atopcorporation-blog
atopcorporation-blog
ATOP Corporation
121 posts
Don't wanna be here? Send us removal request.
atopcorporation-blog · 7 years ago
Link
The communications sector has been growing at a rapid pace, but advancing technology doesn't show the entire picture
3 notes · View notes
atopcorporation-blog · 7 years ago
Photo
Tumblr media
Bigdata Governance: Using SAP HANA and Apache Spark ☞ http://bit.ly/2IEvmLN
#bigdata #ApacheSpark
2 notes · View notes
atopcorporation-blog · 7 years ago
Photo
Tumblr media
Learn Big Data: The Hadoop Ecosystem Masterclass ☞ http://bit.ly/2LoKScf
#bigdata #Hadoop
4 notes · View notes
atopcorporation-blog · 7 years ago
Link
Machine learning gives data center operators a better handle on cooling, power and performance.
1 note · View note
atopcorporation-blog · 7 years ago
Link
This week in Data Centers. New technology and green energy improvements
0 notes
atopcorporation-blog · 7 years ago
Text
Outdoor wireless network solutions
Mobility is one of the most important social and technological movements in the past decade which has permeated all aspects of our lives. A key enabler of the movement, WiFi is fast becoming the answer to many businesses mobility problems.
Today’s lifestyles mean an ever-growing thirst to receive data, voice and multimedia services anytime, anywhere. And to meet this demand, operators of all types are building advanced broadband networks using various technologies from Wi-Fi and WiMAX to provide Personal Broadband services. WiFi internet access is in high demand and being in the outdoors is no exception.
WiFi Outdoor Access Points uniquely combine high-gain antenna technology and external weatherproof housing to enable an extension to a WiFi network beyond the offices four walls. Built to withstand the harshest of outdoor conditions, WiFi Outdoor Access Points are ideal for general enterprises covering outdoor areas where Ethernet cabling is not possible.
Business-class routers and access points (APs) typically offer multiple SSID and virtual LAN (VLAN) features. When these features are set up properly, multiple wireless network names (SSIDs) can be broadcasted with varying levels of security, one of which could be a  guest network safely segregated from the private network.
With WiFi you enable the staff with the power of transmitting data and accesss the office computers, the internet or intranet not with the speed available using the mobile network, but with fast download and upload speed.
The major challenge in WiFi coverage is to link a low power WiFi CPE like a notebook computer, a WiFi phone or a handheld WiFi device to the access point.
Deployment of an outdoor wireless network requires an even greater specialised skillset due to the unique volatile nature of the outdoor environment. Large scale deployments of WiFi require something more than just a consumer grade WiFi router. There are numerous factors to consider that affect the location, quantity and type of wireless equipment needed, and the design of the network.
Outdoor access points can connect multiple concurrent users over acres of area, penetrating outdoor structures providing unmatched Wi-Fi reception and performance.
1 note · View note
atopcorporation-blog · 7 years ago
Photo
Tumblr media
Treemap Barchart of Google Trends Data
8 notes · View notes
atopcorporation-blog · 7 years ago
Link
Data centers are here to stay, in it for the long haul! 
0 notes
atopcorporation-blog · 7 years ago
Link
2 notes · View notes
atopcorporation-blog · 7 years ago
Photo
Tumblr media
282 notes · View notes
atopcorporation-blog · 7 years ago
Link
Wind power is providing a green solution to power GM data centers
1 note · View note
atopcorporation-blog · 7 years ago
Text
Data Center Design Consideration: Electrical Rooms (1)
Switchboards, switchgear, transformers, generators, and UPSs require space for installation, maintenance, heat dissipation and future expansion (if possible). The wiring, busways, and raceways that distribute the electrical power must be accounted for now or in the future. Electrical engineers should coordinate with mechanical engineers, architects, structural engineers, and others involved in the design of electrical rooms. Documentation and monitoring of electrical system’s equipment and how it connects to the rest of the facility must be accurately maintained. We are going to explain the applicable code requirements and evaluate the design criteria for appropriate electrical-room size to accommodate present and future needs. Furthermore, we analyze the requirements for coordinating with structural, architectural, fire protection, and HVAC requirements.
Tumblr media Tumblr media
Electrical rooms and mechanical, electrical, and plumbing (MEP) spaces are often an afterthought when it comes to building design and planning, either relegated to locations that are left over or deemed undesirable for other planning purposes. This shortsightedness can have unfortunate consequences on the cost, operations, and flexibility of the systems for the future. NFPA 70: National Electrical Code (NEC) dictates the minimum amount of space needed around the equipment for access, operations, safety reasons, and conduit installation. Together, with the actual equipment sizes, this defines the overall minimum dimensional requirements of the room.
Tumblr media
There are three types of general interior electrical spaces that factor into new building design: (1) main equipment rooms, (2) distribution pathways, and (3) local/branch equipment rooms. Code-required working space and dedicated space needs must be met. This article will outline important considerations for these spaces in the early stages of building design as they relate to building type, intended occupancy, size, and future expectations of both the building and the electrical systems. 
Working Spaces
Let’s see the different between working and dedicated space as stated by the NEC (see picture below). The working space helps safeguard a clear working zone around all equipment and ensures protection for any workers or occupants within the room. This includes defining minimum width, depth, and height requirements for the working space, which varies due to voltage and the specific equipment. The higher the voltage of the equipment, the greater the depth of the working space. The width should be equal to the width of the equipment and no less than 30 in., while allowing for opening any doors or hinged panels to a full 90 deg. The height should be 6 ft 6 in. from the floor, or the height of the equipment if greater than 6 ft 6 in. The style and construction type of the electrical equipment dictates whether only front access is required, or if rear and/or side access also is required. For each point of access to a piece of equipment, the minimum working clearances must be provided.
Tumblr media
The dedicated space (depicted in red) and the working clearances (depicted in blue) are shown in a new emergency distribution room.
Dedicated Spaces
Dedicated space is a zone above the electrical equipment. It’s reserved to provide future access to the electrical equipment, protection of the electrical equipment from foreign systems, and for installing conduit/other raceways supporting incoming and outgoing circuits. The requirement for dedicated space applies primarily to switchgear, switchboards, panelboards, and motor control centers. The space should be equal in width and depth to the equipment size and extend from the floor to a height of 6 ft above the equipment (or to a structural ceiling, whichever is lower). No equipment or systems foreign to the electrical installation are allowed in this zone by the NEC.
Tumblr media
The medium-voltage switchgear sections and unit substation transformers in a large data center installation require additional space and clearances. The area above the dedicated space may contain foreign systems, provided proper protection prevents damage from drips, leaks, or breaks in these systems. However, it’s good practice to avoid having these systems installed in electrical rooms altogether. While installations of equipment greater than 1,000 V generally follow the same principles, some of the specifics vary, requiring additional clearance around the equipment due to the increased hazard that these voltages impose (see picture above). Access to this equipment is preferably limited to only those deemed qualified to be there. For this reason, electrical equipment should be installed in rooms or spaces that are dedicated for that purpose and have controlled access.
Main Equipment Rooms
The main electrical room, or service entrance space, should coordinate with the local electrical utility. For example, main equipment rooms have requirements that dictate access to the space from the exterior for servicing, maintenance, and service feeder installation. The type of equipment installed will also further determine the room requirements. The service entrance room is typically located on an exterior wall for both code and practical reasons; it makes installation easier and minimizes the length of the service entrance conductors. Because the service conductors are usually the largest in the facility, this can have a substantial impact on cost. Using arc-resistant switchgear will also impact space needs. This equipment will be taller and may have a larger footprint. Engineers will also need to account for the potential exhaust gases and arc flash energy by providing a pathway to expel them and relieve the pressure buildup from inside the switchgear. If an exterior transformer is used to provide the service to a building, feeders from the transformer enter the building and transition to the main service entrance disconnect, typically a switchgear, switchboard, or panelboard. These feeders are often routed underground into the building through the exterior foundation wall via a coordinated opening. Additional coordination with the structural engineer is needed to avoid footings. The elevation of the service entrance conduits many times do not naturally align with the equipment to which it is routed. Additional space in the form of increased height or footprint commonly is required to allow for the successful transition and termination of these conduits and conductors. Service installations that require medium-voltage equipment and/or transformers installed indoors will require additional elements including more space, higher fire ratings of the rooms (per NEC Article 450), and increased ventilation. The location of any exterior equipment also needs to be coordinated with other architectural and landscaping elements. Minimum separation distances are often dictated by local codes/ordinances or utility requirements for proximity to screen walls, fencing, vegetation, paths of egress, or building fenestration. Generator installations offer additional challenges when it comes to defining space needs. Noise, odor, and vibration factor into the location of this equipment within a building. The equipment should be located to minimize disturbances to building occupants and adjacent properties. Many jurisdictions have specific requirements on noise emissions, which will impact equipment placement and other components needed to meet requirements. Increasing the distance of this equipment from sensitive areas is one way of dealing with the concerns, but this comes with added feeder costs and may prove to be more costly than other options. Sound attenuation and equipment required to meet specific emissions requirements, such as diesel oxidation catalyst, particulate filters, urea tanks, and selective catalytic reduction units, have significant cost implications and require a large amount of space to install. Tier 4 versus Tier 2 compliance is usually dictated by an owner’s desire to use a generator for utility peak shaving or other non-critical proposes. It is crucial to have a clear understanding of current and future implications in both of these areas from the outset of a project and to discuss them thoroughly with the building owner. The weight of a generator and the vibration experienced during its operation will have an impact on the building’s structural design. Generators require a lot of ventilation for cooling and combustion needs; getting air into and out of the room is critical and will impact placement. With regard to fuel storage, most installations require a volume of fuel that dictates an external fuel tank with interconnecting fuel lines. NFPA limits the overall capacity of diesel fuel inside buildings to 660 gal. The relationship of the exterior tank and the generator is also important to minimize pumping requirements and allow for gravity-drain return-fuel piping. This requires the fuel tank to be lower in elevation than the generator. Direct access to the outside is preferable for maintenance and testing. All of this requires close coordination with the architectural, structural, and mechanical disciplines. NFPA 110: Standard for Emergency and Standby Power Systems requires the emergency power supply for Level 1 installations to be installed in a separate room, separated from the rest of the building by 2-hour fire-rated construction. While NFPA 110 does allow the emergency power supply system equipment (EPSS; equipment consists of all components from the emergency power supply, or EPS, to the load terminals of the transfer switches) to be installed in the same room as the EPS, it is good practice to keep these separated to help enhance system resiliency. EPS rooms are also prone to additional dust, moisture, temperature fluctuations, and excessive noise during operation that limits the ability to have a conversation and may have a negative impact on other equipment if co-located. For mission-critical facilities (e.g., financial institutions, data centers, and airports) and other highly sensitive installations, the use of a dry-type, pre-action, or another type of fire protection systemthat does not rely on a normally wet piping installation is highly recommended. In cold climates, this has an added advantage of preventing pipes from freezing, rupturing, and potentially flooding the EPS room.
About us Strategic Media Asia (SMA) is one of the approved CPD course providers of the Chartered Institution of Building Services Engineers (CIBSE) UK. The team exists to provide an interactive environment and opportunities for members of ICT industry and facilities’ engineers to exchange professional views and experience.
SMA connects IT, Facilities and Design. For the Data Center Design Consideration, please visit 
(1) Site Selection, (2) Space Planning, (3) Cooling, (4) Redundancy, (5) Fire Suppression, (6) Meet Me Rooms, (7) UPS Selection, (8) Raised Floor, (9) Code & Standards, (10) Transformers and Harmonic Distortion, (11) Multi-mode UPS Systems, and (12) Electrical Rooms
All topics focus on key components and provide technical advice and recommendations for designing a data center and critical facilities.
2 notes · View notes
atopcorporation-blog · 7 years ago
Video
Explore Your Data with Augmented Reality Visualizations in IBM Immersive Insights
IBM Immersive Insights helps users explore their data and communicate findings with the power of Augmented Reality visualizations. Read more:
https://medium.com/@alfredo.ruiz/bringing-data-to-life-with-ibm-immersive-insights-9423687c9ffe
6 notes · View notes
atopcorporation-blog · 7 years ago
Link
Demand for data is growing at a consumer level. How are businesses going to keep up?
0 notes
atopcorporation-blog · 7 years ago
Link
Should Idaho offer tax incentives for data centers?