Tumgik
associacaoesoa-blog · 7 years
Photo
Tumblr media
Rejections causes Rio Doce to become totally lifeless Largest Environmental Impact of Brazil in MARIANA
0 notes
associacaoesoa-blog · 7 years
Text
Rejections causes Rio Doce to become totally lifeless Largest Environmental Impact of Brazil in MARIANA
Dams break and flood pure waters with contaminated waste with heavy metals. Killing fish in mass, making the waters brown, lacking land and pure water for the population, for consumption, agribusiness, riverside, places to resettle the homeless of the contaminated place (receiving fertile land today is like winning the lottery, you have to have lots of Fortunate, and indemnities cannot pay for preserved land, and so claim that the immeasurable environmental impacts with losses forever because: no insurance covers fertilized land lost forever with the biomes, because humanely.
It is impossible to redo a biome with your hands, replacing all species lost forever, with the expulsion of riverine and native people who have knowledge of fauna and flora and who are immeasurable wealth, with the knowledge of applications of natural inputs in all types of Products daily and globally.
The sites with the tailings of the mining companies: - and the fragility of the security of the current productive process - with state-of-the-art cutting-edge technology; - with extremely high productivity;
The importance of the safety of industrial processes and their losses in the industry, by lack of total monitoring and quality of environmental management and environmental and social cost guarantee.
Waste with loss from lack of monitoring, continuous, daily maintenance for all dams, because there are natural seismic, prolonged drying and infiltrations also impact on the mega infrastructure system construction. An operational failure or bed production process management results in effects many of the same time adverse: parts, products and services outside the specific standard; Interruption of the production process, generating onus and damage to productive performance; Dissatisfaction on the part of the functional and managerial body, with bad indicators, often occurring work accidents, the death of totally innocent people.
Everything MAN does has a certain useful life. The cements and materials of dams have a specific technology to support the life inside the waters, and this requires continuous monitoring, and this also for the hydroelectric, and for that reason the decommissioning of the COMPANY ENERGETCS OF SÃO PAULO that practiced practically in the whole country with the Monitoring in deployments, maintenance, monitoring and training of highly specialized labor with tradition since this type of energy development in the country was started.
 ENVIRONMENTAL EMERGENCY
First must be done work always preventive as the case, fitting the nuclear, as the case of dams that bring great environmental impacts, extinguishing species forever, insured no copper such losses. Why the highest cost with resolution of critical situations of dangerous, fatal and random occurrence, which can occur at different levels of impact. Environmental emergencies endanger human, animal, soil, water, air, and atmosphere hazards. In the case of MARIANA with the spillage of tailings, many families have lost their hopes of being able to see the sweet river which was totally polluted, several residents say that only God can save the Rio Doce than by the highly qualified need and guarantee in the quality of management in the highest RISK processes in industrial enterprises has made the river so polluted that it will take a long time to normalize its life cycle again, like the mass fish that have disappeared, the potability of the water.
More than 18 months. And corporate responsibility has not yet approved the pilot project necessary to be developed and conscious to life again again for the river Doce.
THE ENVIRONMENTAL AND SOCIAL ORGANIZATION ESO-A presented a pilot project with the Company Vale do Rio Doce for the necessary decontamination WORK - 150 km of Rio Doce, with lower cost processes and in several cases with tailings leakage, mainly in the States United States and Europe, develop methods such as that presented in the project for environmental emergency.
Presented rejection to the project, hence reflected about people who can no longer fish, swim, keep their normal life, cannot survive.
But the Stakeholders themselves of the companies that own the tailings have their share of environmental and social responsibility.
And even after 18 months, there are still totally polluted and lifeless places, and the area responsible for the safety of the area did not receive the low cost project to decontaminate 150 km from the Doce River at a cost of 300,000 reais.            This represents a minimum of application in recovery, having in view of the push and pull of Blows between law, defense lawyers, public prosecutors, municipal government and state government and environmental bodies such as IBAMA and even no organization submitted project For renaturation of the Doce river. Why does the company have operating license, and have not even decontaminated the Doce River? That's the most affected - all the loss of your life, after thousands of tons of heavy metals stored in the funding damn that needed total safety for the excellent quality of management by preventing that it could have never been occurred.            And as environmental and social entity we do not know why the company rejected the process of low cost to give life to the Doce River.
0 notes