route56
route56
Richie's Tumblr
533 posts
Don't wanna be here? Send us removal request.
route56 · 2 months ago
Text
KDOT Lettings: July 2025
Federal-Aid 75 TE 0532-01: Safe Routes to School sidewalk improvements along 1st Street, 6th Street, Lincoln Avenue, Chapman Road, and Dalton Gulch Road in St. George. 4-64 KA-6907-01: Full-depth concrete reconstruction of MacKenzie Street from Grand to Walnut Streets in White City. 81-72 KA-7266-01: Replace the light towers at the US 81/K-106 interchange near Minneapolis. 20 C 5288-01:…
0 notes
route56 · 3 months ago
Text
The biggest item to be let on June
0 notes
route56 · 4 months ago
Text
KDOT Lettings: May 2025
Federal-Aid: 3 U 2497-01: Replace the bridge on Julia Street over Brewery Creek in Atchison. 69-46 KA 7676-01: Pavement Marking on the Overland Parkway between 95th and I-35435-46 KA 7677-01: Pavement Marking on I-435 from the Johnson County Gateway (K-10/I-35) to Metcalf 177-81 KA 7660-01/177-31 KA 7659-01: 2-inch milling and 2-inch HMA overlay on K-177 from I-70 to just south of K-18 (Geary…
0 notes
route56 · 5 months ago
Text
KDOT Lettings: April 2025
There are 21 projects up for bids on April 16. Federal-Aid KDOT April 2025 70-99 KA 7607-01: Bridge repair on the westbound I-70 bridge over Pretty Creek west of McFarland.  70-27 KA-7551-01/70-53 KA-7552-01: Concrete patching on I-70 in Ellsworth and Lincoln Counties. 70-31 KA-6483-01: Replace the J Hill Road bridge over I-70  61-59 KA-7612-01: Bridge repair on Northbound K-61 bridge over…
0 notes
route56 · 6 months ago
Text
KDOT Lettings: March 2025
Federal-Aid: 46 TE 0512-01: New shared-use path along the east side of Sunflower Road from 103rd north to 91st Street in Desoto. 75-70 KA 6756-01: Rehabilitate the bridges over K-276/BNSF Emporia Subdivision Main 1 and the Marais Des Cynges River near Olivet. US 75 to be closed at K-276, detour via K-31 and I-35. Marais Des Cynges River bridge will maintain one lane of traffic, controlled by…
0 notes
route56 · 7 months ago
Text
KDOT Lettings: February 2025
The biggest item on the February KDOT lettings is the reconstruction of the roundabout at the US 59/US 169 junction south of Garnett.
Federal-Aid: 24-23 KA 6793-01: Replace the traffic signal at Teepee Junction in North Lawrence (between US 24, US 40, and US 59) 52 N 0772-01: Full reconstruction of 158th Street from Garden Parkway to Parallel, and on Parallel from 159th Street to 155th. 30-99 KA 3920-01: Replace a small bridge over a drainage ditch with a box culvert at the railroad crossing just southwest of Maple Hill.…
0 notes
route56 · 8 months ago
Text
KDOT Lettings: January 2025
Federal-Aid 59-3 KA 5769-01: Replace two culverts on US 59 in Atchison County. One of the culverts takes US 59 over 262nd Road. 43 C 5292-01: Repace the 246th Road bridge over a Tributary to Elk Creek south of Circleville 44 C 5297-01: Replace the McCall Road Truss bridge over Slough Creek north of Oskaloosa. 77-58 KA 7503-01: 2-inch milling and 2-inch HMA Overlay on US 77 from the K-9…
0 notes
route56 · 9 months ago
Text
KDOT Lettings: December 2024
The December KDOT lettings focus on various maintenance projects, including road overlays, sidewalk improvements, and bridge repairs.
After a couple of months with some big-ticket projects, the December lettings contain more of the “general maintenance” items: Federal-Aid (unless otherwise noted) 35-46 KA 7546-01: PCCP Patching and 4-inch (total) HMA overlay on Northbound I-35 from 95th Street to I-635. 56 TE 0516-01: New sidewalk along 24th Avenue from Prairie to Lincoln Street, and along 12th Street and Burlingame Road…
0 notes
route56 · 10 months ago
Text
KDOT Lettings: November 2024
We have back-to-back months with major projects. November’s big-ticket item is replacing the 18th Street Expressway bridge over the Kansas River in KCK. Federal-Aid 69-105 KA 4881-02: replace the 18th Street Expressway bridge over the Kansas River 17-27 KA-7535-01: 1/2-inch milling and 1.5-inch overlay on K-14 from K-140 to I-70 4-27 KA-7536-01/4-59 KA-7537-01/4-85 KA-7538-01: 1/2-inch…
0 notes
route56 · 11 months ago
Text
KDOT Lettings: October 2024
The October lettings include a major item: Replacing the I-70 Polk-Quincy viaduct in Downtown Topeka. Federal-Aid 73-7 KA-3890-01: Remove the ‘U’ Street bridge over US 73/K-7 in Atchison. U Street will dead-end at US 73 after the project is completed. During the project, there will be a full closure of US 73, through traffic will be detoured via K-192 and US 59. 73-3 KA-7473-01/73-7…
0 notes
route56 · 1 year ago
Text
KDOT Lettings: September 2024
77-58 KA 3924-01: Replace the US 77 bridge over Deer Creek west of Oketo—traffic to be carried via a shoo-fly detour. 99-58 KA 5764-01: Replace the K-99 bridge over Jim Creek South of Frankfort 77-58 KA 6897-01: Reconstruct 10th Street (US 77) in Marysville from the north end of the Union Pacific Bridge to Oak Street 99 C 5238-01: Replace the Fairfield Road Bridge over Hendricks Creen north of…
0 notes
route56 · 1 year ago
Text
KDOT Lettings: August 2024
Here’s what’s up for bids at the August lettings. Federal-Aid 63-66 KA 5729-01: Replace the K-63 bridge over Turkey Creek 7.64 miles north of US 36 and south of K-71. One lane of traffic is to be maintained and controlled by traffic signals. 141-27 KA 5723-01: Replace the K-141 bridge over the Union Pacific just south of K-140. Detour via K-140, K-156, and K-4 281-71 KA 6020-01:…
0 notes
route56 · 1 year ago
Text
Primary Endorsements
Before I begin, I need to re-iterate my Civil Servant’s Disclaimer: The views expressed on this blog are my own, not those of my employer. Those who know me well will find it unusual, but for this election cycle, I have ‘crossed the floor’ and registered for the Democrat primary. The GOP has no competitive primary races involving my voting district, and there are two local races on the Democrat…
Tumblr media
View On WordPress
0 notes
route56 · 1 year ago
Text
KDOT Lettings: July 2024
There are 34 projects up for bids on July 17.
Federal-Aid: 7 C 5217-01: Replace a culvert on 220th Street over an unnamed stream southwest of Fairview 26 C 5221-01: Replace the 370th Avenue bridge over Big Creek South of Walker 69-19 KA 7352-01: Pavement marking from the US 400/K-171 junction to the north Junction with US 160 in Pittsburg 135-87 KA 6978-01: Bridge repair on the 77th Street bridge over I-135 in Valley Center 183-49 KA…
View On WordPress
0 notes
route56 · 1 year ago
Text
KDOT Lettings: June 2024
The June lettings include the widening of the western leg of the South Lawrence Trafficway, along with several pavement marking and bridge repair projects. Federal-Aid 3 TE 0537-01: Safe Routes to School sidewalk project in Atchison, primarily Santa Fe Street from 10th to 15th and 14th from Main to Atchison Street. 40-23 KA 3634-03: Widening of the South Lawrence Trafficway from 2 lanes to 4…
View On WordPress
0 notes
route56 · 1 year ago
Text
KDOT Lettings: May 2024
There are 26 projects up for letting at KDOT on May 22.
Federal-Aid: 70-89 KA 6932-01: Deck patching on the California Avenue bridge over I-70 in Topeka. 4-89 KA 6933-01: Repair the approaches to the Oakland Expressway bridges over 6th Street in Topeka 89 TE 0505-02: Bike route improvements in Topeka 24-62 KA 6437-01: Reconstruction of Wisconsin Street in Cawker City 69-6 KA 6738-01/69-54 KA 6791-01: 2.5-inch milling and 2.5-inch HMA overlay on…
View On WordPress
0 notes
route56 · 1 year ago
Text
KDOT Lettings: April 2024
Here are the highway projects scheduled to be up for bids on April 17.
Here are the projects scheduled to be up for bids on April 17: Federal-Aid 23 TE 0517-01: New Sidewalk along the west side of Church Street from 15th Street to 20th Street in Eudora, including on the bridge over K-10. 66 C 5195-01: Major collector signage upgrade in Northern Nemaha County.81 TE 0525-01: Reconstruction and storm sewer updates on Juliette Avenue from Pierre Street to Poyntz…
View On WordPress
0 notes