#labc
Explore tagged Tumblr posts
Text
Official council meeting of Autism

#chase sitting really weird ew#abcL and Donald..#abc#Labc#abcl#lab rats#chase Davenport#Adam sipping on a drink
81 notes
·
View notes
Text
i bring a sort of "this is just like this one time in les miserables" my friends in university don't really like
#les miserables#les mis#les amis de labc#les amis de l'abc#les miserables musical#no because guys this is just like how they were students#guys it's a social justice club it's just like les mis#guys were learning about romanticism that's so dying at the barricade core
322 notes
·
View notes
Text
ATTENTION LES MIS FANDOM!!!!!!
i just finished reading liberte egalite demi-plies on ao3 and i LOVED it but i haven’t read any other enjoltaire fics. PLEASE recommend me some because i’m going feral and i don’t know where to start from lol
#enjolras#enjoltaire#grantaire#les amis de l'abc#les mis#les mis musical#les mis fanart#les mis fanfic#les mis fandom#les mis au#les miserables#les mis enjolras#les mis modern au#enjoltaire fanfic#enjoltaire fanart#lgbtqiia+#lgbtq#i would die for them your honor#liberte egalite demiplies#ballet au#fanfic recs#pleeeease#pretty pleeeeease#fandom#les amis de labc
173 notes
·
View notes
Text
rip gavroche you would’ve loved gen alpha iPad brainrot
#“That’s so skibidi Enjolras”#“Chat”(referring to les amis)#Gavroche#les mis#les miserables#yapping#enjolras#les amis de labc#Grantaire
57 notes
·
View notes
Text
Your Barricade (Chapter One)- A Les Amis Hunger Games AU
Maybe that was why Grantaire did what he did next. Maybe the thought of having to watch the two boys who had cultivated the best in one another have to destroy each other was too overwhelming. Maybe Grantaire knew that any hope of change for the provinces would die with them in the games. Maybe it was the chance to taste that hope, to get close to it before it disappeared forever.
Maybe that was why he stepped forward and frantically called out, “I volunteer.”
https://archiveofourown.org/works/63694225/chapters/163282585
---
hello! if you've been following me for a while you might remember a post I made months ago with an exR playlist attached for a "secret project." this is that project! @alphalils and I have been working on this for about a year now. we started talking about a les amis hunger games au and the more we spoke about it, the more it started to just write itself. with the world as it is, we figured there was no better time to post this than now.
this is an enjoltaire centric hunger games au with almost every other relationship & friendship featured. we consider eponine the third largest character in this work, though her first POV is not for a few more chapters. everyone is featured and has a pretty fleshed out backstory, i cannot wait for you guys to meet these versions of these characters!! :)
big thanks to vicky hugs (victor hugo) for writing the brick, suzanne collins for writing the hungers games, and tbh bizzarestars on ao3 for writing crimson rivers, which helped us with the worldbuidling in our own fic and served as a huge inspiration.
so excited about this one!!!
#les amis de labc#les amis#the hunger games#hunger games au#enjoltaire#enjolras#grantaire#eponine#cosette#eposette#gavroche#les miserables#enjoltaire fanfic#combeferre#courfeyrac#jehan prouvaire#the brick
15 notes
·
View notes
Text
The Alphabet Mafia? Did les Amis de l'ABC rename themselves?
5 notes
·
View notes
Text

Empty chairs at empty tables
20 notes
·
View notes
Text
Me? Posting TikToks about les mis? Who’s fucking surprised
+ the return of my boy combefurr
feel free to follow me if you want, all i’ll ever post is les mis
#logan speaks#jehan speaks#les mis#les miserables#enjoltaire#grantaire#les amis#les amis de l'abc#enjolras#les misérables#combeferre#combefurr#my boy#courferre#courfeyrac#combeferre x courfeyrac#Courfeyrac x combeferre#les amis de labc#TikTok
36 notes
·
View notes
Text
les amis mariokart mains
enjolras: toad courfeyrac: luigi combeferre: daisy grantaire: waluigi bahorel: bowser jehan: yoshi joly: donkey kong bossuet: wario feuilly: shy guy
bonus!
marius: baby mario (or regular mario if baby not available) cosette: peach eponine: rosalina
#les amis#les mis#enjolras#courfeyrac#combeferre#grantaire#bahorel#jehan#joly#bossuet#feuilly#marius#cosette#eponine#les amis de labc#les miserables#enjoltaire
8 notes
·
View notes
Text
NO I MISSED IT
Today is 24601. Happy pride month.
3K notes
·
View notes
Text


We know, Lance. We know😏
0 notes
Text
caught myself saying "i have a vague ambition in that direction" when asked about my job prospects is it too late for my les miserables riddled brain
#i have a vague ambition in that direction#les miserables#les amis de labc#les mis#les amis de l'abc#les miserables musical#grantaire#enjolras
104 notes
·
View notes
Text
probably not going to clean this up ever but here's my How the Triumvirate Formed hc. combeferre carrying les amis de labc on his back
82 notes
·
View notes
Text
studied a little bit but my head feels so full of Stuff so I'm gonna have to lay down while this Sudafed kicks in.
Sudafed usually makes me kind of crabby so I only take it as a last resort, and I am desperate rn. I cannot focus on what I'm supposed to do. 😭
so it's nap time and then back on the study train. I might do some practice questions on LabCE or something bc that's a little easier than writing when it comes to Bad Brain Time.
14 notes
·
View notes
Text
Box Frame or Goal Posts?
The use of steel is essential in all structural modifications. Its use allows Structural Engineers and Builders to achieve Clients requirements of spanning across openings. Sometimes adding a steel beam is not sufficient which means the project needs a steel box frame or goal posts. This page tries to answer frequently asked questions regarding the use of a box frame or goal posts during the structural modification of masonry structures and buildings (residential, commercial and industrial).
A box frame or a goal post?
Clients and contractors often ask this question. When removing a substantial part of an external wall, there is more to consider than just the vertical loads. For example, many homeowners want to knock down as much of the rear wall as possible to create an open-plan kitchen-diner when building a rear extension. As structural failures are not only caused by vertical forces, it is important to consider resistance to lateral loads such as wind. Traditional masonry houses have cross walls or shear walls. The party walls have “buttressing” walls that provide lateral stability which are the front/rear walls and a cross wall in the middle. The masonry can this way transmit wind and lateral loads in all directions safely to the ground. Homeowners carrying out structural modifications to their properties may inadvertently strip their property (and neighbouring properties) of this “lateral stiffness”. It is important to carry out these works in a safe and compliant manner, as otherwise it could lead (in the worst scenario) to the collapse of the party wall and may contribute to the collapse of a whole block of flats or a terrace of houses like a “house of cards”.
Compliance and Building Regulations
To ensure masonry buildings maintain the required lateral stiffness, the Building Regulations Approved Document A sets some conditions on openings in structural walls. Approved Document A limits the amount of external or buttressing wall that can be removed and insists that the corners or returns of these walls are substantial. The guidance states that no more than 66% of an external or buttressing wall can be removed and that a min of a 550mm (665 external measured from the centreline of the party wall or external wall) return is maintained. Please refer to Diagram 12 in Approved Document A of the Building Regulations. If this guidance can’t be achieved a portal or a box frame is required. We encourage clients interested to refer to Document A of the Building Regulations or to LABC technical guidance.
Why you need a Structural Engineer?
Structural Engineers can design steel box frames (picture frames) or steel portal frames (goal posts). Our designs allow homeowners to comply with Building Regulations and achieve an architectural layout that suits the aspirations of modern lifestyle of maximum openness and ease of movement. Below is a description of the main three structural options available to any homeowner undertaking a rear extension or converting a rear reception into a kitchen diner. If you have any question regarding the information provided below, please do not hesitate to contact us to seek advice. We are happy to explain to you the technical, regulatory and cost impacts of each option.
Option 1: Use of a steel beam supported on masonry returns
If the client or the contractor is able to retain a minimum return of 550mm either side of the opening, then this would be the right choice. A steel beam would support the loads from above. This steel beam is rests on pad-stones that are spread the loads to the masonry returns preventing the crushing of the relatively soft masonry. The beam width matches the width of the supported wall and takes into account whether there is any moisture.
The Structural Engineer would produce a design and a drawing for the use of the builder who is pricing and carrying out the works. The design and drawing also form part of an application to Building Control to ensure compliance with the Building Regulations Approved Document A.
Advantages: minimum demolition, short construction time, less expensive than other options. The return of the wall is conveniently similar to a kitchen counter width. Disadvantages: the opening achieved does not give the maximum openness that some homeowners may want.
Option 2: Use of portal frame (goal posts)
The opening is as wide as possible because the clients intends to remove the whole of the rear wall between the two flank walls (party walls). The builder secures the first floor and the wall above using adequate temporary supports. Following the securing of the property, the contractor inserts a steel portal frame. The steel frame refers to two columns and a top beam. The top column transfers the loads to the two columns using moment/rigid connections. The two columns transfer loads to new foundation cast at the edges next to the flank wall. The columns would be at the edge of these new foundations. The frame columns provide lateral stability to the masonry walls so the contractor needs to use chemical fixings to attach the steel columns to the masonry walls to compensate for the lost lateral stiffness.
Advantage: the client can have the maximum opening. Steel columns can be H section 152x152mm to 254x254mm depending on the opening span and loads from above (as well as sway forces from wind).
Disadvantage: the main disadvantage is the need for new foundations. Columns are at the edge of the foundations, causing eccentric loading so foundations size could be quite large to counteract the eccentric loading and to spread the load without over-stressing the soil. Option 2 requires a higher budget and a longer construction time than option 1.
Option 3: Use of box frame (picture frame)
Description: the opening is as wide as possible. The whole of the rear wall between the two flank walls (party walls) would require removal (obviously after the builder secures the first floor and the wall above using properly chosen temporary supports). The contractor would need to insert a steel box frame (a top steel beam on two steel columns sitting in turn on a bottom steel beam). The bottom beam is encased in concrete and supported on the old corbelled brickwork foundation that lies underneath the removed wall. The connections between the columns and the beams are moment/rigid connections and we provide the details and design for them. Alternatively the fabricator may have an in-house Structural Engineer to undertake the design and detailing based on the forces from the Structural Engineer.
Advantage: this options results in a maximum opening. Steel columns can be H section 152x152mm to 254x254mm depending on the opening span and loads from storeys above (as well as sway forces from wind). The use of the corbelled masonry foundation of the original wall to support the box frame would minimize ground works.
Disadvantage: the main disadvantage is the increased cost of steelwork. However, the savings in ground works cost and time outweigh the slight increase in steel cost.
So what is better, Box Frame or Goal Posts?
Structural Engineers recommend option 1 for all cases except where the client has already decided to achieve a maximum opening. To achieve the maximum openness, we highly recommend option 3: use of a steel box frame. We have developed a standard method of designing these box frames and provide detailed fabrication drawings that would allow the accurate production and fabrication of the box frame steel. Many steel yards do not have the benefit of an in-house engineer and even if they do, they would charge clients for detailing connections. Our standardized fabrication drawings allow our clients to use any steel yard to procure steel ensuring competitive rates on the steel cost and saving time and cost.
#steel beam#steel beams#timber structure#structure#glulam#box frame#goal posts#portal frame#steel beam connections
2 notes
·
View notes
Text
all james potter kins are courfeyrac kins sorry i don’t make the rules
16 notes
·
View notes