www.stdtime.com/manufacturing
Read More Here: https://www.stdtime.com/blog/project-revenue-from-work-orders.htm
0 notes
Text
Total hours for past due tasks
youtube
Want a quick tip for your manufacturing projects? Follow the steps in this video to see all your past due tasks and the total number of hours to go. There’s a quick way to do this in Standard Time®. That’s a time tracking and project management app built for manufacturing. Here’s how to see all your past due tasks.
I want to see the total number of hours for all the tasks I have to do that are past due right now. To do that I’m gonna go over to the Project Tasks tab. I’ve already displayed the Duration, Actual Work and Remaining. The Remaining is the most interesting column because that shows me the total number of hours yet to do on tasks.
I displayed these by going to the View menu, choosing Columns, you see them listed here on the left. I added them to the right and then put them into position. The next step is to go over to the Task Completion section and click on Past Due Tasks. That shows me all of the tasks that are past due at this time but I still need to see a total. I’m going to right click, choose Show Totals; it turns out I have 2700 hours remaining on past due tasks. I’ve only completed 66 hours, which is 2% of those. So, this is the work I have ahead of me right now.
See more: www.stdtime.com/manufacturing
Read More Here: https://www.stdtime.com/blog/total-hours-for-past-due-tasks.htm
0 notes
Text
Project Revenue From Gantt Chart
youtube
A common function of Manufacturing Resource Planners, or ERP’s, is to compute estimated project revenue. Standard Time® is no exception, which we’ll see in a minute. For this video, we’ll assume that most of the projects or work orders going through your manufacturing shop have lifecycles. In other words, they start, and they end. And they have some estimated revenue. Turns out, that’s the exact information needed to chart revenue for coming months.
Let’s examine the Project Revenue bar chart in Standard Time. This is a nice little chart you get for free, just by using project tasks in your manufacturing projects.
Alright, let’s switch over now, and get a look.
Here in Standard Time® we see a nice little bar chart that shows project revenue on a month to month basis. You can look at it for all projects or a specific project or by folder, portfolio or other criteria like whether you’ve won or lost a certain projects. You can look at it for a certain client and then chose a time period for the bars.
Real nice but where does the information come from? Let’s take a look and find out. Close this, go over to the Tools menu choose Projects. We’ll click on a project and then scroll down, you’ll see a start and finish date and then an estimated cost. The bars are getting the information spread across the duration of the project and the value of the project. You can either enter these values manually or find that they update automatically from your project tasks.
As you add tasks, edit tasks, drag and drop on the Gantt chart; those values will be fed up to the project level and then ultimately into the Tools, Project Records which you see here. Now when you go to the View menu choose Project Revenue, you’ll see the revenue for each month, the projects in your operation.
Read More Here: https://www.stdtime.com/blog/project-revenue-from-gantt-chart.htm