Dam Formwork DB180/240
TECON Dam formwork DB180/240 is with high dependability and loading capacity for mass concrete structures without tie rod to pull through. It is widely used for forming one-sided construction projects, such as dams, run-off river power stations or navigation locks.
Features of Dam Formwork DB180/240
High load capacity without tie rod to pull through concrete structure
Can produce both single side wall and double side wall inclined
Shorten crane time due to one unit design of dam formwork
Reliable anchorage system and strong bracket strength ensures highest on site safety
Can be compatible with BASE 20 formwork, HETO Frame formwork etc.
 Specification of Dam Formwork DB180/240
Two pieces of dam formwork climbing bracket together with TECON wall formwork section can be assembly into one complete unit for crane lift
 No tie rods needed to pull through the wall
 Application of Dam Formwork DB180/240
One-sided construction projects such as dams, run-off river power stations and navigation locks
 Related Formwork of Dam Formwork DB180/240
TECON climbing formwork CB180/240, TECON self-climbing formwork TSC50/100, TECON Multi-function climbing Formwork MB180
 https://www.teconform.com/products/dam-formwork-db180-240.html
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
Column Formwork
TECON Column formwork system mainly includes Adjustable Steel Frame Column Formwork, HandSETS Column Formwork, BASE 20 Column Formwork, Plastic Round Column Formwork, Plastic Adjustable Column Formwork.              
 They can fabricate different kind of columns at different heights and diameters as well.
https://www.teconform.com/products/column-formwork/
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
Climbing Formwork
TECON Climbing formwork system mainly includes Self-climbing Formwork TSC80, Jump Climbing Formwork CB180/240, Dam Formwork DB180/240 and Multi-function Climbing Formwork MB180.
 Self-climbing formwork TSC80 can climb by itself via hydraulic cylinder, while Formwork CB180/240 can only climb via tower crane lift. Dam Formwork DB180/240 can fabricate both single side wall and double side wall without any tie rod pull through. Multi-function Climbing Formwork MB180 is always guided by its rail during climbing, and it can climb freely with or without tower crane lift sine it has its own mobile hydraulic cylinder.
 They are widely used in high-rise buildings, bridge pylons, concrete tanks and other civil engineering project.
 https://www.teconform.com/products/climbing-formwork/
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
Beam & Slab Formwork
TECON Slab formwork and Beam formwork system mainly includes Flex 20 Slab Formwork, Slab Table Formwork, Aluflex Slab Formwork, Steel Deck Slab Formwork and Aludeck Slab Formwork.
 For the three systems in modular formwork part, they can also fabricate slab and beam, and are even more user-friendly due to handset function. They are HandSETS Formwork, Plastic Formwork TP60 and AluLITE Formwork.
 They can fabricate different kind of slabs and beams, different storey heights, slab thicknesses and shapes, beam widths and depths etc.
 Depend on different layout and client’s requirement, TECON technician will propose the most suitable system based on cost and site output.
 https://www.teconform.com/products/beam-slab-formwork/
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
Aluminium Formwork
TECON Aluminium Alloy formwork includes Alumi Frame Wall Formwork, Aluflex Slab Formwork, Alugrid Slab Formwork, Aludeck Slab Formwork and AluLITE Formwork.
   All those formwork are fabricated completely by aluminium alloy. For some framed system, they are lined with TECON-Form Birch or Plas-tech shuttering as well in order to achieve more reuses time.
   Compared with steel formwork, formwork panels made from aluminum alloy ensures much lighter weight, thus all of them can be handled by manual without crane lift. Due to their light weight, it increases site efficiency greatly.
 https://www.teconform.com/products/aluminium-formwork/
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
High Rise Formwork
Safety is the first necessity of high-rise projects and TECON takes safety as its first priority. We not only focus on ensuring project quality, but also pay great attention to the personal safety of laborers.  Hence with a think-tank in TECON technical team and cutting-edge technology in producing different types of formwork, we are able to give birth to TECON sophisticated self-climbing and climbing formworks, as well as facade protection, all with fully closed multi-platforms.
   The Advantages of Teconform High Rise Formwork
All TECON formwork for high rise building offers construction sites steady & high-safety progress during self-climbing via hydraulic cylinders or other power units. All TECON climbing brackets can be rescheduled together with right size shuttering in order to fit any size and shape highrise buildings without worry about its reuse and cost.
 Reliable embedded anchor system and multi-platform with facade protection maximize the safety and convenience during climbing and work status.
   Affordable & High Rise Formwork Solution
TECON self-climbing formwork TSC50/100, Multi-purpose climbing formwork MB180, Jump formwork CB240, Protection screen, and Self-climbing platform lead to the full range of forming and protection solutions for highrise buildings, among whom you may definitely find the most suitable one to fit your project budget and requirement.
 https://www.teconform.com/high-rise-formwork.html
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
Bridge Formwork
To span, a bridge is to make knowledge to experience. TECON is firmly committed to building its lead in formwork-technology. This is the reason it continues developing measures to boost construction efficiency and putting them into practice systematically.
 TECON formwork solutions always come as a package that delivers tangible benefits and added value to our customers. We have a client-orientated mindset and 'build bridges' to our customers' goals.
   The Advantages of Teconform Bridge Formwork
The automatic climbing formwork handles significant variations in the design of piers and pylons, regardless of geometry, height, and dimension.
 Cost-effective and on-time delivery of material-optimized shoring scaffolds for safe and economical transfer of high loads from the upper structure of the bridge.
 TECON's all-in-one system offers excellent cost-effectiveness and fast equipment availability.
 Long-term collaboration with leading beam equipment suppliers enhances project-specific planning and pre-assembly of high-performance molding systems, which means smooth, efficient construction schedules.
 Affordable Bridge Formwork Solution
As soon as we get the structural drawings of your bridge project, whether for bridge pier, pylon or box girder, our team will submit corresponding formwork and scaffolding solution to you on cost saving basis.
https://www.teconform.com/bridge-formwork.html
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
Advantages of High End Formwork System Over Conventional Steel Formwork
Advantages of High End Formwork System Over Conventional Steel Formwork
 The purpose of the high-grade building formwork is to form and maintain the newly poured concrete so that it can reach a certain strength to withstand the temporary structure of its own weight and can be removed as a formwork. With the development of the construction industry, formwork engineering has become an important aspect of the construction industry. Vigorously developing formwork projects can not only improve the efficiency of the construction but also reduce costs.
  In the early 1970s, Chinese building structures were dominated by brick-concrete structures, and building templates were dominated by wooden formwork; but because of the large use of wood, China ’s timber resources have become increasingly scarce. Later, China has successfully developed the advanced construction technology of combined steel formwork, which saved a lot of wood. The promotion and application of steel formwork have reached more than 75%. The production of steel formwork has reached more than 1,000 factories, and the annual wood saving is about 15 million cubic meters, resulting in good economic and social benefits.
  Since the 1990s, China’s building system has developed a lot. High-rise buildings, super high-rise buildings, and large public buildings have been built in large numbers. The rapid development of urban transportation, highways, and railways has imposed new requirements on formwork and scaffolding construction technology.
 China has continuously introduced advanced foreign formwork systems and has also developed a variety of new formwork and scaffolding. With the development of building formwork engineering, the pattern of steel formwork in China has been broken, and it has gradually transformed into a situation of coexistence of multiple forms. So we TECON decided to dedicate this area to fill the gap between the Chinese and European markets. After a few years of effort, our slab table formwork, climbing formwork, self-climbing formwork, Dam formwork, which has a stable foundation in the market and has gained the full trust of foreign customers.
 https://www.teconform.com/advantages-of-high-end-formwork-system.html
Tumblr media
0 notes
tecon11-blog · 5 years ago
Text
New project arise in Djakarta using TECON Protection Screen
APG is one of the biggest contractor in Indonesia. Based on the long term cooperation between APG and TECON,this project was settled in October 2019. Back to the beginning of our conversation, TECON provide the technical planning and consulting and TECON’s engineering team traveled several time to the project site. Engineers from both side had a deep conversation to understand each other.As a result TECON worked out a perfect solution-Self climbing protection screen. This project located along the freeway from Djakarta to Bekasi.It will become a beautiful architectural landscape. TECON did best to deliver the formwork in advance of the lead time. The technical support team arrived the site on 8th January to start the on site support and supervision. We can see they are so happy working together.
Tumblr media
TECON is always looking forward to providing formwork and technical services for more overseas projects. Our mission is to provide high-quality and professional services and competitive prices so that more people can use the system template and improve the construction level. Cheers!
(source:https://www.teconform.com/new-project-arise-in-djakarta-using-tecon-protection-screen/)
0 notes
tecon11-blog · 5 years ago
Text
TECON Self-Climbing platform
Seasons greetings and best wishes for the new year, TECON wish you a successful business and come into a good fortune.
This article mainly describes the development advantages of TECON Self-Climbing platform (Short name: TECON SCP).
TECON SCP, as a building equipment capable of climbing up or down depending on the building, has obvious development advantages, because it brings a good construction experience to the construction operation. It can effectively carry out construction personnel when used. The division of labor and utilization is to maximize the usefulness. The construction personnel are well allocated to various positions, and there is no need to gather human, material and financial resources to build traditional scaffolding. TECON SCP completely changes the traditional scaffolding system technology: it does not need to repeatedly turn the shelf, eliminating redundant dis-assembly and assembly processes, and using it all at once.
TECON SCP nets are not restricted by high altitudes, and the essential advantages in the work reflected in the development of high altitudes are unmatched by traditional scaffolding. Its low carbon property: 70% steel consumption, 95% power saving, 30% reduction in construction supplies, 30% -60% savings in the cost of each building; Fully automatic synchronization control system and remote control system can be used independently preventing unsafe factors and anti-falling devices effectively ensure the safety of the frame and ensure a safe environment for construction. Tidy and beautiful construction site also give the construction workers good environment for construction, effectively achieving clean and safe construction.
Convenience, safety and aesthetics of building climbing frames are its basic competitiveness, and with the development of construction technology, its scientific and technological intelligence have also become its core development competitiveness.
Tumblr media
(source:https://www.teconform.com/tecon-self-climbing-platform/)
0 notes
tecon11-blog · 5 years ago
Text
TECON Alu-deck—Only one day to finish 200sqm slab!
How long will it take for Finish 200sqm slab? One week? No, it only takes one day with Tecon Alu-deck, which is one of the most efficient and convenient slab formwork system. More and more customers choose Tecon Alu-deck for the following reasons.
High Efficiency The panels are made by aluminum frame and 10 mm or 15 mm birch plywood, which is light enough to erect and disassemble. One worker can install 200sqm /day.
Great Saving Early-stripping system saving building material and working time. The slab panel can be removed after 3 days, leaving the props to support the concrete. It means only with one-floor forms and two-floor props, you can finish 200 sqm in 1-2 days (including formwork setup and concrete pouring time).
High Reuses The aluminum frame can be reused for about 300 times and the birch plywood can be reused for 20-45 times.
Reference pictures:
Tumblr media
Would you like to have a try? Any needs, welcome to contact us for more information. Thank you.
(source:https://www.teconform.com/tecon-alu-deck-only-one-day-to-finish-200sqm-slab/)
0 notes
tecon11-blog · 6 years ago
Text
Slef-climbing formwork system for a high-rise building in Dubai
After 45 days fabrication, re-inspection, pre-assembly and 20 days shipment, materials reached Dubai on 8th Oct.
At the same time, our engineer and site supervisor came together to the project, taught workers how to assemble every component, it took around 1 month to prepare everything before self climbing formwork lifted to the structure.
Even though we have already tried to avoid possible problem during assembly, we still came across a few application issues on the site. Thanks to our engineer stayed on site all the time, all related issues were solved quickly, every process went smoothly and project ran faster.
Till 20th, December, inner formwork already climbed one time, outer formwork will be lifted in another 2 or 3 days.
Thought it is our customer’s first time to use self-climbing formwork, the project manager started to know this system well during till now. TECON also supplied all the necessary documents including shop drawings and calculation to the consultancy and finally got their approval.
Therefore, it is easy for them to use climbing formwork on their further projects, and the second and third project are actually all under tendering stage with big win odd after the good experience of TECON quality and site service.
Tumblr media
If you have any upcoming project need self-climbing formwork, CONTACT US NOW. 
(source:https://www.teconform.com/slef-climbing-formwork-system-for-a-high-rise-building-in-dubai/)
0 notes
tecon11-blog · 6 years ago
Text
Advantages of High End Formwork System Over Conventional Steel Formwork
The purpose of the high-grade building formwork is to form and maintain the newly poured concrete, so that it can reach a certain strength to withstand the temporary structure of its own weight and can be removed as a formwork. With the development of the construction industry, formwork engineering has become an important aspect of the construction industry. Vigorously developing formwork projects can not only improve the efficiency of the construction , but also reduce costs.
In the early 1970s, Chinese building structures were dominated by brick-concrete structures, and building templates were dominated by wooden formwork; but because of the large use of wood, China ’s timber resources have become increasingly scarce. Later, China has successfully developed the advanced construction technology of combined steel formwork, that saved a lot of wood. The promotion and application of steel formwork has reached more than 75%. The production of steel formwork has reached more than 1,000 factories, and the annual wood saving is about 15 million cubic meters, resulting in good economic and social benefits.
Since the 1990s, China’s building system has developed a lot. High-rise buildings, super high-rise buildings, and large public buildings have been built in large numbers. Rapid development of urban transportation, highways, and railways has imposed new requirements on formwork and scaffolding construction technology.
China has continuously introduced advanced foreign formwork systems, and has also developed a variety of new formwork and scaffolding. With the development of building formwork engineering, the pattern of steel formwork in China has been broken, and it has gradually transformed into a situation of coexistence of multiple forms. So we TECON decided to dedicate in this area to fill the gap between the Chinese and europe market. After few years effort, our slab table formwork, climbing formwork, self-climbing formwork, Dam formwork, which has a stable foundation in the market and has gained the full trust of foreign customers .
Tumblr media
(source:https://www.teconform.com/advantages-of-high-end-formwork-system-over-conventional-steel-formwork/)
0 notes
tecon11-blog · 6 years ago
Text
PHILICONSTRUCT
Exhibition Name: PHILICONSTRUCT Launch time: November 7th to November 10th 2019 Exhibition location: SMX Manila PH Exhibitor: Construction equipment suppliers/ Construction technical suppliers Business background: PHILICONSTRUCT is the biggest exhibition for construction area which was started from 1991 and conduct once a year, many exhibitors come every year.
TECON’s booth was A305 on the second floor, Our colleagues Brian, Jerry and Flora was there supporting through.
Tumblr media
(source:https://www.teconform.com/philiconstruct/)
0 notes
tecon11-blog · 6 years ago
Text
Aluminum formwork construction process
1. Construction preparation (1) Measuring the payoff (2) Leveling (3) formwork positioning benchmark (4) Chiseling (5) formwork release agent coating 2.Measuring the pay-off line and steel banding Measuring pay-off line Steel banding 3.Wall column formwork assembling 4.Beam plate formwork assembling 5.Formwork assembling tips 1) The base surface of the wall & column formwork should be leveled, the lower end should be close to the positioning reference. 2) The bolts on the side of wall beam should be straight and opposite. When inserting the bolt, hard top should not be pulled diagonally. When changing the position of hole, the machine should be drilled. It is strictly forbidden to use electric and gas welding holes. 3) The back part should adopt the entire rod. If that joint was used, upper back and lower back joints should be staggered. The staggered position should not be less than 400mm, and the joint length should not be less than 200mm. 4) For cast-in-place concrete beams and slabs with a span greater than 4 m, the formwork shall be arched according to the design requirements, and the arching shall not reduce section height of members. 5) Regarding embedded parts, pre-buried holes, reserved holes, hanging angle steel and window sill cover shall not be missed. 6) The axis deviation of vertical support of upper and lower layers of the early-release formwork support system shall not exceed 15 mm, and the deviation of the verticality of support force column shall not exceed 1/300 of the layer height. 6.Formwork reinforcement
Tumblr media
(source:https://www.teconform.com/aluminum-formwork-construction-process/)
0 notes
tecon11-blog · 6 years ago
Text
Have you built the success with TECON?
In the modern construction industry, more and more Formwork system & Scaffold system are used into it, not only can they complete the job perfectly, but also remind people: Saving time is saving money, saving risk is saving life. To swim with the tide, TECON was borned in 2013, with its unprecedented fast development speed, till now, TECON was known as a professional construction expert all around the world by providing with superior quality products & good service. TECON is with good connect with Cambodia market as we have accomplished some excellent projects in recent years. The project in Cambodia was using TECON’s Slab Table Formwork system, which is one of TECON’s most popular product.
It’s a 12 storey building, formwork area is about 3200sqm. After evaluating, our Engineer found out this building is quite suitable to use Slab Table Formwork as the structure is very regular and can be completely covered with the Formwork. Therefore, we strongly suggested to use our Formwork system to finish this project. Due to save labor cost, our customer was very satisfied with TECON’s product & professional advice, especially the Formwork system can be reused that means they can continue to use it for next projects. “We should always remember TECON is committed to providing our customers with a One Stop Solution Provider(Formwork and Scaffold system + solution). To work with profession”, says by our director, Edgar Chou. Every staff at TECON put this vision deep inside their heart and serve customers with passion & profession. Have you built the success with TECON?